Text
._.
l.
!
.
i
JUN 101987
'
.
Docket No. 50-166
University of Maryland
ATTN: Dr. George C. Dieter, Dean
College of Engineering
College Park, Maryland
20742
1
Gentlemen:
l
Subject: REQUALIFICATION PROGRAM EVALUATION REPORT NO. 50-166/87-02 (OL)
t
On March 29, 1987, the NRC audited the administration of your annual requalif-
ication written examination. This audit was prompted by your admitted practice
of allowing licensed operator requalification written examinations to be taken
home on an honor-system basis. We view this as a serious management deficiency
in that these examinations are used to certify to the NRC that licensed indi-
1
viduals have successfully completed the licensed operator requalification pro-
)
gram and are proficient enough to warrant license renewal under the provisions
1
of 10 CFR 55.
Since March 4,
1987, we held all operator license renewal re-
quests submitted by your facility in abeyance until an audit of your written
requalification examination program was complete.
The purpose of this audit
was to determine if unproctored examinations had adversely affected operator
knaledge.
Areas examined during this evaluation are described in the Region I Evaluation
Report which is enclosed with this letter. Within the scope of this evaluation
the requalification training program was found to be satisfactory.
Your com-
mitment to continue to administer your requalification program in accordance
with NRC policy as expressed in Generic Letter 83-17 and in your NRC approved
revalification program is noted and will be subject to future audit and in-
spec; ion.
Based on the findings of this audit, and as of the date of this
letter, we will re:,ume proces, sing operator license renewal applications from
your facility according to current NRC policy and directives.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this
letter and the enclosure will be placed in the NRC Public Document Room.
Should you have any questions concerning this report, please contact us.
Sincerely,
Original Signed Byi
8706170294 B70610
Edward C. Wenzinger, Chief
DR
ADOCK 050
6
Peactor Projects Branch 3
0FFICIAL RECORD COPY OL U OF MARY 87-02 - 0001.0.0
_ _- 4
06/09/87
jb%
bI
J
-
i
UM ynrsity of Maryland
2
JIM 10 BU
,
Enclosure: As stated
cc w/ enclosure and Attachment 1:
Dr. F. Munno, Director, Nuclear Engineering Program
Dr. R. Belcher, Reactor Director
Dr. J. Toll, President
Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
State of Maryland (2)
)
bcc w/ enclosure w/o Attachment 1:
DRP Section Chief
D. Coe, Examiner
OL File
Chief, OLB, DLPQE, NRR
MasterFile(WITHALLATTACHMENTSL
J
i
Adv
j/'fCoe/g4b
RI: RP
R
RI -
g63
K
T
p
C lli
W
n er
,
fff}/87
6/1/87
6/f/87
6/ l(/87
6/j0/87
0FFICIAL RECORD COPY OL U OF MARY 87-02 - 0002.0.0
05/29/87
l