JOSEPH M. FARLEY NUCLEAR PLANT UNIT 1 NARRATIVE Sl5 MARY OF OPERATIONS November, 1986 The Cycle 'VII - VIII refueling outage continued into the month of November.
The following major safety-related maintenance was performed in the month of November:
1.
The reactor vessel flange seal area was cleaned and new O-ring-seals were installed.
2.
The containment integrated leak rate test was performed successfully.
3.
The hydraulic and mechanical snubber testing was completed.
4.
The hydraulic snubbers on lA steam generator were modified to correct a design error which was caused by an incorrect vendor drawing.
5.
The IC Reactor Coolant Pump #1 seal housing 0-ring leak was repaired.
6.
Miscellaneous corrective and preventive maintenance was performed
,on diesel generators.
s i
k
~
B703020369 861209 PDR ADOCK 05000348 R
s OPERATING DATA REPORT DOCKET NO.90-14R DATE 12/2/86 COMPLETED BY J. D. Woodard 1
TELEPHONE (70% 899-5156 l
s OPERATING STATUS Notes Joseph M. Farley - Unit 1
- 1. Unit Nune.
November, 1986
- 2. Reportug Penod:
?^9'
- 3. Licensed Thennal Power (MWt):
12-01-77, date of 860
- 4. Nameplate Rating (Gross MWe):
commercial operatidn.
829
- 5. Demen Electncal Rating (Net MWe):
873.4
- 6. Maximma Dependable Capacity (Grom MWe):
827.5
- 7. Maximum Dep==dahle Capacity (Net MWe):
- 8. If Changea Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
N/A N/A
- 9. Power Level To Wluch Restricted,If Any (Net MWe):
- 10. Reasons For Restrictions,if Any:
N/A This Month Yr. to.Dete Cumulative 770 R n16 7R,RRR
- 11. Hours in Reportmg Period 0.0 6,532.4 56,165.5
- 12. Number Of Hours Reactor Was Critical
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 3.650.0 0.0 6,505.0 54,910.0
- 14. Hours Generator On-Line 0.0 0.0 0.0
- 15. Unit Reserve Shutdown Hours 0
16.739.470 119.611,012
- 16. Gross Thermal Energy Generated (MWH)
- 17. Gross Electncal Energy Generated (MWH)
- 24 5,500,018 44,'803.398
-11.944 5,197,844 42,195,562 f
- 18. Net Electncal Energy Generated (MWH) 0.0 81.2 69.6
- 19. Unit Service Factor 0.0 81.2 69.6
- 20. Unit Availability Factor
-2 0 7R.4 66.6
- 21. Unit Capacity Factor (Using MDC Net)
-2.0 78.2 64.5
- 22. Unit Capacity Factor (Using DER Net) 0.0 1.8 10.6
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration of Each):
N/A l
l l
12/02/86 l
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achieved 08/06/77 08/09/77 INITIAL CRITICALITY INITIAL ELECTRICITY nn/?n/77 08/18/77 12/01/77 12/01/77 COMMERCIAL OPERATION (W77 )
l l
c DOCKET NO.
50-348 UNIT One DATE 12/02/86 COMPLETED BY J.D. Woodard Os TELEPl{0NE (205) 899-5156 310NTl!
November
/
DAY AVERACE DAILY PO VER LEVEL DAY' AVERACE DAILY POWER LEVEL
@lWe-Net)
QlWe-Net) 0 37 0
2 0
13 0
~
~~
- o --
19 - -
0 3
4 0
20 0
o 21 0
0 6
0
,n 7
0 23 0
g 0
24 0
9 0
25-O 10 0
26 0
11 0
27 0
0 23 0
12 13 0
- 9 0
0 0
14 30 0
15 3g 16 0
ELSTRUCTIONS On this formst. list the 2versge dsily unit power Icvelin MWe Net for c:ch d:y in the reporting month. Compute to
, the neare:t whole megswatt.
(997)
O
O O
O j
UNITS 1101 DOWNS AND POWER REIH)CIlONS l)OCKET NO. _50-348 1
UNIT NAhlE 3 M_
Farlev - Unit 1 DATE nocamhar L 1986 REPORT hlON111 November COblPLETEI) ny T n unnanra TEl.EPHONE (205) 899-5156 i
1 e
No.
Date E.
'S I k
3gg Licens" 6%
3"L Y se E 8:
rs g
Cause a Connective 0
U Ege Even 3,7 guy Ac,io,,,
O:j un u
$ is l Repost #
g P8 vcut Hecuricace 55 1
l 010 861101 S
720.0 C
1 N/A N/A N/A The Cycle VII - VIII refueling outage l
continued from 10-03-86.
I 1
l I,
I, i
i 1
1 2
3 4
I F: l'osced Reason:
Method:
Exhibit G -Instructions S: Stheduled A Equipment Failusc(Explain) 1 -klanual for Picparation of Data li klaintenance of Test 2%nual Scram.
Entry Sheets fos I.icensee C Itefueling 3 Automatic Scram.
Event Reposi (1.ER) file INUREG-D Itegulatiny Resiniction 4-Oaher (Explain) 0161)
E-Opcutor Tsaining & license Exandnatiun 3
F Adudnistsative 5
G Openalianal listos (Explain)
Exliibit 1. Same Source (9/77)
II Olhes (lixplain) i
on l
4 L
l l
O
^%
.y o ' " D G,
)h t
ii s'I DEC 1986 E
?
=!
RECFr#D Ul MG5t NUC N/
ADMtNSTRATIOtt
? >/
s(
D /
5$<
q18/
. 0'
. s; n z./z%, -
~
yr.
O 9
- - -