7;;
fg_y :..
- v.
PISTAR Version: 3.3.1 Page 1-of 6 PSD-05-051
' Revision 0 F ile' :
O ASJO. SOFT. 2.
l 036.3.3.1~.1-PISTAR-COMPUTER PROGRAM VERIFICATION. DOCUMENT PROGRAM VERSION 3.3.1
. i i
j Prepared by:
Approved by:
OMI./
A cl\\
i
\\W..Axline,'P.E.
N.
Dwan Senior Technician Tec hnical Leader V
Checked by:
K V S4de t/a/es-
~
.o.ee:
Y."Shye,P.E[
K.
Project Engineer s
C 'J 8706170330 B70612 DR ADOCK O 33 i
l
n --
y
)
REVISION CONTROL SHEET f
1 TITLE: PISTAR Computer Program DOCUMENT FILE NUMBER: QASJO. SOFT.2.036.3.3.1.1 Verificntion Document -
i Progran: Version 3.3.1
{
Nancy Dwan/ Senior Technician
~[L N AME / TITLE INITIALS i
Ken Shye/ Senior Engineer E v5 N AME / TITLE I ITIALS James.W. Axline/ Technical Leader y
NAME/ TITLE INITIALS i
N AME / TITLE INIT7.LS i
NAME / TITLE INITIALS j
.q I
AFFECTED DOC PREPARED ACCURACY CRITERIA REMARKS PAGE(S)
REV BY / DATE CHECK BY / OATE CHECK BY / DATE 1
0
((
A Initial Issue
\\f 2
0 3
0 I
4 0
g y
bb N'h IflY $5 h*
)
pm
+y 1
i e
G QEP 3 3.1.1 REV 1
1 PISTAR Vorsion 3.3.1 5
.Page 2 of 6 PSD-05-051 PISTAR PROGRAM VERIFICATION DOCUMENT I.
PROGRAM INFORM ATION A.
Version:
3.3.1 B.
Creation Date 1.
CDC Cyber 730 (Opticom Center):
December 5, 1984 II.
Program Storage Information l
A.
CDC Cyber 730 (Opticom Center) l i
1.
Tapes Reel Generation Generation File No.
Label Run ID Date
_Information A01854 PS* 3P3P1 AIMOOLM 12/05/84 1.
Program Absolute A01961 PS*3P3P1 AIM 0004 12/06/84 2.
Program i
- BKUP Update File j
3.
Relocatable j
- 4. Segload Update File S. Program Load Map III.
USER DOCUMENTATION A.
User's Manual:
PIST AR USER' S MANUAL, Document No.
TR-75-002 B.
Revision:
10 C.
Date Issued:
September 1984 D.
File:
OASJO. SOFT. 2.036.3.3.0.2 IV.
PROGRAM RELE ASE VERIFICATION A.
Methods of Verification 1.
PISTAR reanalysis was performed using version 3.3.1 for one verification problem c
PISTAR Varsion 3.3.1 "Pago 3 of 6'
~
'PSD-05-051
. presented in_NUTECH Report "PISTAR Verifica -
tion Report," TR-76-001,. Revision 0.
Results of the reanalysis-are presented in Attachment II.
Microfiche of.the PISTAR
_ computer print-out are contained.in Attachment IV.
2.
PISTAR' analysis was performed using Version 3.3.1 for five NRC benchmark problems presented in NUTECH Report, "PISTAR, Piping Analysis Computer Program, Verification to NRC Benchmark Problems," PSD-01-016, Revision 2.
PISTAR analysis was also performed for two. additional response spectrum' analysis benchmark-problems.
.Results of the. analysis are presented in Attachment II.
Microfiche of the.PISTAR computer print-out are contained ~in Attachment IV.
3.
Test cases were performed to verify the changes made to the Code Evaluation Phase.
A description of thef modifications is provided'in Attachment I.
-The results of the verification are presented'in. Attachment III.
Microfiche of the PISTAR computer-output are contained in Attachment.IV.
V.
REFERENCES 1.
PISTAR Program Verification _ Report, Revision 1
0, Document No. TR-76-001, Nuclear Technol-ogy Inc., San Jose,-CA, dated January, 1977.
2.
PISTAR Piping Analysis Computer Program Verification to NRC Benchmark Problems, i
Revision 2, Document No. PSD-01-016, Nuclear Technology Inc., San Jose, CA, dated June, 1980.
O M
a
]
PISTAR Version 3.3.1
-Page=4 of 6 PSD-05-051 ATTACHMENT I PISTAR VERSION 3.3.1 i
DESCRIPTION OF PROGRAM MODIFICATIONS / VERIFICATION i
The program modifications'and the procedures listed for their verification are listed below.
A total of 13 verification i
problems were analyzed to verify the usual functions of the
. program, as well as the modifications incorporated in Version
- 3.3.1.
1.
Modifications were made to the Code Evaluation Phase to correct an error in Version 3.3.0 which caused the program to terminate execution,1f a TYPE CODE other than " DESIGN" was specified on the. CODE input card for Class 2 and' Class 3.
The verification problem PSTVPS3 was first~run using:
Version 3.3.0 to demonstrate the nature of-the problem (Run ID AIMODVS).
This verification problemLwas then run using Version 3.3.1 with TYPE CODES specified as "LEVELC",
"LEVELD", and " TEST" for Class 2 and Class 3 (Run ID's AIMODSM and AIMODSO).
The resultsiof the analysis were' compared to-the results of the same problems run.using Version 3.2.0 (Run ID's AIMOUPY'and AIMOUPV).
The comparison yielded identical'results and showed that the program is working correctly.
I i
e 9
a
Q PISTAR Varsion!3.3'.l'
~
A i r.
Page:51of'6 PSD-05-051
't ATTACHMENT II RESULTS OF 1
VERIFICATION AND ' NRC BENCHMARK ' PROBLEMS REANALYSIS
]
~
i One~of~the eleven verificationLproblems presented'in the-NUTECH-Report, "PISTAR Verification Report," TR-76-001, Revision 0, fiveL NRC' benchmark problems presented'in:the NUTECH. Report, "PISTAR,--
/
Piping' Analysis Computer _ Program. Verification to NRC' Benchmark 4
Problems," PSD-01-016, Revision.2, and two response spectrum analysis NRC Benchmark problems were analyzed using.Versionf3.3.1
.of the PISTAR computer program.
The results f rom Version. 3.3.1 of the PISTAR computer program'..
1 were compared to the PISTAR results' presented in.the Verification' Reports.
Comparison of these results'are. discussed below.
Problem ID Problem Description Comparison of Results.
Verification Problems:
PSTV15 Class 2 Code Evaluation Results identical (Run ID AIMODUX).
1 NRC Benchmark Problems:
i PSTV1 NRC Benchmark Problem 1 Results identical l
(Run ID AIMODSR)
)
PSTV2 NRC Benchmark Problem 2 Results identical (Run ID AIMODSW)'
PSTV3 NRC Benchmark Problem 3' Results identical 3
i (Run ID AIMODSZ)-
PSTV4 NRC Benchmark Problem 4 Results identical 1
(Run ID AIMODTE)
PSTV5 NRC Benchmark Problem 101 Results identical (Run ID AIMODTL) l PSTV6 NRC Benchmark Problem 323A Results identical
~
(Run ID AIMODUI)
PSTV7 NRC Benchmark Problem 803 Results identical (Run ID-AIMODUW)'
- 4 l
PISTAR Version 3.3.1 Page 6 of 6 PSD-05-051 i
ATTACHMENT III l
RESULTS OF 1
J SUPPLEMENTAL VEEIFICATION The modifications incorporated into PISTAR Version 3.3.1, along with the verification procedures, are listed and described in Attachment I.
The following verification problems were analyzed specifically to check the modifications incorporated in Version 3.3.1.
Modification Comparison of Results 1.
Code Evaluation Error Results as expected (Run ID'S AIMODVS, AIMODSM, AIMQDSO, AIMOUPY, AIMOUPV) l t
a