Responds to Generic Ltr 87-02, Verification of Seismic Adequacy of Mechanical & Electrical Equipment in Operating Reactors,Usi A-46. Generic Ltr Does Not Apply Since Plant Permanently Shut Down
ML20215B376
Person / Time
Site: La Crosse File:Dairyland Power Cooperative icon.png
Issue date: 06/03/1987
From: Taylor J
DAIRYLAND POWER COOPERATIVE
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
REF-GTECI-A-46, REF-GTECI-SC, TASK-A-46, TASK-OR GL-87-02, GL-87-2, LAC-12252, NUDOCS 8706170307
Download: ML20215B376 (1)


Text

_ - _ - --

3

(

D DA/RYLAND hh/4/[ COOPERATIVE

  • P.O BOX 817
  • 2615 EAST AVEEO + LA CRObM (608) 788 4000 JAMES W. TAYLOR

/

Gineral Manager June 3, 1987 In reply, please-refer to LAC-12252 DOCKET No. 50 409 f

'U. S. Nuclear Regulatory Commission l

Attention: Document Control Desk

(

Washington, DC 20555 l

4

SUBJECT:

Dairyland Power Cooperative La Crosse' Boiling Water Reactor Provisional Operating License DPR-45 s

Generic Letter No. 87-02 " Verification j

1 of Seismic Adequacy of Mechanical and f

Electrical Equipment in Operating Reactors i

Unresolved Safety Issue A-46"

{

.i Gentlemen:

I l

ThisisDairylandPowerCooperative'sresponsetoGenericLetEerNo.87-02, I

which was received March 9, 1987. Additional response time was granted by A.

Bournia on April 28, 1987, due to the planned permanent shutdown of the La Crosse Boiling Water Reactor.

The generic letter stated that "...the NRC has concluded t. hat the seismic adequacy of certain equipment in operating nuclear power plante chst be j

reviewed...".

The equipment involved was that required to ach2evd and maintain l

hot plant shutdown.

j LACBWR was permanently shutdown on April 30, 1987.

Cold shutdown was also l

reached on April 30.

Since the plant will no longer be operated, this generic letter should not apply.

i If there are any questions, please conUict us.

)

a Sincerely, DAIRYLAND POWER C00P71ATIVE l

l

' r.

8706170307 87 James W. Taylor, e:teral Manager DR ADOCK O pg JWT LSG:sks cc: NRC Resident Inspector A. Bert Davis, Regional Administrator Peter Erickson, LACBWR Project Manager 30g PCI-28 i,b t

e