Advises of Rev to Proposed Schedule for Implementation of Final Rule 10CFR50.62 on Reduction of Risk from Atws.Design Info Required by 10CFR50.62(c)(6) Will Be Submitted in Feb 1987
ML20215B342
Person / Time
Site: Beaver Valley
Issue date: 09/17/1986
From: Sieber J
DUQUESNE LIGHT CO.
To: Tam P
Office of Nuclear Reactor Regulation
References
NUDOCS 8610060517
Download: ML20215B342 (2)


Text

.

A das

'Af Telephone (412) 393-6000 Nuclear Group P.O. Box 4 September 17, 1986 i

Shippingport, PA 15077 0004 l

Director of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Attn:

Mr. Peter S. Tam, Project Manager Project Directorate No. 2 Division of PWR Licensing - A Washington, DC 20555

- Mail Stop 340 -

Reference:

Beaver Valley Power Station, Unit No. I Docket No. 50-334, License No. DPR-66 10 CFR 50.62, ATWS Rule Schedule Gentlemen:

On June 26, 1984, the final rule on reduction of risk from Anticipated Transients Without Scram (ATWS) was published in the Federal Register (49FR26036) as 10 CFR 50.62.

By letter dated June 26, 1985, Duquesne Light Company provided a proposed schedule for implementation per Section 50.62(d).

Our plans are to implement one of the Westinghouse Owner's Group generic designs described in WCAP-10858.

However, since the safety evaluation allowing reference to the report was not issued until July 7, 1986, we are providing a revision to tha schedule as follows:

The design information required by 50.62(c)(6) will be submitted in February 1987 instead of November 1986.

Final implentation is still scheduled for our sixth refueling outage which is tentatively planned for November 1987. This schedule change was discussed with our NRC Project Manager on September 10, 1986, who l

indicated that the proposed change appeared acceptable.

If you have any questions, please contact my office.

Ver.y truly yours,

'n

,616-

. D. Sieber (Vice President Nuclear Operations 8610060517 860917 PDR ADOCK 00000334 P

PDR

\\.

, o i

I

-Beaver Valley Power Station, Unit No. 1 Docket No. 50-334, License No. DPR-66 10CFR50.62, ATWS Rule Schedule Page 2 cc: Mr. W. M. Troskoski, Resident Inspector U.lS. Nuclear Regulatory Commission Beaver Valley Power Station Shippingport, PA 15077 U. S. Nuclear Regulatory Commission c/o Document Branch Washington, DC 20555 Director, Safety Esaluation & Control Virginia Electric & Power Company P. 0. Box 26666 One James River Plaza Richmond, VA 23261 U. S. Nuclear Regulatory Commission Division of Licensing Attn: Steva A. Varga, Chief Operating Reactors Branch no. I Division of Licensing Washington, DC 20555 l

r l