Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20214L340 + (06:38:03, 4 December 2024)
- ML20214L338 + (06:38:04, 4 December 2024)
- 05000272/LER-1986-018-01, :on 860806,Limitorque Motor Valve Operators W/O Environ Qualified Wires Discovered.Caused by Insufficient Control of Wiring During Operator Assembly. Wiring Replaced.Stored Wires Will Be Inspected + (06:38:05, 4 December 2024)
- ML20214L336 + (06:38:06, 4 December 2024)
- ML20214L331 + (06:38:07, 4 December 2024)
- ML20214L326 + (06:38:07, 4 December 2024)
- RBG-24271, Special Rept:On 860729,temps in North End of Main Steam Tunnel Rose Above Tech Spec Limit.Caused by Inadequate Air Circulation & Location of Thermocouples.Permanent Installation of Addl Air Supply Duct Work Planned + (06:38:08, 4 December 2024)
- ML20214L321 + (06:38:09, 4 December 2024)
- ML20214L322 + (06:38:09, 4 December 2024)
- ML20214L319 + (06:38:11, 4 December 2024)
- ML20214L317 + (06:38:11, 4 December 2024)
- ML20214L314 + (06:38:12, 4 December 2024)
- 05000341/LER-1986-024, :on 860806,during Startup,Spurious Actuation of Control Ctr Ventilation Sys Initiated.Caused by Interference from Handheld Radio frequency.Nonradio-based Communication Sys to Be Installed + (06:38:13, 4 December 2024)
- ML20214L309 + (06:38:14, 4 December 2024)
- ML20214L304 + (06:38:15, 4 December 2024)
- ML20214L307 + (06:38:15, 4 December 2024)
- ML20214L301 + (06:38:16, 4 December 2024)
- ML20214L299 + (06:38:17, 4 December 2024)
- ML20214L293 + (06:38:18, 4 December 2024)
- 05000529/LER-1986-021-01, :on 860806,discovered That Train B LPSI Pump Header Discharge Throttle Valve Not Adjusted to Proper Setting.Caused by Personnel Error on 860717 Due to Unclear Procedure.Separate Procedures in Effect + (06:38:21, 4 December 2024)
- ML20214L287 + (06:38:22, 4 December 2024)
- ML20214L286 + (06:38:22, 4 December 2024)
- ML20214L283 + (06:38:23, 4 December 2024)
- ML20214L281 + (06:38:24, 4 December 2024)
- ML20214L279 + (06:38:24, 4 December 2024)
- ML20214L278 + (06:38:25, 4 December 2024)
- 05000348/LER-1986-015, :on 860805,reactor Trip & Subsequent Main Steam Line Isolation Occurred.Caused by Reduction in Feedwater Flow to Steam Generator 1C Due to Failed Printed Circuit Card.Card Replaced + (06:38:27, 4 December 2024)
- ML20214L274 + (06:38:27, 4 December 2024)
- ML20214L273 + (06:38:28, 4 December 2024)
- 05000413/LER-1986-041, :on 860801,reactor Bldg Fire Detection Zones Surveillance Test Not Performed for More than 24 H from 860615-19.Cause Under Investigation.Final Rept Expected by 860926 + (06:38:30, 4 December 2024)
- ML20214L270 + (06:38:30, 4 December 2024)
- ML20214L268 + (06:38:31, 4 December 2024)
- 05000373/LER-1986-034, :on 860807,automatic Start of Diesel Generator 1B Occurred.Caused by Spurious Actuation of Protection Logic Relay.Relay Replaced + (06:38:34, 4 December 2024)
- 05000461/LER-1987-024, :on 870501,RWCU Sys Automatically Isolated Two Times Due to High Differential Flow Signal.Caused by Flow Perturbations Compounded by Error in Circuitry & Personnel Error.Sys Stabilized & Returned to Svc + (06:38:36, 4 December 2024)
- ML20214L261 + (06:38:37, 4 December 2024)
- ML20214L258 + (06:38:37, 4 December 2024)
- ML20214L256 + (06:38:38, 4 December 2024)
- ML20214L254 + (06:38:39, 4 December 2024)
- ML20214L253 + (06:38:39, 4 December 2024)
- ML20214L251 + (06:38:40, 4 December 2024)
- ML20214L248 + (06:38:40, 4 December 2024)
- SNRC-1338, Forwards Checklist for Plant-Specific Review of Alternate Rod Injection Sys (Ari), to Document Plant Compliance W/ 10CFR50.62(c)(3).To Eliminate Potential Delay in ARI Operation,Power for Trip Logic Changed + (06:38:41, 4 December 2024)
- ML20214L245 + (06:38:42, 4 December 2024)
- ML20214L243 + (06:38:42, 4 December 2024)
- PY-CEI-NRR-0560, Requests 2-wk Extension for Submittal of Security Plan Amends Required by 10CFR73.55.Addl Time Needed to Complete Engineering Evaluations + (06:38:44, 4 December 2024)
- ML20214L242 + (06:38:44, 4 December 2024)
- ML20214L237 + (06:38:45, 4 December 2024)
- ML20214L236 + (06:38:46, 4 December 2024)
- ML20214L232 + (06:38:47, 4 December 2024)
- B12222, Application for Amend to License NPF-49,changing Tech Spec Section 6.5.3.2 Re Quorum Required to Conduct Meeting of Unit 3 Nuclear Review Board to Make Quorum Consistent W/ Units 1 & 2.Fee Paid + (06:38:48, 4 December 2024)
- ML20214L225 + (06:38:49, 4 December 2024)