Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20214L029 + (06:40:17, 4 December 2024)
- ML20214L024 + (06:40:18, 4 December 2024)
- NRC-87-0053, Confirms Util Agreement Made at 870429 Meeting W/Nrc to Tighten Pipe Clamp Bolts for Clamps on Main Steam & Bypass Piping.Activity Completed on 870515.Nut & Bolt Torque Verified + (06:40:18, 4 December 2024)
- ML20214L021 + (06:40:19, 4 December 2024)
- ML20214L019 + (06:40:20, 4 December 2024)
- ML20214L016 + (06:40:21, 4 December 2024)
- ML20214L014 + (06:40:21, 4 December 2024)
- 05000458/LER-1986-060, Forwards Info Re Items Identified Subsequent to 861110 Conference Re Insp Rept 50-458/86-36.Addl Info Available in LER 86-60,submitted on 861113 + (06:40:22, 4 December 2024)
- ML20214L005 + (06:40:23, 4 December 2024)
- ML20214L010 + (06:40:23, 4 December 2024)
- ML20214L001 + (06:40:24, 4 December 2024)
- IR 05000302/1986034 + (06:40:25, 4 December 2024)
- ML20214K997 + (06:40:25, 4 December 2024)
- ML20214K994 + (06:40:26, 4 December 2024)
- ML20214K992 + (06:40:27, 4 December 2024)
- 2CAN118608, Forwards Response to Requests for Info in Generic Ltr 86-06 Re plant-specific Concerns Not Covered in Previous Submittals.Parameters Used to Determine Need for Reactor Coolant Trip Include Subcooling Margin & RCS Pressure + (06:40:28, 4 December 2024)
- ML20214K985 + (06:40:29, 4 December 2024)
- ML20214K986 + (06:40:29, 4 December 2024)
- L-86-472, Forwards Florida Power & Light Co,Turkey Point Plant Unit 4,Cycle XI Startup Rept, Per Tech Spec 6.9.1.a.Rept Documents First Time Use of Hafnium Vessel Flux Depression Assemblies & Effects on Core Physics + (06:40:30, 4 December 2024)
- ML20214K982 + (06:40:30, 4 December 2024)
- ML20214K979 + (06:40:31, 4 December 2024)
- JPN-87-028, Responds to NRC Re Violations Noted in Insp Rept 50-333/87-07.Corrective Actions:Prejob Briefing & Preshift Briefing Added to Radiological Sensitive Procedures & Procedures Revised to Delineate Responsibilities + (06:40:32, 4 December 2024)
- ML20214K975 + (06:40:32, 4 December 2024)
- ML20214K972 + (06:40:34, 4 December 2024)
- ML20214K971 + (06:40:35, 4 December 2024)
- ML20214K965 + (06:40:38, 4 December 2024)
- ML20214K961 + (06:40:39, 4 December 2024)
- ML20214K963 + (06:40:39, 4 December 2024)
- ML20214K955 + (06:40:40, 4 December 2024)
- ML20214K953 + (06:40:41, 4 December 2024)
- ML20214K954 + (06:40:41, 4 December 2024)
- ML20214K951 + (06:40:42, 4 December 2024)
- ML20214K949 + (06:40:43, 4 December 2024)
- ML20214K946 + (06:40:44, 4 December 2024)
- ML20214K944 + (06:40:45, 4 December 2024)
- NRC-87-0043, Forwards Proposed License Condition 2.C(10), Emergency Diesel Generator Lube Oil Surveillance Program, Per NRC 870407 SER & Util 870128 Application for Amend to License NPF-43 + (06:40:49, 4 December 2024)
- ML20214K943 + (06:40:49, 4 December 2024)
- ML20214K939 + (06:40:50, 4 December 2024)
- U-600937, Informs That Final Analysis of Equipment Re Survivability in Event of Hydrogen Generation & Combustion Following Degraded Core Accident Will Not Be Submitted Until 871030.Problems W/ Testing Program Due to Mechanical Problems Caused Delay + (06:40:51, 4 December 2024)
- U-600947, Notification of Unusual Event:On 870524,motor-driven Feed Pump Regulating Valve 1FW-F004 Malfunctioned,Increasing Reactor Water Level.Cause Under Investigation.Valve Shifted to Manual Control W/No Response.Event Terminated Same Day + (06:40:52, 4 December 2024)
- ML20214K933 + (06:40:52, 4 December 2024)
- PY-CEI-NRR-0650, Responds to Violations Noted in Insp Rept 50-440/87-04 on 870304-0413.Corrective Actions:Diesel Generator Control Air Solenoid Valves in Svc for Over 6 Months Replaced & Failed Valves Returned to Vendor + (06:40:53, 4 December 2024)
- NRC-87-0074, Forwards Addl Info Re Facility Conformance W/Provisions of TMI Action Plan Item II.K.3.28, Verify Qualification of Accumulators on Automatic Depressurization Sys Valves, Per NRC 861205 Request + (06:40:53, 4 December 2024)
- ML20214K926 + (06:40:54, 4 December 2024)
- 3F1186-15, Forwards Response to Violations Noted in Insp Rept 50-302/86-27.Corrective Actions:Independent two-party Verification Performed for Procedure SP-341.Procedure CP-115, In-Plant Switching & Tagging, Will Be Revised + (06:40:55, 4 December 2024)
- ML20214K925 + (06:40:55, 4 December 2024)
- ML20214K918 + (06:40:56, 4 December 2024)
- ML20214K920 + (06:40:56, 4 December 2024)
- ML20214K915 + (06:40:57, 4 December 2024)
- IR 05000331/1986017 + (06:41:01, 4 December 2024)
- IR 05000354/1986049 + (06:41:03, 4 December 2024)
- IR 05000348/1986023 + (06:41:04, 4 December 2024)