Forwards Insp Rept 50-285/86-18 on 860601-30 & Notice of Deviation
ML20211R045
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 07/23/1986
From: Gagliardo J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Andrews R
OMAHA PUBLIC POWER DISTRICT
Shared Package
ML20211R051 List:
References
RTR-NUREG-0737, RTR-NUREG-737 NUDOCS 8607280086
Download: ML20211R045 (2)


See also: IR 05000285/1986018

Text

o ,

.

"

JUL 2 31986

In Reply Refer To:

Docket: 50-285/86-18

.

\

Omaha Public Power District

ATTN: R. L. Andrews, Division Manager-

Nuclear Production

1623 Harney Street

Omaha, Nebraska 68102

Gentlemen:

This refers to the inspection conducted by P. H. Harrell of this office during

the period June 1-30, 1986, of activities authorized by NRC Operating

License DPR-40 for the Fort Calhoun Station, and to the discussion of our

findings with Mr. W. G. Gates at the conclusion of the inspection.

Areas examined during the inspectior included operational safety verification;

maintenance; surveillance; plant tours; safety-related system walkdown;

followup on a'previously identified item; followup on IE Information Notices

and.IE Bulletins issued for information only; followup on a licensee event

report; and fo)lowup on NUREG-0737 (TMI) Item I.D.2, implementation of a

safety parameter display system. Within these areas, the inspection consisted

aof selective examination of procedures and representative records, interviews

with personnel, and observations by the inspector. The findings are documented

in the-enclosed inspection report.

During this inspection, it was found that certain of your activities appeared

to deviate from a commitment made to the NRC. This item and references to the

commitment are identified in the enclosed Notice of Deviation. You are

requested to respond to this deviation in writing. Your response should be

based on the specifics contained in the Notice of Deviation enclosed with this

letter.

We have also examined actions you have taken with regard to previously

identified inspection findings. The status of these items is identified in

paragraph 2 of the enclosed ' inspection report.

The response directed by this letter and the accompanying Notice are not

subject to the clearance procedures of the Office of Management and Budget as

required by the Paperwork Reduction Act of 1980, PL 96-511.

4

f

A '

RIV:RPB/ C:RP8/ C:RPB /

MEMurph /tw DRHunt.. JEGagli do

7ll0/86 q / st /86 7 /s.t./p

h500$$85

- y

,

,

Omaha Public Power District -2-

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

Sincerely,

Original Signed bys

J. E. GAGLIARDO*

J. E. Gagliardo, Chief

.

Reactor Projects Branch

Enclosures: -

1. Appendix A - Notice of Deviation

2. ^ Appendix B.- NRC Inspection Report

c 50-285/86-18 .

cc.w/ enclosures:

W. G.. Gates, Manager

-

" Fort Calhoun Station -

P. O. Box 399'

Fort Calhoun, Nebraska 68023

Harry H. Voigt, Esq.

LeBoeuf, Lamb, Leiby & MacRae

1333 New Hampshire Avenue, NW

Washington, DC 20036

Kansas Radiation Control Program Director

I Nebraska Radiation Control Program Director

bec to DMB (IE01)

bcc distrib. by RIV:

  • RPB * Resident Inspector R. D. Martin, RA

l

  • R&SPB *Section Chief (RPB/B) *RSB

'

  • RIV File DRSP
  • MIS SYSTEM *RSTS Operator
  • w/766

r

1

I

,- . - , - - ~ . . _ . , . - , . - - . - . , . , - - . . . . , . . . . . , ,- -