Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000325/LER-1979-069, Forwards LER 79-069/03L-0 + (11:27:01, 4 January 2025)
- 05000346/LER-1979-095-03, /03L-0:on 790925,auxiliary Feed Pump Turbine Steam Inlet Valve MS106 on Sys 1 Lost Its Indication.Caused by Loose Lamp Retainer Ring Which Grounded & Blew Control Power Fuse.Ring Was Tightened & Fuse Replaced + (11:27:04, 4 January 2025)
- 05000219/LER-1979-035, Forwards LER 79-035/03L-0 + (11:27:09, 4 January 2025)
- 05000346/LER-1979-095, Forwards LER 79-095/03L-0 + (11:27:11, 4 January 2025)
- ML19254E240 + (11:27:13, 4 January 2025)
- ML19254E239 + (11:27:14, 4 January 2025)
- ML19254E237 + (11:27:15, 4 January 2025)
- ML19254E236 + (11:27:16, 4 January 2025)
- ML19254E234 + (11:27:17, 4 January 2025)
- ML19254E233 + (11:27:18, 4 January 2025)
- ML19254E230 + (11:27:19, 4 January 2025)
- ML19254E231 + (11:27:19, 4 January 2025)
- NUREG-0001, Responds to Re Licensing & Insp of Nuclear Facilities post-TMI.NRC Initiated Specific Actions to Assure Similar Incident Will Not Occur.Forwards NUREG-0625, NUREG-0001-ES & NUREG-0578.Cover Sheets Only Encl + (11:27:22, 4 January 2025)
- ML19254E226 + (11:27:24, 4 January 2025)
- ML19254E225 + (11:27:25, 4 January 2025)
- ML19254E224 + (11:27:26, 4 January 2025)
- ML19254E223 + (11:27:28, 4 January 2025)
- 05000267/LER-1979-041-03, /03L-0:on 791005,malfunctions in Circulator 1A Speed Measurement Caused Loss of High Speed Signals.Caused by Circuit Imbalance Due to Signal Cable Resistance Change. Modifiers Adjusted & Channel Function Restored + (11:27:30, 4 January 2025)
- ML19254E220 + (11:27:33, 4 January 2025)
- ML19254E219 + (11:27:52, 4 January 2025)
- ML19254E217 + (11:28:10, 4 January 2025)
- ML19254E216 + (11:28:11, 4 January 2025)
- ML19254E215 + (11:28:23, 4 January 2025)
- ML19254E213 + (11:28:24, 4 January 2025)
- ML19254E212 + (11:28:27, 4 January 2025)
- ML19254E210 + (11:28:35, 4 January 2025)
- ML19254E208 + (11:28:37, 4 January 2025)
- ML19254E207 + (11:28:38, 4 January 2025)
- ML19254E206 + (11:28:39, 4 January 2025)
- 05000267/LER-1979-041, Fowards LER 79-041/03L-0 + (11:28:42, 4 January 2025)
- ML19254E203 + (11:28:47, 4 January 2025)
- ML19254E202 + (11:28:48, 4 January 2025)
- ML19254E200 + (11:28:50, 4 January 2025)
- ML19254E199 + (11:28:52, 4 January 2025)
- ML19254E198 + (11:28:53, 4 January 2025)
- ML19254E196 + (11:28:55, 4 January 2025)
- 05000346/LER-1979-096-01, /01T-0:on 791015,capacitor Failed in Integrated Control Sys Resulting in Unit Trip from 68.8% of Full Power. Caused by Blown Muffler on Generator Output 345 Kv Breakers. Damaged Mufflers Replaced & Offsite Power re-establish + (11:28:59, 4 January 2025)
- ML19254E194 + (11:29:02, 4 January 2025)
- 05000346/LER-1979-096, Forwards LER 79-096/01T-0 + (11:29:05, 4 January 2025)
- ML19254E190 + (11:29:09, 4 January 2025)
- ML19254E191 + (11:29:09, 4 January 2025)
- ML19254E189 + (11:29:11, 4 January 2025)
- ML19254E188 + (11:29:13, 4 January 2025)
- ML19254E187 + (11:29:15, 4 January 2025)
- ML19254E186 + (11:29:21, 4 January 2025)
- ML19254E185 + (11:29:23, 4 January 2025)
- ML19254E184 + (11:29:26, 4 January 2025)
- ML19254E183 + (11:29:29, 4 January 2025)
- ML19254E182 + (11:29:32, 4 January 2025)
- ML19254E181 + (11:29:34, 4 January 2025)
- ML19254E180 + (11:29:36, 4 January 2025)