Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20215B493 + (04:15:36, 4 December 2024)
- ML20215B490 + (04:15:36, 4 December 2024)
- ML20215B478 + (04:15:39, 4 December 2024)
- ML20215B471 + (04:15:40, 4 December 2024)
- ML20215B465 + (04:15:41, 4 December 2024)
- ST-HL-AE-2252, Requests Acceptance of Encl Deviations Taken to Apps R & a of BTP-APCSB 9.5-1.Clarification to Two Evaluations in SER (NUREG-0781,Suppl 3) Also Provided + (04:15:42, 4 December 2024)
- ML20215B458 + (04:15:43, 4 December 2024)
- 05000328/LER-1986-037, :on 860826,Surveillance Instructions SI-244, SI-403,SI-409 & SI-422.1 Not Performed within Allowed Time Frames.Caused by Personnel Error.Personnel Counseled & Scintillation Counter Repaired + (04:15:45, 4 December 2024)
- 05000327/LER-1986-040, :on 860826,discovered That Use of Water Seal for Essential Raw Cooling Water Isolation Valves Invalid. Caused by Procedural Inadequacy Due to Failure to Properly Evaluate Bases of Leakage Test + (04:15:47, 4 December 2024)
- 05000328/LER-1986-038, :on 860826,unit Board 2C & Associated Shutdown Boards Inadvertently Deenergized.On 860908,normal Feedwater Breaker Tripped During Transfer of Start Bus 2B from Alternate to Normal + (04:15:49, 4 December 2024)
- ML20215B444 + (04:15:50, 4 December 2024)
- ML20215B446 + (04:15:50, 4 December 2024)
- ML20215B439 + (04:15:51, 4 December 2024)
- ML20215B435 + (04:15:52, 4 December 2024)
- ML20215B431 + (04:15:53, 4 December 2024)
- ML20215B422 + (04:15:55, 4 December 2024)
- ML20215B419 + (04:15:56, 4 December 2024)
- ML20215B415 + (04:15:56, 4 December 2024)
- ML20215B413 + (04:15:57, 4 December 2024)
- ML20215B409 + (04:15:58, 4 December 2024)
- ML20215B406 + (04:15:59, 4 December 2024)
- IR 05000348/1987010 + (04:16:00, 4 December 2024)
- ML20215B401 + (04:16:02, 4 December 2024)
- ML20215B400 + (04:16:03, 4 December 2024)
- ML20215B390 + (04:16:04, 4 December 2024)
- TXX-6494, Interim Deficiency Rept CP-86-76 Re Configuration & Dimensions of Gould Battery Racks Deviating from Drawing Requirements.Initially Reported on 861021.Evaluation in Final Stage of Review.Next Rept Will Be Submitted by 870810 + (04:16:05, 4 December 2024)
- ML20215B384 + (04:16:06, 4 December 2024)
- ML20215B376 + (04:16:06, 4 December 2024)
- ML20215B371 + (04:16:07, 4 December 2024)
- IR 05000166/1987002 + (04:16:12, 4 December 2024)
- ML20215B368 + (04:16:12, 4 December 2024)
- ML20215B367 + (04:16:13, 4 December 2024)
- ML20215B366 + (04:16:14, 4 December 2024)
- ML20215B358 + (04:16:16, 4 December 2024)
- 05000325/LER-1987-015-01, :on 870515,primary Containment Group I Isolation & Reactor Protection Sys Trip Signal Occurred. Caused by Deficient Test Procedure.Isolation & Trip Signal Reset & Procedure Revised + (04:16:18, 4 December 2024)
- ML20215B351 + (04:16:19, 4 December 2024)
- B12501, Proposes Rev to Bases Section 2.4, Max Safety Settings - Protective Instrumentation. Rev Increases PORV Setpoint Above High Pressure Trip Setpoint + (04:16:20, 4 December 2024)
- ML20215B346 + (04:16:21, 4 December 2024)
- ML20215B347 + (04:16:21, 4 December 2024)
- ML20215B343 + (04:16:22, 4 December 2024)
- ML20215B344 + (04:16:22, 4 December 2024)
- ML20215B342 + (04:16:23, 4 December 2024)
- ML20215B339 + (04:16:24, 4 December 2024)
- ML20215B337 + (04:16:24, 4 December 2024)
- ML20215B334 + (04:16:25, 4 December 2024)
- ML20215B333 + (04:16:26, 4 December 2024)
- ML20215B331 + (04:16:27, 4 December 2024)
- ML20215B330 + (04:16:27, 4 December 2024)
- ML20215B326 + (04:16:28, 4 December 2024)
- ML20215B324 + (04:16:29, 4 December 2024)
- ML20215B325 + (04:16:29, 4 December 2024)
- ML20215B321 + (04:16:30, 4 December 2024)