Georgia Power Company 8

333 Piedmont Avenue Atlanta. Georgia 30308 Telephone 404 526 6526 Maihng Address:

Post Office Box 4545 Attanta. Georgia 30302 g g;g n9: 35 Georgialbwer uaIag"eSeiear savery

"#"'j']'g*'"

and Licensing November 13, 1986 U.S. Nuclear Regulatory Commission Attention: Dr. J. Nelson Grace Division of Reactor Projects 101 Marietta Street, N.W.

Atlanta, Georgia 30323 NRC DOCKETS 50-321, 50-366 OPERATING LICENSES DPR-57, NPF-5 EDWIN I. HATCH NUCLEAR PLANT UNITS 1 AND 2 INSPECTION OF COMPLIANCE WITH 10 CFR 50, APPENDIX R, SECTIONS III.G, III.J, III.L, and III.0, AND ASSOCIATED FIRE PROTECTION FEATURES Gentlemen:

This letter responds to the NRC's September 9, 1986, letter from Mr. Roger D. Walker to Mr. J. H. Miller, Jr. of Georgia Power Company.

The enclosure to this letter contains the requested infomation relative to the comprehensive and complex inspection of Plant Hatch for compliance with 10 CFR 50, Appendix R.

A copy of the enclosure, along with applicable drawings and sketches, will be presented at the November 13, 1986, meeting between Georgia Power Company and the NRC, Region II.

In addition to the information presented at the November 13 meeting, analyses and evaluations relative to compliance with Appendix R, Sections III.G, III.J, III.L. and 111.0, will be available on site for review during the intpection scheduled for the week of December 15, 1986.

Appropriate pu sonnel who are knowledgeable with respect to the plant systems required for safe shutdown and the systems' capabilities will be available at the site during the inspection.

Additionally, arrangements have been made to permit your team members access to the radiologically controlled areas of the plant, if necessary.

Should you have questions or require additional information, please contact this office at any time.

Sincerely,

~ ' ' ""c"'

wamy O

1hloI t

Georgia Power A U.S. Nuclear Regulatory Commission Division of Reactor Projects November 13, 1986 Page Two JDH/lc Enclosures c: Georgia Power Company U.S. Nuclear Regulatory Commission tir. J. P. O'Reilly Mr. R. D. Walker, Region II fir. J. T. Beckham, Jr.

f tr. P. Holmes-Ray, Senior Resident fir. H. C. Nix, Jr.

Inspector-Hatch G0-NORMS 0890C

l GeorgiaPower A 4

i ENCLOSURE

{

NRC 00CKETS 50-321, 50-366 i

OPERATING LICENSES DPR-57, NPF-5 l

EDWIN I. HATCH NUCLEAR PLANT UNITS 1 AND 2 INFORMATION RELATIVE TO THE INSPECTION OF COMPLIANCE WITH 10 CFR 50, APPENDIX R I

i 1.

Color-coded piping and instrumentation diagrams for hot shutdown j

systems, cold shutdown systems, and alternative shutdown.

l Pathway 1 systems are coded yellow; pathway 2 systems are coded green j

or blue, depending upon the diesel (s) utilized; and pathway 3 (alternative shutdown) systems are coded orange.

Plant Hatch has inerted containments; therefore, a

fire involving the reactor recirculation pumps is not considered credible during operation.

Consequently, these drawings which depict the recirculation pump oil collection system have not been included.

I UNIT 1 Drawing No.

Rev.

Drawing No.

Rev.

D-11001 25

!!-16063 16 D-11004 17 H-16064 11 1

H-11024 26 H-16065 15 J

H-11036 13 H-16066 19 i

H-11037 15 H-16286 18 l

H-11600 3

H-16329 17 H-11609 2

H-16330 18 H-11631 3

H-16331 11 11-16000 21 H-16332 21 H-16007 13 H-16333 18 H-16011 16 H-16334 16 H-16023 5

H-16335 11 11-16024 26 H-21033 18 H-16062 16 H-26083 16 UNIT 2 Drawing No.

Rev.

Drawing No.

Rev.

i H-16000 23 H-26015 19 H-21026 14 H-26018 16 l

H-21033 18 H-26020 17 H-21034 11 H-26021 14 H-21035 15 H-26023 15 I

H-21039 11 H-26024 13 i

11-21074 10 H-26050 16 H-21084 11 H-26051 16 i

11-26000 18 H-26066 19 l.

0890C E-1 11/13/86 L

r=m

Georgia Power d ENCLOSURE INFORMATION RELATIVE TO THE INSPECTION OF COMPLIANCE WITH 10 CFR 50, APPENDIX R 1.

(Continued)

UNIT 2 (Continued)

Drawing No.

Rev.

Drawing No.

Rev.

H-26001 13 11-26071 3

H-26003 14 H-26074 10 H-26006 13 H-26083 16 H-26007 17 H-26084 19 H-26014 20 H-26189 2

H-28023 4

2.

Plant layout and equipment location drawings which identify physical plant locations of hot shutdown and cold shutdown equipment.

The llatch safe shutdown equipment list which identifies the pathway and location of the equipment is also included.

UNIT 1 UNIT 2 Drawing No.

Rev.

Drawing No.

Rev.

S-15290 H

S-27535 A

S-15422 F

S-27287 0

S-15665 B

S-27926 A

S-15666 B

S-27927 A

S-15667 B

S-27928 A

S-15520 3

H-21001 3

S-15310 3

H-21002 5

H-11000 5

11-21003 2

H-11001 4

H-21004 4

H-11003 5

H-21005 3

H-11004 5

H-21006 3

11-11007 2

11-21007 1

H-11008 2

11-21019 2

11-11017 10 H-26096 5

H-11353 1

H-26097 5

11-11354 3

Il-26098 8

H-11355 1

H-26099 8

11-12320 7

H-26100 7

11-12405 2

H-26101 6

11-12406 3

H-26102 5

H-16519 6

H-26103 6

0890C E-2 11/13/06 rm r r,

4 1

Georgia Power A i

ENCLOSURE INFORMATION RELATIVE TO THE INSPECTION OF COMPLIANCE WITH i

10 CFR 50, APPENDIX R

)

2.

(Continued)

I 1,

UNIT 1 UNIT 2 Drawing No.

Rev.

Drawing No.

Rev.

H-12628 9

H-26104 5

l H-12629 10 H-26105 4

H-12632 6

H-26106 4

H-15851 5

H-22006 6

i H-15852 14 H-22007 9

I H-15854 7

H-22008 6

H-16027 7

H-22009 5

j H-16029 9

H-22010 2

l H-16030 7

H-22011 1

H-16031 8

H-26012 2

j 11-16032 5

H-26036 1

H-16033 5

H-25985 3

H-25986 6

H-25987 4

I H-25988 3

l H-25989 3

H-25990 2

,i I

i 3.

Electrical raceway drawings which identify the cable routing of

)

power, control, and instrumentation circuits for those plant systems j

necessary to achieve hot shutdown and for those systems necessary to i

achieve and maintain cold shutdown.

1 l

Because Plant Hatch does not maintain hot shutdown, the only equipment identified as hot shutdown equipment is the MSIVs and the passive SRVs.

The 'HPCI and RCIC systems are identified as cold i

]

shutdown equipment, because they are used to achieve cold shutdown, l

not to maintain hot shutdown.

The raceway drawings do not separately identify hot and cold shutdown equipment, but the pathway of each

}

raceway is shown on the drawings.

The pathway identifiers for the i

Unit I raceways are shown in the LEGEND for each drawing.

The b

pathway identifiers for the Unit 2 raceways are shown in the LEGEND for drawing H-24601.

0890C E-3 11/13/86

)

rarr.

. -... -,. - - -.. -, _ _ -..... ~ - - - - _,.

GeorgiaPower d ENCLOSURE INFORMATION RELATIVE TO THE INSPECTION OF COMPLIANCE WITH 10 CFR 50, APPENDIX R 6

3.

(Continued)

UNIT 1

~

Drawing No.

Rev.

Drawing No.

Rev.

H-40144 1

H-40187 1

H-40145 1

H-40188 1

H-40146 1

H-40189 1

H-40147 1

H-40190 0

H-40148 0

H-40191 1

H-40149 1

H-40192 i

H-40150 1

H-40193 1

H-40151 1

H-40194 1

H-40152 1

H-40195 1

H-40153 1

H-40196 1

H-40154 1

H-40197 1

H-40155 1

H-40198 1

H-40156 1

H-40199 1

H-40157 1

H-40200 1

H-40158 1

H-40201 1

H-40159 1

H-40202 1

H-40160 1

H-40203 1

H-40161 1

H-40204 1

H-40162 1

H-40205 1

H-40163 1

H-40206 1

H-40164 2

H-40207 1

H-40165 1

H-40208 1

H-40166 1

H-40209 1

H-40167 0

H-40210 1

H-40168 2

H-40211 1

H-40169 1

H-40212 1

H-40170 2

H-40258 1

H-40171 2

H-40259 1

H-40172 1

H-40260 1

H-40173 2

H-40261-1 H-40174 1

H-40262 1

H-40175 1

H-40263 1

H-40176 1

H-40264 1

H-40177 1

H-40266 1

H-40178 1

H-40267 0

H-40179 1

H-40268 1

H-40180 1

H-40269 1

H-40181 1

H-40270 1

0890C E-4 11/13/86 F00715

Georgia Power d ENCLOSURE INFORMATION RELATIVE TO THE INSPECTION OF COMPLIANCE WITH 10 CFR 50, APPENDIX R 3.

(Continued)

UNIT 1 (Continued)

Drawing No.

Rev.

Drawing No.

Rev.

H-40182 1

H-40271 1

H-40183 1

H-40444 1

H-40184 1

H-40580 0

H-40185 1

H-40581 1

H-40186 1

H-40582 1

UNIT 2 Drawing No.

Rev.

Drawing No.

Rev.

H-24601 3

H-24619 2

ll-24602 3

H-24620 1

H-24603 3

H-24621 2

H-21604 2

H-24622 2

H-24605 2

H-24623 3

H-24606 3

H-24625 2

H-24607 2

H-24627 2

H-24608 3

H-24629 3

11-24609 3

H-24630 1

H-24610 3

11-24631 2

H-24611 2

11-24632 2

H-24612 3

H-24633 2

H-24613 3

H-24634 2

H-24614 2

H-24635 2

H-24615 2

H-24636 2

H-24616 2

H-24638 2

11-24617 1

Il-24639 2

H-24618 2

H-24640 2

4.

Single-line ac and de power and control electrical distribution diagrams.

UNIT 1 Drawing Ho.

Rev.

Drawing No.

Rev.

B-17035 3

H-13626 8

H-13350 5

H-13635 15 0890C E-5 11/13/86 rm,,,

,~

GeorgiaPower A ENCLOSURE INFORMATION RELATIVE TO THE INSPECTION OF COMPLIANCE WITH 10 CFR 50, APPENDIX R

.i

, 4.

(Continued) i UNIT 1 (Continued) l Drawing No.

Rev.

Drawing No.

Rev.

t i

H-13351 12 H-13645 10 H-13352 12 H-13646 7

j H-13353 3

H-13647 9

H-13354 2

H-13648 17 i

)

H-13355 10 H-13649 7

H-13356 14 H-13950 20 I

H-13357 6

H-13970 13 i

H-13358 4

H-13974 15 3

1 H-13359 5

H-14217 6

H-13360 18 H-14218 5

j H-13361 16 H-17010 13 H-13362 12 H-17011 15 i

j H-13363 12 H-17012 14 l

H-13364 15 H-17013 9

i H-13365 13 H-17014 4

l H-13366 7

H-17015 16 l

H-13367 12 H-17016 13 f

H-13368 17 H-17017 16 i

H-13369 22 H-17018 6

i H-13370 28 H-17019 15 i

H-13371 15 H-17020 10 H-13386 3

H-17021 10 i

H-13389 14 H-17022 5

H-13392 7

H-17023 6

l H-13406 9

H-17024 5

H-13407 5

H-19836 2

H-13454 15 H-23350 5

H-13580 5

H-23352 8

H-13581 4

H-23353 6

H-13582 8

H-23357 13 H-13583 7

H-23369 24 H-13624 4

H-23371 15 H-13625 7

)

i I

j i

I 0890C E-6 11/13/86 i

r.,,,

Georgialbwer d ENCLOSURE

~INFORMATION RELA 11VE TO THE IN

_10 CFR 50, APPENDIX R WITH

^

4 (Continued)

UNIT 2

_ Drawing No.

Rev.

Drawing No.

H-13352 Rev.

12 H-13356 H-23369 14 H-13357 H-23371 21, 22 6

14 d-13361 11-23380 15 6

H-13370 H-23390 25 16 (1-13371 13 11-27009 2

h-17012 H-27010 12 1

H-23317 H-27011 8

14 11-23350 H-27012 5

10 f.i-23356 14 H-27013 12 11-23357 H-27014 13 14 H-23358 H-27021 12 6

H-23362 H-27023 13 5

H-23368 H-27024 6

5 5.

and fire protection equipment locationsPlant included in the FHA. )

e area and zone delineation (These drawings are also Drawing No.

Rev.

Drawing No.

Rev.

H-11801 E

11-11802 H-11832 D

E H-11804 11-11835 E

0 11-11805 H-11836 E

E H-11806 H-11837 E

0 H-11807 H-11839 E

E H-11811 H-11840 D

0 H-11812 H-11841 E

E

!!-11814 E

11-11842 E

11-11815 H-11843 E

E 11-11816 H-11844 E

0 11-11817 H-11846 E

F H-11818 H-11847 E

0 11-11820

}i-11848 E

E l(-11821 H-11850 E

F 11-11822 H-11851

.0 D

H-11823 E

H-11852 E

11-11854 0

0890C hm!!$

E-7

l (Jecxgia Potver 48k l

ENCLOSURE INFORMATION RELATIVE TO THE INSPECTION OF COMPLIANCE WITH 10 CFR 50, APPENDIX R 5.

(Continued)

Drawing No.

Rev.

Drawing No.

Rev.

H-11826 E

H-11855 E

H-11827 E

H-11856 D

H-11828 E

H-11857 E

11-11829 E

H-11859 E

H-11830 D

H-11860 C

H-11831 D

H-ll833 D

H-11834 D

6.

Sketches which identify the locations of emergency lighting units.

Sketch No.

Sketch No.

SR-CB-164-L SR-R2-B130-10-L SR-CB-147-L SR-R2-B130-11-L SR-CB-130-L SR-R2-B130-12-L SR-R1-185-L SR-R2-B130-13-L SR-R1 -158-L SR-DG-103-L SR-Rl-130-L SR-DG-203-L SR-R1 -B130-15-L SR-DG-303-L SR-Rl-8130-14-L SR-IS-111-L SR-R1 -B130-13-L SR-R1 -0130-12-L NSR-TURBlB-L SR-R1-8130-ll-L NSR-TURBlD-L SR-R1 -B130-10-L NSR-TURB2B-L SR-R2-158-L NSR-TURB2C-L SR-R2-130-L NSR-TURB2D-L 7.

Explanation of associated circuit analysis and a copy of the coordinated breaker calculations.

AC Fault Coordination Study, Volume 1 of 3 AC Fault Coordination Study, Volume 2 of 3 AC Fault Coordination Study, Volume 3 of 3 Medium Voltage Coordination Study, Volume 1 of 1 0890C E-8 11/13/86 100?15

GeorgiaPower d ENCLOSURE INFORMATION RELATIVE TO THE INSPECTION OF COMPLIANCE WITH iU CFR 50, APPENDIX R 7.

(Continued)

Low Voltage Coordination Study (AC), Volume 1 of 2

- Low Voltage Coordination Study (DC), Volume 2 of 2 8.

Plant Hatch Operating Procedures which describe:

1) normal hot an cold shutdown from inside the control rocm, 2) emergency hot and co shutdown from emergency control stations outside and independent o the control
room, and
3) shutdown operations which utiliz alternative shutdown capability and natural circulation.

UNIT 1 Procedure No.

Procedure No.

31E0-E0P-001-1S.

3450-E51 -001 -1 S 31E0-EOP-002-1S 34G0-N11-001 -1 N 34AB-FPX-053-1S 34S0-N61 -001 -1 S 34GO-0PS-013-1S 3450-N62-001 -1 S 3450-Ell-010-1S 34S0-R43-001 -1 s 3450-E21 -001 -1 S 34S0-S22-001 -1 S 34S0-E41 -001 -1 S 34S0-T46-001 -1 S UNIT 2 Procedure No.

Procedure No.

31E0-EOP-001-2S 3450-G41 -001 -2S 31 E0-E0P-002-2S 3450-N61-001-2S

^

34AB-FPX-053-2S 3450-N62-001-2S 34G0-0PS-013-2S 3450-R43-001-25 3450-E11-010-2S 34S0-522-001-2S 34S0-E21-001-2S 34S0-T46-001-2S 34S0-E41-001-2S 34S0-T48-002-2S 3450-E51-001-2S 9.

Fire damage control and repair procedures for cold shutdown systems.

Any actions required are included in the Plant Hatch Operatin Procedures listed in Item 8 above.