Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20211R071 + (02:04:49, 6 December 2024)
- ML20211R073 + (02:04:49, 6 December 2024)
- ML20211R066 + (02:04:50, 6 December 2024)
- ML20211R067 + (02:04:50, 6 December 2024)
- ML20211R065 + (02:04:51, 6 December 2024)
- U-603269, Certifies That DB Livingston,License OP-31136,successfully Completed Facility Licensees Requirements to Be Licensed as Ro,Per 10CFR55 & Has Need for RO License to Perform Assigned Duties.Five Significant Control Manipulations,Listed + (02:04:52, 6 December 2024)
- ML20211R064 + (02:04:52, 6 December 2024)
- ML20211R061 + (02:04:53, 6 December 2024)
- ML20211R059 + (02:04:54, 6 December 2024)
- ML20211R057 + (02:05:00, 6 December 2024)
- ML20211R054 + (02:05:00, 6 December 2024)
- ML20211R049 + (02:05:01, 6 December 2024)
- ML20211R044 + (02:05:02, 6 December 2024)
- ML20211R045 + (02:05:02, 6 December 2024)
- ML20211R041 + (02:05:05, 6 December 2024)
- ML20211R040 + (02:05:05, 6 December 2024)
- ML20211R036 + (02:05:06, 6 December 2024)
- ML20211R038 + (02:05:06, 6 December 2024)
- ML20211R035 + (02:05:10, 6 December 2024)
- 05000461/LER-1999-011, :on 990816,improper Restoration of a APRM Caused Monitor to Not Meet Seismic Qualification Requirements.Caused by Lack of Knowledge.Page Latches for Other APRMs Were Inspected & No Anomolies Were Found + (02:05:12, 6 December 2024)
- ML20211R031 + (02:05:13, 6 December 2024)
- ML20211R026 + (02:05:14, 6 December 2024)
- ML20211R027 + (02:05:14, 6 December 2024)
- ML20211R025 + (02:05:15, 6 December 2024)
- 05000278/LER-1999-003-03, :on 990814,HPCIS Was Declared Inoperable Due to Erratic Behavior Resulting in Loss of Single High Train Safety Sys.Caused by Weakness in Procedural Guidance. Readjusted Hydraulic Governor Needle Valve.With + (02:05:20, 6 December 2024)
- PNO-II-86-091A, Unit 2 Feedwater Pipe Rupture Resulted in Two Deaths as of 861211,w/four Other Workers Hospitalized.Unit 1 Shutting Down.Extensive Erosion/Corrosion Found Inside Pipe. NRC Augmented Insp Team Onsite.Investigation Continuing + (02:05:21, 6 December 2024)
- ML20211R015 + (02:05:22, 6 December 2024)
- ML20211R018 + (02:05:22, 6 December 2024)
- ML20211R014 + (02:05:23, 6 December 2024)
- ML20211R013 + (02:05:23, 6 December 2024)
- ML20211R012 + (02:05:24, 6 December 2024)
- ML20211R011 + (02:05:25, 6 December 2024)
- ML20211R010 + (02:05:25, 6 December 2024)
- ST-HL-AE-1930, Forwards camera-ready Tech Spec Proof & Review Figures 2.1-1,3.1-1,3.2-1,3.2-2,3.4-1,3.4-2,3.4,3,3.4-4 & B 3/4.4-1, for Info & Use + (02:05:26, 6 December 2024)
- ML20211R007 + (02:05:27, 6 December 2024)
- ML20211R008 + (02:05:27, 6 December 2024)
- PNO-II-86-091B, tour Conducted for Reporters of Site of 861209 Pipe Break Event.On 861212,pump Discharge Check Valve Inspected,Revealing One Missing Hinge Pin & Unseated Valve Disc.Nrc Pipe Break Specialist Onsite + (02:05:28, 6 December 2024)
- 05000424/LER-1987-002-01, :on 870122,potential Failure of MSIVs to Close Following Small Steam Line Break.Cause Under Investigation. MSIVs Modified to Include Addition of Relief Valve in Hydraulic Sys of Actuator.Part 21 Related + (02:05:30, 6 December 2024)
- ML20211R004 + (02:05:30, 6 December 2024)
- ML20211R003 + (02:05:31, 6 December 2024)
- ML20211Q999 + (02:05:32, 6 December 2024)
- ML20211R000 + (02:05:32, 6 December 2024)
- ML20211Q996 + (02:05:33, 6 December 2024)
- ML20211Q997 + (02:05:33, 6 December 2024)
- ML20211Q994 + (02:05:35, 6 December 2024)
- ML20211Q995 + (02:05:35, 6 December 2024)
- ML20211Q992 + (02:05:36, 6 December 2024)
- ML20211Q993 + (02:05:36, 6 December 2024)
- ML20211Q991 + (02:05:37, 6 December 2024)
- ML20211Q989 + (02:05:37, 6 December 2024)
- ML20211Q987 + (02:05:38, 6 December 2024)
- ML20211Q982 + (02:05:39, 6 December 2024)