Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20212B402 + (01:40:46, 6 December 2024)
- ML20212B401 + (01:40:46, 6 December 2024)
- ML20212B399 + (01:40:47, 6 December 2024)
- ML20212B397 + (01:40:48, 6 December 2024)
- ML20212B398 + (01:40:48, 6 December 2024)
- ML20212B395 + (01:40:49, 6 December 2024)
- ML20212B392 + (01:40:50, 6 December 2024)
- ML20212B393 + (01:40:50, 6 December 2024)
- ML20212B391 + (01:40:51, 6 December 2024)
- ML20212B390 + (01:40:52, 6 December 2024)
- 05000456/LER-1986-006-09, :on 861204,Action Statement 3.3.3.10 Re Failure of Auxiliary Bldg Effluent Radiation Monitor 1RT-PR028 Not Being Followed.Caused by Personnel Cognitive Error.Personnel Counseled + (01:40:55, 6 December 2024)
- ML20212B385 + (01:40:56, 6 December 2024)
- IR 05000812/2010031 + (01:40:58, 6 December 2024)
- ML20212B379 + (01:40:59, 6 December 2024)
- HL-5501, Forwards Test Results That Envelop Corner Frequency & Period Tolerance Settings,In Response to NRC Request Re 970620 Request for Approval of Revised Oscillation Power Range Monitor + (01:40:59, 6 December 2024)
- ML20212B378 + (01:41:00, 6 December 2024)
- ML20212B376 + (01:41:01, 6 December 2024)
- ML20212B373 + (01:41:02, 6 December 2024)
- 05000336/LER-1997-032-02, :on 970922,identified That Two of Sixteen Valves Failed to Open within TS Allowable Lift Set Pressures.Cause of Setpoint Drift Unknown.Valves Will Be Rebuilt,Set to Required Set Pressures & Tested + (01:41:05, 6 December 2024)
- 05000388/LER-1986-009-01, :on 860708,Limiting Condition for Operation 3.0.3 Entered Twice.Caused by Surveillance Procedure SI-280-305 Being Performed While RCIC Sys Inoperable.W/ + (01:41:09, 6 December 2024)
- ML20212B368 + (01:41:09, 6 December 2024)
- ML20212B367 + (01:41:10, 6 December 2024)
- ML20212B366 + (01:41:10, 6 December 2024)
- ML20212B364 + (01:41:13, 6 December 2024)
- 05000361/LER-1986-021, :on 860720,spurious Actuation of Fuel Handling Isolation Sys Train B Occurred When Airborne Monitor 2RE-7823 Alarmed.Caused by Random Electrical Noise Spike. Detector Replaced + (01:41:13, 6 December 2024)
- ML20212B363 + (01:41:14, 6 December 2024)
- W3P86-2982, Responds to Addl Questions Re Changes to Large Break LOCA Analytical Models Since Cycle 1 Break Spectrum Performed & Why 0.8 double-ended Guillotine Break Remains Limiting Break Size + (01:41:15, 6 December 2024)
- ML20212B359 + (01:41:16, 6 December 2024)
- ML20212B356 + (01:41:17, 6 December 2024)
- ML20212B354 + (01:41:18, 6 December 2024)
- ML20212B351 + (01:41:19, 6 December 2024)
- ML20212B350 + (01:41:19, 6 December 2024)
- ML20212B349 + (01:41:22, 6 December 2024)
- 05000336/LER-1997-032, Forwards LER 97-032-00 Which Documents Event That Occurred at Mnps,Unit 2 on 970922.Commitment Made within Ltr,Listed + (01:41:25, 6 December 2024)
- ML20212B342 + (01:41:29, 6 December 2024)
- 05000397/LER-1986-023, :on 860710,reactor Scram Occurred Following Opening of Incorrect Circuit Breaker During Electrical Ground Isolation.Caused by Personnel Error.Engineer Drawing & Circuit Breaker Labeling Will Be Changed + (01:41:34, 6 December 2024)
- IR 05000293/1986034 + (01:41:48, 6 December 2024)
- 05000361/LER-1986-009-01, :on 860416,inservice Insp Identified Excessive Wear of Hinge Pins in 4-inch Tilting Disc Check Valves. Caused by Continual Oscillation of Valve Disc.Satellite Sleeves Installed + (01:41:50, 6 December 2024)
- 05000250/LER-1987-006, :on 870123,w/both Units 3 & 4 at 100%, Requirements of Tech Spec 3.8.4.b Not Met.Caused by Erroneous Flow Indication of FI-1457A from Air in Sense Line of Associated Flow Transmitter.Line Vented + (01:41:54, 6 December 2024)
- ML20212B336 + (01:41:55, 6 December 2024)
- 05000336/LER-1997-031-02, :on 970918,discovered That Potential Effects on safety-related Equipment Were Located Outside Containment. Caused by Helbs.Present Pipe Associated W/Postulated HELB Will Be Evaluated + (01:41:58, 6 December 2024)
- B12370, Proposed Tech Specs Deleting Control Bldg Inlet Ventilation Radiation Signal from Tables 3.3-6 & 4.3-3 & Corresponding Action Statement 27 + (01:41:58, 6 December 2024)
- ML20212B329 + (01:41:59, 6 December 2024)
- ML20212B327 + (01:42:00, 6 December 2024)
- ML20212B325 + (01:42:02, 6 December 2024)
- 05000327/LER-1986-026, :on 860629,sudden Pressure Relay Failed on Common Station Svc Transformer D,Causing Fire Suppression Sys to Spray Transformer W/Water & Subsequent Transformer Trip.Caused by Shortened Microswitch in Relay Housing + (01:42:02, 6 December 2024)
- ML20212B322 + (01:42:03, 6 December 2024)
- 05000414/LER-1986-022, :on 860603,feedwater Isolation Occurred Due to Malfunction of Reactor Trip Breaker Control Switch.Operator Update Issued Addressing Proper Method of Manipulating Breaker Control Switches.Switch Will Also Be Replaced + (01:42:05, 6 December 2024)
- ML20212B320 + (01:42:06, 6 December 2024)
- ML20212B315 + (01:42:11, 6 December 2024)
- ML20212B314 + (01:42:11, 6 December 2024)