Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- B12351, Forwards Rev 12 to Physical Security Plan.Rev Withheld (Ref 10CFR2.790(a)) + (05:37:55, 4 December 2024)
- 05000327/LER-1986-053, :on 861031,noncompliance W/Tech Spec to Estimate Sampler Flow Rate Every 4 H While in Mode 5 Discovered.Caused by Erroneous Cancellation of Surveillance Instruction.Personnel Counseled + (05:37:56, 4 December 2024)
- B12532, Application for Amend to License DPR-61,revising Tech Specs Re RCS low-temp Overpressurization Protection Sys Set Point. Change Will Revise heat-up Curve for 22 Efpys.Fee Paid + (05:37:57, 4 December 2024)
- ML20214S360 + (05:37:59, 4 December 2024)
- ML20214S359 + (05:37:59, 4 December 2024)
- ML20214S356 + (05:38:00, 4 December 2024)
- ML20214S358 + (05:38:00, 4 December 2024)
- ML20214S353 + (05:38:01, 4 December 2024)
- ML20214S349 + (05:38:02, 4 December 2024)
- ML20214S345 + (05:38:03, 4 December 2024)
- ML20214S346 + (05:38:03, 4 December 2024)
- 05000133/LER-1986-002-01, :on 861030,surveillance Test Interval for Tech Spec VII.B.2 Exceeded When Stack Effluent Particulate Not Removed for Lab Counting.Caused by Personnel Error.Formal Schedule for Sample Interval Developed + (05:38:06, 4 December 2024)
- ML20214S339 + (05:38:09, 4 December 2024)
- IR 05000352/1986015 + (05:38:11, 4 December 2024)
- ML20214S334 + (05:38:12, 4 December 2024)
- ML20214S328 + (05:38:13, 4 December 2024)
- ML20214S329 + (05:38:13, 4 December 2024)
- IR 05000412/1987025 + (05:38:14, 4 December 2024)
- ML20214S322 + (05:38:15, 4 December 2024)
- ML20214S319 + (05:38:15, 4 December 2024)
- ML20214S318 + (05:38:16, 4 December 2024)
- ML20214S314 + (05:38:17, 4 December 2024)
- ML20214S316 + (05:38:17, 4 December 2024)
- B12544, Proposed Tech Specs,Incorporating Guarantee That New motor-operated Valves Scheduled for Installation During 1987 Refueling Outage Remain in Respective Positions,Causing No Adverse Effects to ECCS + (05:38:18, 4 December 2024)
- ML20214S312 + (05:38:18, 4 December 2024)
- ML20214S308 + (05:38:19, 4 December 2024)
- ML20214S302 + (05:38:21, 4 December 2024)
- ML20214S297 + (05:38:21, 4 December 2024)
- ML20214S295 + (05:38:22, 4 December 2024)
- ML20214S285 + (05:38:23, 4 December 2024)
- ML20214S292 + (05:38:23, 4 December 2024)
- ML20214S283 + (05:38:24, 4 December 2024)
- ML20214S279 + (05:38:25, 4 December 2024)
- ML20214S278 + (05:38:25, 4 December 2024)
- ML20214S276 + (05:38:26, 4 December 2024)
- ML20214S271 + (05:38:27, 4 December 2024)
- IR 05000352/1987011 + (05:38:28, 4 December 2024)
- ML20214S265 + (05:38:29, 4 December 2024)
- IR 05000335/1986013 + (05:39:38, 4 December 2024)
- PNO-III-87-080, on 870529,reactor Achieved Initial Criticality.Ol Issued on 861017,authorizing Fuel Load & Subcritical Testing.Preparation for & Achievement of Initial Criticality Monitored by Resident Inspectors + (05:39:39, 4 December 2024)
- ML20214S257 + (05:39:40, 4 December 2024)
- ML20214S259 + (05:39:40, 4 December 2024)
- ML20214S252 + (05:39:41, 4 December 2024)
- BECO-86-146, Responds to NRC Re Need for NRC Approved Mod to Facility Automatic Depressurization Logic (Ads),Tmi Item II.K.3.18.Final Design of Mod Will Be Accomplished Prior to Startup from Refueling Outage 7 + (05:39:42, 4 December 2024)
- ML20214S243 + (05:39:43, 4 December 2024)
- ML20214S242 + (05:39:43, 4 December 2024)
- ML20214S238 + (05:39:44, 4 December 2024)
- ML20214S236 + (05:39:45, 4 December 2024)
- ML20214S232 + (05:39:46, 4 December 2024)
- ML20214S233 + (05:39:46, 4 December 2024)
- IR 05000298/1987011 + (05:39:49, 4 December 2024)
- ML20214S226 + (05:39:49, 4 December 2024)