Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20211P493 + (02:25:50, 6 December 2024)
- ML20211P489 + (02:25:53, 6 December 2024)
- ML20211P488 + (02:25:54, 6 December 2024)
- ML20211P487 + (02:25:55, 6 December 2024)
- 05000029/LER-1986-006, :on 860619,blowdown Line from Steam Generator 3 Isolated (Closed VD-V-631) in Preparation to Repair Leak in Downstream Line & Declared Inoperable.Line Returned to Svc on 860621 + (02:25:57, 6 December 2024)
- ML20211P485 + (02:25:57, 6 December 2024)
- 05000369/LER-1986-011-02, :on 860605,diesel Generator 1A Automatically Started Due to Train a Blackout Actuation.Caused by Design Deficiency.Ite 27H-type Relays on 4,160-volt Switchgear Group 1ETA Replaced + (02:25:59, 6 December 2024)
- ML20211P479 + (02:26:00, 6 December 2024)
- ML20211P477 + (02:26:01, 6 December 2024)
- ML20211P476 + (02:26:01, 6 December 2024)
- IR 05000423/1987001 + (02:26:03, 6 December 2024)
- ML20211P473 + (02:26:04, 6 December 2024)
- 05000275/LER-1986-018-01, :on 860830,pressurizer Code Safety Valves Found Out of Tech Spec Limit During Surveillance Test Procedure M-77.Caused by Failure to Drain Loop Seal Upstream of Valves Prior to Test + (02:26:06, 6 December 2024)
- ML20211P469 + (02:26:07, 6 December 2024)
- ML20211P470 + (02:26:07, 6 December 2024)
- ML20211P468 + (02:26:08, 6 December 2024)
- IR 05000424/1987008 + (02:26:09, 6 December 2024)
- ML20211P463 + (02:26:12, 6 December 2024)
- ML20211P459 + (02:26:13, 6 December 2024)
- ML20211P462 + (02:26:13, 6 December 2024)
- ML20211P455 + (02:26:14, 6 December 2024)
- ML20211P457 + (02:26:14, 6 December 2024)
- ML20211P453 + (02:26:17, 6 December 2024)
- ML20211P452 + (02:26:18, 6 December 2024)
- ML20211P451 + (02:26:18, 6 December 2024)
- ML20211P450 + (02:26:20, 6 December 2024)
- ML20211P448 + (02:26:21, 6 December 2024)
- IR 05000344/1986019 + (02:26:24, 6 December 2024)
- ML20211P445 + (02:26:25, 6 December 2024)
- ML20211P444 + (02:26:25, 6 December 2024)
- ML20211P443 + (02:26:26, 6 December 2024)
- ML20211P438 + (02:26:26, 6 December 2024)
- ML20211P436 + (02:26:27, 6 December 2024)
- ML20211P433 + (02:26:28, 6 December 2024)
- ML20211P434 + (02:26:28, 6 December 2024)
- ML20211P431 + (02:26:29, 6 December 2024)
- ML20211P432 + (02:26:29, 6 December 2024)
- ML20211P429 + (02:26:30, 6 December 2024)
- ML20211P426 + (02:26:31, 6 December 2024)
- ML20211P428 + (02:26:31, 6 December 2024)
- ML20211P424 + (02:26:32, 6 December 2024)
- 05000458/LER-1986-041, :on 860614,turbine Tripped on High Vibration at Control Valve 1 Bearing.Caused by Momentary Rise in Vibration.Test Procedure Changed to Bypass High Vibration Trip Function During Valve Testing + (02:26:34, 6 December 2024)
- ML20211P422 + (02:26:36, 6 December 2024)
- ML20211P421 + (02:26:36, 6 December 2024)
- ML20211P420 + (02:26:37, 6 December 2024)
- 05000528/LER-1986-058, :on 870123,discovered That on 861202 Four Consecutive Daily Radiation Monitor Channel Checks Not Correctly Performed.Caused by Personnel Error.Radiation Protection Technician Terminated + (02:26:41, 6 December 2024)
- ML20211P417 + (02:26:42, 6 December 2024)
- ML20211P416 + (02:26:43, 6 December 2024)
- IR 05000460/1986001 + (02:26:44, 6 December 2024)
- ML20211P413 + (02:26:44, 6 December 2024)
- ML20211P412 + (02:26:45, 6 December 2024)