MONTHYEARHL-5845, Monthly Operating Repts for Sept 1999 for Ei Hatch Nuclear Plant.With1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Ei Hatch Nuclear Plant.With HL-5836, Monthly Operating Repts for Aug 1999 for Edwin I Hatch Nuclear Plant.With1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Edwin I Hatch Nuclear Plant.With HL-5818, Monthly Operating Repts for July 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5805, Monthly Operating Repts for June 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5795, Monthly Operating Repts for May 1999 for Ehnp Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Ehnp Units 1 & 2. with HL-5784, Monthly Operating Repts for Apr 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5766, Monthly Operating Repts for Mar 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5755, Monthly Operating Repts for Feb 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5726, Monthly Operating Repts for Dec 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5714, Monthly Operating Repts for Nov 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5706, Monthly Operating Repts for Oct 1998 for Hatch Nuclear Plant Units 1 & 2.With1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Hatch Nuclear Plant Units 1 & 2.With HL-5691, Monthly Operating Repts for Sept 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5675, Monthly Operating Repts for Aug 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5667, Monthly Operating Repts for July 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5653, Monthly Operating Repts for June 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5640, Monthly Operating Repts for May 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5628, Monthly Operating Repts for Apr 1998 for Ei Hatch Nuclear Plant1998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Ei Hatch Nuclear Plant HL-5604, Monthly Operating Repts for Mar 1998 for Edwin I Hatch Nuclear Plant,Units 1 & 21998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Edwin I Hatch Nuclear Plant,Units 1 & 2 HL-5585, Monthly Operating Repts for Feb 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5571, Monthly Operating Repts for Jan 1998 for Edwin I Hatch Nuclear Plant,Unit 11998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Edwin I Hatch Nuclear Plant,Unit 1 HL-5551, Monthly Operating Repts for Dec 1997 for Ei Hatch Nuclear Plant,Units 1 & 21997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5533, Monthly Operating Repts for Nov 1997 for Ei Hatch Nuclear Plant,Units 1 & 21997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5514, Monthly Operating Repts for Oct 1997 for Edwin I Hatch Nuclear Plant,Units 1 & 21997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Edwin I Hatch Nuclear Plant,Units 1 & 2 HL-5493, Monthly Operating Repts for Sept 1997 for Ei Hatch Nuclear Plant1997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Ei Hatch Nuclear Plant HL-5475, Monthly Operating Repts for Aug 1997 for Ei Hatch Nuclear Plant,Units 1 & 21997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5447, Monthly Operating Repts for July 1997 for Edwin I Hatch Nuclear Plant,Units 1 & 21997-07-31031 July 1997 Monthly Operating Repts for July 1997 for Edwin I Hatch Nuclear Plant,Units 1 & 2 HL-5416, Monthly Operating Repts for May 1997 for Ei Hatch Nuclear Plant Units 1 & 21997-05-31031 May 1997 Monthly Operating Repts for May 1997 for Ei Hatch Nuclear Plant Units 1 & 2 HL-5393, Monthly Operating Repts for Apr 1997 for Ei Hatch Nuclear Plant Units 1 & 21997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for Ei Hatch Nuclear Plant Units 1 & 2 HL-5364, Monthly Operating Repts for Mar 1997 for Ei Hatch Npp,Units 1 & 21997-03-31031 March 1997 Monthly Operating Repts for Mar 1997 for Ei Hatch Npp,Units 1 & 2 HL-5332, Monthly Operating Repts for Feb 1997 for Ei Hatch Nuclear Plant1997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for Ei Hatch Nuclear Plant HL-5314, Monthly Operating Repts for Jan 1997 for Ei Hatch Nuclear Plant1997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for Ei Hatch Nuclear Plant HL-5296, Monthly Operating Repts for Dec 1996 for Ei Hatch Nuclear Plant,Units 1 & 21996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5283, Monthly Operating Repts for Nov 1996 for Edwin I Hatch Nuclear Plant,Unit 1 & 21996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for Edwin I Hatch Nuclear Plant,Unit 1 & 2 HL-5265, Monthly Operating Repts for Oct 1996 for Ei Hatch Nuclear Plant Units 1 & 21996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for Ei Hatch Nuclear Plant Units 1 & 2 HL-5249, Monthly Operating Repts for Sept 1996 for Ei Hatch Nuclear Plant Unit 1 & 21996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for Ei Hatch Nuclear Plant Unit 1 & 2 HL-5237, Monthly Operating Repts for Aug 1996 for Ei Hatch Nuclear Plant Units 1 & 21996-08-31031 August 1996 Monthly Operating Repts for Aug 1996 for Ei Hatch Nuclear Plant Units 1 & 2 ML20116J3821996-07-31031 July 1996 Monthly Operating Repts for Jul 1996 for Ei Hatch Nuclear Plant Units 1 & 2 HL-5202, Monthly Operating Repts for June 1996 for Ei Hatch Nuclear Plant Units 1 & 21996-06-30030 June 1996 Monthly Operating Repts for June 1996 for Ei Hatch Nuclear Plant Units 1 & 2 ML20112J0661996-05-31031 May 1996 Monthly Operating Repts for May 1996 for Ehnp ML20116J3971996-05-31031 May 1996 Revised MOR for May 1996 for Ei Hatch Nuclear Plant Unit 1 ML20112J0691996-04-30030 April 1996 Revised MOR for April 1996 for Ei Hatch Nuclear Plant ML20116J3901996-04-30030 April 1996 Revised MOR for April 1996 for Ei Hatch Nuclear Plant Unit 1 ML20111B0061996-04-30030 April 1996 Monthly Operating Repts for April 1996 for Ei Hatch Nuclear Plant HL-5144, Monthly Operating Repts for Mar 1996 for Ei Hatch Nuclear Plant1996-03-31031 March 1996 Monthly Operating Repts for Mar 1996 for Ei Hatch Nuclear Plant ML20111B0131996-03-31031 March 1996 Revised Pages E2-4 for March 1996 for Ei Hatch Nuclear Plant Unit 2 ML20101B1911996-02-29029 February 1996 Monthly Operating Repts for Feb 1996 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5111, Monthly Operating Repts for Jan 1996 for Ei Hatch Nuclear Plant1996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for Ei Hatch Nuclear Plant ML20101B2001996-01-31031 January 1996 Revised Page E1-2 for Monthly Operating Rept for Jan 1996 for Ei Hatch Unit 1 HL-5098, Monthly Operating Repts for Dec 1995 for Ei Hatch Nuclear Plant1995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for Ei Hatch Nuclear Plant HL-5085, Monthly Operating Repts for Nov 1995 for Ei Hatch Nuclear Plant1995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for Ei Hatch Nuclear Plant 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217D3061999-10-13013 October 1999 SER Accepting Licensee Proposed Changes to Edwin I Hatch Nuclear Plant Emergency Classification Scheme to Add Emergency Action Levels Related to Operation of Independent Spent Fuel Storage Installation HL-5845, Monthly Operating Repts for Sept 1999 for Ei Hatch Nuclear Plant.With1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Ei Hatch Nuclear Plant.With ML20217A1691999-09-22022 September 1999 Part 21 Rept Re Engine Sys,Inc Controllers,Manufactured Between Dec 1997 & May 1999,that May Have Questionable Soldering Workmanship.Caused by Inadequate Personnel Training.Sent Rept to All Nuclear Customers ML20212A6641999-09-13013 September 1999 Safety Evaluation Authorizing Relief Request RR-V-16 for Third 10 Yr Interval Inservice Testing Program HL-5836, Monthly Operating Repts for Aug 1999 for Edwin I Hatch Nuclear Plant.With1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Edwin I Hatch Nuclear Plant.With ML20210J9631999-08-0202 August 1999 SER Finding That Licensee Established Acceptable Program to Verify Periodically design-basis Capability of safety-related MOVs at Edwin I Hatch Nuclear Plant,Units 1 & 2 ML20210J9271999-08-0202 August 1999 SER Finds That Licensee Performed Appropriate Evaluations of Operational Configurations of safety-related power-operated Gate Valves to Identify Valves at Plant,Susceptible to Pressure Locking or Thermal Binding HL-5818, Monthly Operating Repts for July 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5805, Monthly Operating Repts for June 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With ML20207E7631999-06-0303 June 1999 Safety Evaluation Concluding That Licensee Proposed Alternative to Use Code Case N-509 Contained in RR-4 Provides Acceptable Level of Quality & Safety.Considers Rev 2 to RR-4 & RR-6 Acceptable HL-5795, Monthly Operating Repts for May 1999 for Ehnp Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Ehnp Units 1 & 2. with ML20206G1691999-05-0404 May 1999 SER Approving Requirements of Istb 4.6.2(b) Pursuant to 10CFR50.55a(a)(3)(ii) HL-5784, Monthly Operating Repts for Apr 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5766, Monthly Operating Repts for Mar 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With ML20207M1891999-03-11011 March 1999 SER Accepting Relief Request for Authorization of Alternative Reactor Pressure Vessel Exam for Circumferential Weld HL-5755, Monthly Operating Repts for Feb 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With ML20206P6981999-01-0707 January 1999 Ehnp Intake Structure Licensing Rept HL-5726, Monthly Operating Repts for Dec 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With ML20196J4931998-12-0707 December 1998 Safety Evaluation Accepting Proposed Alternatives in Relief Requests RR-V-12,RR-V-15,RR-P-15,RR-V-7,RR-V-12,RR-V-14 & RR-V-15 HL-5714, Monthly Operating Repts for Nov 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5706, Monthly Operating Repts for Oct 1998 for Hatch Nuclear Plant Units 1 & 2.With1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Hatch Nuclear Plant Units 1 & 2.With ML20155B6121998-10-28028 October 1998 Safety Evaluation of TR SNCH-9501, BWR Steady State & Transient Analysis Methods Benchmarking Topical Rept. Rept Acceptable HL-5691, Monthly Operating Repts for Sept 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With ML20153G2481998-09-24024 September 1998 SE Concluding That Licensee Implementation Program to Resolve USI A-46 at Plant Adequately Addressed Purpose of 10CFR50.54(f) Request ML20239A2531998-09-0303 September 1998 SER Accepting Licensee Request for Relief Numbers RR-17 & RR-18 for Edwin I Hatch Nuclear Plant,Units 1 & 2.Technical Ltr Rept on Third 10-year Interval ISI Request for Reliefs for Plant,Units 1 & 2 Encl HL-5675, Monthly Operating Repts for Aug 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 ML20238F7131998-08-31031 August 1998 9,change 2 to QAP 1.0, Organization HL-5667, Monthly Operating Repts for July 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5657, Ro:On 980626,noted That Pami Channels Had Been Inoperable for More than Thirty Days.Cause Indeterminate.Licensee Will Replace Automatic Function W/Five Other Qualified Pamis of Like Kind in Drywell & Revised Procedures1998-07-30030 July 1998 Ro:On 980626,noted That Pami Channels Had Been Inoperable for More than Thirty Days.Cause Indeterminate.Licensee Will Replace Automatic Function W/Five Other Qualified Pamis of Like Kind in Drywell & Revised Procedures ML20236W3441998-07-30030 July 1998 Safety Evaluation Accepting Relief Requests for Second 10-yr ISI for Plant,Units 1 & 2 ML20236V5191998-07-28028 July 1998 Safety Evaluation Accepting Proposed License Amend Power Uprate Review ML20236N6751998-07-0909 July 1998 Part 21 & Deficiency Rept Re Notification of Potential Safety Hazard from Breakage of Cast Iron Suction Heads in Apkd Type Pumps.Caused by Migration of Suction Head Journal Sleeve Along Lower End of Pump Shaft.Will Inspect Pumps ML20236L1821998-07-0707 July 1998 Safety Evaluation Accepting 980428 Proposed Alternative to ASME Boiler & Pressure Vessel Code,Section Xi,Repair & Replacement Requirements Under 10CFR50.55a(a)(3) HL-5653, Monthly Operating Repts for June 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5640, Monthly Operating Repts for May 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 ML20248B8651998-05-15015 May 1998 Quadrennial Simulator Certification Rept HL-5628, Monthly Operating Repts for Apr 1998 for Ei Hatch Nuclear Plant1998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Ei Hatch Nuclear Plant HL-5604, Monthly Operating Repts for Mar 1998 for Edwin I Hatch Nuclear Plant,Units 1 & 21998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Edwin I Hatch Nuclear Plant,Units 1 & 2 ML20216B2711998-02-28028 February 1998 Extended Power Uprate Safety Analysis Rept for Ei Hatch Plant,Units 1 & 2 HL-5585, Monthly Operating Repts for Feb 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5571, Monthly Operating Repts for Jan 1998 for Edwin I Hatch Nuclear Plant,Unit 11998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Edwin I Hatch Nuclear Plant,Unit 1 HL-5551, Monthly Operating Repts for Dec 1997 for Ei Hatch Nuclear Plant,Units 1 & 21997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Ei Hatch Nuclear Plant,Units 1 & 2 ML20199B0561997-12-31031 December 1997 Rev 0 GE-NE-B13-01869-122, Jet Pump Riser Weld Flaw Evaluation Handbook for Hatch Unit 1 HL-5581, Annual Operating Rept for 1997, for Ei Hatch Nuclear Plant Units 1 & 21997-12-31031 December 1997 Annual Operating Rept for 1997, for Ei Hatch Nuclear Plant Units 1 & 2 HL-5533, Monthly Operating Repts for Nov 1997 for Ei Hatch Nuclear Plant,Units 1 & 21997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5514, Monthly Operating Repts for Oct 1997 for Edwin I Hatch Nuclear Plant,Units 1 & 21997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Edwin I Hatch Nuclear Plant,Units 1 & 2 ML20212A1981997-10-16016 October 1997 Safety Evaluation Denying Licensee Request for Relief from Implementation of 10CFR50.55a Requirements Re Use of 1992 Edition of ASME Code Section XI for ISI of Containments ML20211M6491997-10-0808 October 1997 Addenda 1 to Part 21 Rept Re Weldments on Opposed Piston & Coltec-Pielstick Emergency stand-by Diesel gen-set lube-oil & Jacket Water Piping Sys.Revised List of Potentially Affected Utils to Include Asterisked Utils,Submitted ML20211H5311997-10-0101 October 1997 Rev 2 to Unit 1,Cycle 17 Colr ML20211H5251997-10-0101 October 1997 Rev 3 to Unit 1,Cycle 17 Colr 1999-09-30
[Table view] |
Text
.
OPERATLNG DATA REPORT DOCKET NO. 50-321 DATE 10-1-79 C051PLETED BY G. 1. Johnson TELEPHONE Q17-367-7781 OPERATING STATUS Hatch - 1 Notes
- 1. Unit Name:
- 2. Reporting Period: Seotember 1979 ,
- 3. Licensed Thermal Power (A!Wt): 2436 MWt
- 4. Nameplate Rating (Gross 51We): 809.3 Gross MWe
- 5. Design Electrical Rating (Net SIWE): 786.3 Net MJe
- 6. 31aximum Dependabic Capacity (Gross SlWe): 797.3 Gross fMe
- 7. Niaximum Dependable Capacity (Net 31We): 864.3 Net Kle
- 8. If Changes Occur in Capacity Ratings (Ite'ms Number 3 Through 7) Since Last Report. Give Reasons:
- 9. Power Level To Which Restricted,If Any (Net StWe):
- 10. Reasons For Restrictions.!f Any:
This 51onth Yr.-to.Date Cumulative
- 11. Hours In Reporting Period 720 6551 32855
- 12. Number Of Hours Reactor Was Critical 692.5 3313.5 24001.9
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 0.0
'14. Hours Generator On.Line 614.6 3083'.3 22567.8
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 16. Gross Thermal Energy Generated (StWH) 1250835 6784835 46393092
- 17. Gross Electrical Energy Generated (31WH) 397d10___. 2206070 14961580 IS. Net Electrical Energy Generated (51WH) 379002 2086319 14210377
- 19. Unit Service Factor 85.4 47.1 68.7
- 20. Unit Availability Factor 85.4 47.1 68.7
- 21. Unit Capacity Factor (Using 31DC Net) 68.7 41.7 56.6
- 22. Unit Capacity Factor (Using DER Net) 66.8 40.5 55.0
- 23. Unit Forced Outage Rate 13.3 10.1 15.7
- 24. Shutdowns Scheduled Over Next 6 5fonths (Type. Date.and Duration of Each):
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup-
- 26. Units in Test Status IPrior to Commercial Operation): Forecast Achiewd INITIA L CRITICA LITY INITIAL ELECTRICITY CON 1.\lERCIA L OPER A TION 1150 79102202 74. i % 3, "4 e
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-3E1 UNIT Hatch 1 DATE 10-1-79 COMPLETED BY C. L. Johnson TELEPHONE _9l2-367-7781 MONTH Sentomber 1979 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe. Net) (MWe. Net) 1 402 .
37 491 2 554 18 257 3 644 39 -18 4 671 20 346 5 404 ,i 676 6 610 22 704 7 715 23 671 8 300 24 752 9 -11 25 760 10 19 760 26 II 435 27 754
- 615 28 750 13 653 761 29 i4 699 757 30 15 498 3, 16 106 INSTRUCTIONS On this format.!i;r the aserage Jaily unit power lesel m MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
(9 /77 ) .
1150 063
. . , _ _ - - - +- - __ m - - * - -
. .7w<
4 -
DOCKET NO. 50-321 UNITS!!UTDOWNS AND POWER REDUCTIONS UNIT NAME Ilatch 1 DATE 10 10-79 COMPLETED BY fi. L. Johnson _
REPORT MONTil September TELErl!ONE 912-367-7781 e.
~
. I
- , .!E 3g Yk Licensee ,E g hvl, Cause & Corrective
,. No. Date g. 3 Ej ,g g 5 Event :: ? 'E3 0 Action to
$E 5 j5 Report # 8)' 0 Prevent Recurrence Q
l '
79-13 79-09-08 S 50:41 A 1 CF PUMPXX Off line due to inop RHRSW pumps I
79-14 79-09-15 F 19:29 A 3 IA VALV0P Rx Scram TCVFC I
79-15 79-09-18 S 35:15 A 1 XX TRANSF Shutd'own to repair Alterrex System WJ t @
n.;p, i
0 m
c :a t= D
- c3i:2 a1 2 3 4 Method: Exhibii G Instructions m F: Forced S: Scheduled Iteason: ,
A.Fquipment Failure (Explain) 1 Manual for Preparation of Data l O 2 Manual Scram. Entry Sheets for Licensee l IJ mintenance of Test i C-Refuehng 3-Automatic Scram. Eveni Iteport (LE R) File (NUREC-
"' " # E" ""' Y #5" ' "" ' #' *E*"' '
CN E Operator Training & License Examination
- F- A dminist ra tive . 5 G Operational Error (Explain) Exhibit I Same Souree W/77) Il Other (Explain) 1
NARRATIVE REPORT UNIT I Sep5 ember 8th Shutdown to repair inop RHRSW pumps Sept >mber 10th Generator tied to line 17:05 CST September 15th Rx Scram TCVFC due to Alterrex Proble7s September 16th Generator on line at 14:20 CST September 18th Shutdown to repair Alterrex System September 20th Generator on line at 04:06 CST 1150 065
HATCH 1 SAFETY - RELATED MAINTEJANCE REQUESTS TO BE REPORTED FOR SEPTEMBh9 1979 NUMBER DATE COMPLETED DESCRIPTION 78-4277 9-10-79 Installed seal between RWCU pump and motor 79-4699 9-6-79 Replaced all bushings and gaskets on RHR Service Water Pump "B" 79-4865 9-6-79 Replaced all bushings and gaskets on RHR Service Water Pump "1C" 79-5012 9-2-79 Investigated and repaired steam flow; feedwater flow recorder 79-4934 9-2-79 Repaired IRM "C" 79-2157 8-7-70 Installed conduit and pulled cable in RPS MG set "1A" per DCR 78 419 79-2158 8-7-79 Ins t alle d conduit and pulled cables in RPS Alternate Supply Class IE Breaker Panels per DCR 48-410 79-4046 8-24-79 Installed conduit and pulled cables in RPS Alternate Supoly Class IE Breaker Panels per DCR 48 419 79 4067 8-24-79 Completed conduit installation and terminated cables for RPS Alternate Supply Class IE Breaker Panels per DCR 78-410 79-4617 8-13-79 Removed two under frequency relays from panel in warehouse and installed and calibrated in RPS MG Set Breaker Panels 79-4782 9-6-79 Installed new impellors and bushing in RHR Service Water Pump 79 4764 8-31-79 Repaired Core Spray Jockey Pump 79 4933 9-6-70 Repaired HPCI
. Vacuum 1150 P3m86
-- - ~ - - ._
__ -. .2-
9 79 4929 8-11-70 Uncoupled the RCIC Turbine from pump for overspeed test, then coupled the RCIC Turbine back to pump 79-5021 9-2-77 Rod can not be selected on the Control Rod matrix per HNP-1-4402 for Control Rod Scram Time Testing.
Investigated and repaired 79-5018 8-31-79 Reolaced Unit 1 airlock door with a 3-hour rated door 79-4703 9-5-79 Repaired 4 hangers on East Wall of '58 elev. Rx building per DCR 1-7 187 79-727 8-13-79 Rerouted offgas drain lines
. per DCR 78-186 79-1302 8-15-79 Re ola ce d offgas Drain Valves per DCR 78-248 79 4341 8-27-79 Wired new solenoids to offgas Drain valves to existing circuits per DCR 78-248 79-3992 9-25-79 Replaced defective Reactor Vessel Thermocouoles 79-5448 9-16-79 Replaced limit switch and junction box cover on "C" outboard MSIV 79-5341 9-10-79 Checked low stops on Recirc. i4G Se t Scoop Tube 79-5374 9-21-79 Performed conthlv electrical 'M per procedure HNP-1-6220 79 4584 9-22-79 Investigated and repaired Contro. Rod Drive 46 43 79 4585 9-22-79. Investigated and repaired Control Rod Drive 30 10 79 4586 4-22-79 Investigated and repaired Control Rod Drive 22 10 79 4587 9-22-79 Investigated and repaired Control Rod Drive 38 41 1150 367
79-4588 9-28-79 Repaired control rod drive accumulator solenoid valve 79-5344 9-16-79 Rod Sequence Control; page test does not work at 50%
rod density. Investigated and repaired 79-5097 9-19-79 Investigated why process computer receives no signal for LPRMs 79 5171 9-9-79 "1B" RBM is not working properly; investigated and repaired 79-5293 9-17-79 Repaired recire flow units B and D 79-3683 9-28-79 Repaired RHR S/W strainer outlet valve 79-c813 9-17-79 Checked calibration fo r RHR S/W "B" Loop flow transmitter 79-4814 9-17-79 Checked calibration on RHR S/' " A" Loop flow transmitter 79-5304 9-11-79 R.placed RHR S/W Discharge Pressure Guage on "B" Pump 70-5419 9-17-79 Repaired RHR Hx Bypass Valve " A" Loop indicator light 79 4901 9-9-79 Replaced oil in HPCI turbine 79-5024 9-6 79 Repaired HPCI Aux. oil pump 79-5054 9-9-79 Repaired HPCl turbine oil pump 79-1608 9-18-79 Repaired oil leak from gear reducer on trolley drive on refueling platform 79-3404 9-22-79 Replaced the main hoist joy lever on the refueling platform 79-5514 9-21-79 Repaired R/W flow to canal recorder m rn
79-537? 9-13-79 Repaired " Cooling Malfunction Bay C" alarm in the EHC cabinets 79-4294 9-19-79 Checked the validity of the calibration of instrumentation on attached list (SRM recorder, MSL leak detector, Topaz inverter) 79-4913 9-10-79 Adjusted main steam line hanger 79-5320 9-20-79 Eepaired snubber MSH oil leak 79-4996 9-17-79 RFPT 1A; repaired oil leaks on hydraulic control system 79 4874 9-14-79 Re pla ce d 3 cells in R42-S009 DCR 7o-216 79-5569 9-20-79 Performed battery chargers inspection 79-5244 Q-11-79 Repaired N2 makeup flow recorder 79-4499 9 79 Repaired motor M2, M3 Louvers in Gen. (D/G1 room
/
e 1150 069
Georgia Power Company Post Office Box 442 Baxley, Georgia 31513 Telegnone 912 067-7781 912 537-9444 m
Edwin I. Hatch Nuclear Plant Georgia Power me southern eiectrc system October 10, 1079 PM 79-893 PLANT E. I. HATCH NRC Monthly Report Docket No. 50-366 Director Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D.C. 20555
Dear Sirs:
Pursuant to Section 6.9.1.6 of the Hatch Unit 2 Technical Specifications, please find attached the NRC Monthly Operating Report.
- ' ll 7, M Manry 'J Plant Manager MM/peb xc: C. T. Moore T. V. Greene File 1150 070
OPERATING DATA REPORT DOCKET NO. 50-366 DATE 10-1-79 CONIFLETED BY G. L. Johnson TELEPHONE 912- J6 /- / 781 OPERATING STATUS _
Hatch 2 Notes
- 1. Unit Name:
- 2. Reporting Period: September 1979
- 3. Licensed Thermal Power (>lWt): 2436 MWt
- 4. Nameplate Rating (Gross 5tWe): 900 3 Gross WAe
- 5. Design Electrical Rating (Net 51We): 786.3 Net MWe
- 6. Sf aximum Dependable Capacity (Gross 5tWe): 797.3 Gross MWe
- 7. 5f aximum Dependable Capacity (Net 31We): 764.3 Net MWe
- 8. If Changes Occur in Capacity Ratings (Items Ni.mber 3 Through 7) Since Last Report. Give Reasons:
. 9. Power Level To Which Restricted. If Any (Net 51We):
- 10. Reasons For Restrictions,If Any:
This hfonth Yr..to.Date Cumulative II. Hours in Reporting Period 720 674 624
- 12. Number Of Hours Reactor Was Critical 641.8 554.3 554.3
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 0.0
- 14. Hours Generator On.Line 515.9 435.3 435.3
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 16. Gross Thermal Energy Generated (5tWH) 1054355 892611 892611
- 17. Gross Electrical Energy Generated (51WH) - 340620 _,
292500 292500
- 18. Net Electrical Energy Generated (51WH) 323398 277366 277366
- 19. Unit Service Factor 71.6 69.8 69.8
- 20. Unit Availability Factor 71.6 69.8 69.8
- 21. Unit Capacity Factor (Using SIDC Net) 58.8 58.2 58.2
- 22. Unit Capacity Factor (Using DER Net) 57.1 56.5 56.5
- 23. Unit Forced Outage Rate 24.0 25.3 25.3
- 24. Shutdowns Scheduled Over Next 6 Sionths (Type. Date, and Duration of Each):
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units in Test Status (Prior to Commercial Operation): Forecast Achieved INITI.\ L CRITICA LITY INITIAL ELECTRICITY CO.\l>1ERCIA L OPER ATION 1150 071 mn
AVERAGE DAILY UNIT POWER LEV";.
DOCKET NO. 50-366 UNIT Hatch 2 DATE 10-1-79 COMPLETED BY G. L. Johnson TELEPHONE 912-367-7781 MONDI Sectember 1979 DAY AVFRAGE DAILY POWER LEVFL DAY AVERAGE DAILY POWER LEVEL (MWe Net) 8 MWe-Neti
! 602 -
i7 54 2 658 -
is 419 3 340 39 720 4 31R 20 . 756 5 707 21 671 6 742 22 186 7 680 23 507 8 -2 _
24 764 9 -17 25 764 to -18 26 772 II -13 27 770 12 124 23 739 13 627 29 10 i4 745 3o 368 15 495 yi
~
16 -17 INSTRUCTIONS On this format, hst the average daily unit power lesel in MWe Net for each day in the reporting inonth. Coinpt.te to the nearest whole megawatt.
(9/77) 1150 172
- -e,. . _- -- _-_ L
s -
DOCKErNo. 50-366 UNITS!!UTDOWNS AND POWER REDUCTIONS UNIT NA5tE Hatch 2 DATE 10-10-79
'. COMPLETED !!Y G. L. Johnson REPORT MONTII Sentomber TELErilONE 912-367-7781 e.
jg 3 Y Licensee h , Cause & Corrective No. Date g 3g s _a s 5 Event yy gO 3 . Action to H jE $ 5 e ;5 g Report # mV o v
Psevent Recurrence O
79-21 79-09-03 F 15:23 8 3 N/A 1A INSTRU Rx' Scram Turbine Trip on Low Vacuum 79-22 79-09-08 S 106:45 B 1 NA HJ XXXXXX Shutdown to repair MSR Steam-Leaks 79-23 79-09-15 S 7:32 B N/A N/A ZZ ZZZZZZ Turbi'ne Testing
' I 79-24 79-09-15 F 40:43 B 3 NA 1A VALV0P R.x Scram TCV Fast Closure I
79-25 73-09-22 S 13:00 b 1 NA XX TRANSF Shutdown to repair Alterrex System.
Shutdown to repair EHC 011 Leak M
73-26 79-09-29 S 27:52 B 1- NA XX XXXXXX gg C3 We)
(M
>e)
~
LJ1 - l 2 3 4 CD F. Forced Reason: , Method: Exhibit G. Instructions S: Scheduled A Equipment Failure (Explain) 1 Manual 2 Manual Scram.
for Preparation of Data Entsy Sheets for Licensee i'
rd a D.M.:inienance oi Test 3 Automatic Scram.
y C Refueling Event Report (LER) File (NUREG- g D Itegulatory Restriction 4-Ot her (Explain) 0161) u I! Operato Training & License Examination U
' F Adrnimstrative . 5 G-Operational Esrur (Explain) Exhibit i . Same Source (9/77) Il Other (Explain)
NARRATIVE REPORT UNIT 2 September 3rd Rx Scram Turbine Trip on Low Vacuum September 4th Generator tied to line 0400 CST September 8th Shutdown to repair MSR Steam Leaks September 12th Generator tied to line 1315 CST September 15th Reduction due to Turbine Testing September 15th Rx Scram TCV Fast Closure September 17th Generator tied to line 1139 CST September 22nd Shutdo*wn to repair Alterrex System September 22nd Generator tied to line 2350 CST September 24th Shutdown to repair EHC oil leak September 30th Gen?rator tied to line 0714 CST 1150 074
HATCH 2 SAFETY-RELATED MAINTENANCE REQUESTS TO BE REPORTED FOR SEPTEMBER 1979 NUMBER DATE COMPLETED DESCRIPTION 78 4486 9-12-79 LPCI meter; repaired frequency meter 79-1506 8-29-70 Installed pressure transduces in the Main Steam piping in Drywell 79 4211 9-5-79 Repaired Rod Block Monitor 79-4122 8-10-79 Recalibrated HPCI Turbine Temp. Reoceder 79-2815 8-28-79 Repaired disc in check valve 79-3825 8-24-74 Reoaired seals in Rx HO 2
Clean-up Pump 2B 79-3509 9-19-79 Re pla ce d diaphragms in SRVDL pressure switches 79-3563 9-21-79 Repaired inboard MSIV "B" 79-3898 Q-21-79 Negative ground on "B" SS battery recorded; investigated and repaired as needed 79-4347 9-21-79 Repaired indication light for inboard MSIV 79 4500 9-18-79 Repaired indication light for Primary Containment Isolation Check Valve 79-4509 9-21-79 Repaired bad pressure seal in main steam line drain valve 79 4252 9-21-79 Repaired reac to r water sample inboard isolation valve 79 4379 9-21-79 Repaired reactor water sample inboard isolation valve 79 4388 9-21-79 Repaired IRM"F" 79 4501 9-21-79 Repaired IRM"F" 1150 075
79-4508 9-21-79 repaired IRM"E" 79-4154 9-7-79 repaired RHR SW pump 2D discharge pressure guage 79-4539 9-21-79 Calibrated jockey pump suction pressura guage 79-4540 9-21-79 Recalibrated jockey pump -
suction pressure guage 79-4153 9-18-79 Repaired HPCI steam line low pressure instrument isolation valve 79 4385 9-13-79 Removed agastat time delav relays which were installed per DCR 79-312 and replaced with instantaneous pickup relays 79-3490 9-11-79 Repaired RCIC isolation valve 79-2644 9-18-79 Installed stainless steel cotter pin per DCR 70-170 on refueling platform 79-4090 9-19-79 Disconnec te d temporary wires from Yarway column the rmoc ou ple s an d placed them in the junction box 79-3351 9-14-79 Repaired chemical waste sample pump B 79-3913 9-19-79 Revised mode switches and program logic in Radwaste Panel per DCR 79-314 79-3930 9-13-79 Repaired CBWRT to CPS A valve 79-4084 9-20-79 Made wiring changes to F384A control logic per DCR 79-341 79 4085 9-20-70 Made wiring changes to F538 control logic cer DCR 70-115 79 4459 9-26-79 Repaired 2A diesel jacket coolant heater 79-3154 9-21-79 Repaired reaction chamber temperature control on post-LOCA H2 recombiner 1150 076
.. . . . .. . . .