Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19253B876 + (13:25:13, 4 January 2025)
- ML19253B877 + (13:25:13, 4 January 2025)
- ML19253B873 + (13:25:14, 4 January 2025)
- ML19253B872 + (13:25:14, 4 January 2025)
- ML19253B870 + (13:25:15, 4 January 2025)
- ML19253B869 + (13:25:15, 4 January 2025)
- ML19253B867 + (13:25:16, 4 January 2025)
- 05000289/LER-1978-028-01, /01T-0:on 780908,during Calibr of Sodium Hydroxide Tank Level Transmitter as Part of Refueling Interval Surveillance,Tank Was Found in Contain Excess 215 Lb of Sodium Hydroxide.Caused by Transmitter Calibr Drift + (13:25:17, 4 January 2025)
- 05000289/LER-1978-028, Forwards LER 78-028/01T-0 + (13:25:19, 4 January 2025)
- ML19253B863 + (13:25:20, 4 January 2025)
- ML19253B861 + (13:25:21, 4 January 2025)
- 05000289/LER-1978-022-03, /03L-0:on 780723,A Emergency Diesel Generator Air Valve Found Tagged Shut,Rendering a Diesel Inoperable.Caused by Personnel Error.All Operations Dept Personnel Briefed on Testing Redundant Engineered Safeguards Sys + (13:25:22, 4 January 2025)
- 05000289/LER-1978-022, Forwards LER 78-022/03L-0 + (13:25:24, 4 January 2025)
- 05000289/LER-1978-023-03, /03L-0:on 780805,during Power Reduction to 65% Full Power,Incore Detector Quadrant Power Tilt Limit Was Exceeded for 50 Minutes.Max Tilt 3.79%.Caused by Xenon Buildup & Control Rod Insertion.Tilt Returned within Limits + (13:25:26, 4 January 2025)
- 05000289/LER-1978-023, Forwards LER 78-023/03L-0.Event Did Not Require Reporting Per 780815 Discussion W/Nrc.Future Similar Events Will Not Be Reported + (13:25:28, 4 January 2025)
- ML19253B854 + (13:25:34, 4 January 2025)
- 05000289/LER-1978-025-01, /01T-0:on 780818-19,neither of Two Inservice Nuclear River Water Pumps Were Selected to Start on Engineered Safeguards Signal.Caused by Personnel Error. Pumps Selected & Personnel to Be Briefed + (13:25:36, 4 January 2025)
- ML19253B852 + (13:25:37, 4 January 2025)
- ML19253B851 + (13:25:39, 4 January 2025)
- 05000289/LER-1978-025, Forwards LER 78-025/01T-0 + (13:25:42, 4 January 2025)
- ML19253B848 + (13:25:43, 4 January 2025)
- ML19253B847 + (13:25:45, 4 January 2025)
- ML19253B845 + (13:25:47, 4 January 2025)
- ML19253B846 + (13:25:47, 4 January 2025)
- ML19253B844 + (13:25:49, 4 January 2025)
- ML19253B842 + (13:25:50, 4 January 2025)
- ML19253B841 + (13:25:51, 4 January 2025)
- ML19253B840 + (13:25:53, 4 January 2025)
- ML19253B838 + (13:25:54, 4 January 2025)
- ML19253B839 + (13:25:54, 4 January 2025)
- ML19253B836 + (13:25:56, 4 January 2025)
- ML19253B835 + (13:25:57, 4 January 2025)
- ML19253B834 + (13:25:58, 4 January 2025)
- ML19253B833 + (13:26:00, 4 January 2025)
- ML19253B832 + (13:26:01, 4 January 2025)
- ML19253B830 + (13:26:02, 4 January 2025)
- NUREG-0181, Forwards NUREG/CR-0181 to All Power Reactor Licensees Re Basic Barrier & Penetration Data for Physical Security Sys Assessment.W/O Encl.Addressed to All Power Reactor Licensees & Applicants + (13:26:07, 4 January 2025)
- ML19253B828 + (13:26:09, 4 January 2025)
- ML19253B827 + (13:26:11, 4 January 2025)
- ML19253B826 + (13:26:12, 4 January 2025)
- ML19253B825 + (13:26:12, 4 January 2025)
- ML19253B824 + (13:26:14, 4 January 2025)
- ML19253B822 + (13:26:15, 4 January 2025)
- ML19253B821 + (13:26:15, 4 January 2025)
- ML19253B819 + (13:26:16, 4 January 2025)
- ML19253B818 + (13:26:17, 4 January 2025)
- ML19253B817 + (13:26:18, 4 January 2025)
- ML19253B816 + (13:26:19, 4 January 2025)
- ML19253B813 + (13:26:21, 4 January 2025)
- ML19253B812 + (13:26:22, 4 January 2025)
- PM-79-892, Forwards Monthly Operating Rept for Sept 1979 + (13:26:23, 4 January 2025)