PHILADELPHIA ELECTRIC COMPANY 2301 M ARKET STREET P.O. BOX 8699 PHILADELPHI A. PA.19101 82m 845 4ow February 20, 1987.
Docket Nos. 50-277 50-278 Mr. Daniel R. Muller, Director BWR Project Directorate #2 ATTN:
Document Control Desk US Nuclear Regulatory Commission Washington, D.C.
20555
SUBJECT:
1986 Annual Report on Safety-Relief Valve Challenges at Peach Bottom Atomic Power Station Report No. 7
Dear Mr. Muller:
This is the seventh annual report on safety-relief valve challenges for the Peach Bottom Atomic Power Station as required by NRC Action Plan, Item II.K.3.3.
The definition of challenges considered in this report is the automatic opening of the primary coolant system safety or relief valves in response to a high reactor pressure condition. 'During 1986, there were no challenges to the primary coolant system safety and relief valves on Peach Bottom Units 2 and 3.
Should you have any questions regarding this matter, please do not hesitate to contact us.
l Very truly yours, W.
M.
Alden Engineer-In-Charge Licensing Section Nuclear Support Department l
Attachment l
l cc:
Dr. T.
E. Murley, NRC Mr.
T.
P. Johnson, Resident Site Inspector
@\\1 45 870220 D
g G7030 bCK05000277 I
PDR PDR R