Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20215J722 + (03:00:40, 4 December 2024)
- ML20215J721 + (03:00:41, 4 December 2024)
- 05000213/LER-1987-004, :on 870406,fire Barrier Separating Cable Spreading Area & Turbine Bldg Declared Inoperable.Caused by Inadequate Engineering Involvement During Initial Installation of Seal.Fire Watch Established + (03:00:44, 4 December 2024)
- ML20215J717 + (03:00:45, 4 December 2024)
- ML20215J715 + (03:00:45, 4 December 2024)
- ML20215J713 + (03:00:46, 4 December 2024)
- ML20215J712 + (03:00:47, 4 December 2024)
- ML20215J711 + (03:00:47, 4 December 2024)
- BSEP-86-1431, Responds to NRC Ltr Re Violations Noted in Insp Repts 50-324/86-18 & 50-325/86-17.Corrective Actions:Controlling Procedure WP-18 Revised & Individual Responsible for Rigging Scaffolding to Snubber Appropriately Disciplined + (03:00:48, 4 December 2024)
- ML20215J710 + (03:00:48, 4 December 2024)
- ML20215J706 + (03:00:49, 4 December 2024)
- 05000323/LER-1986-023, :on 860918,automatic Reactor Trip & Subsequent Turbine Trip Occurred.Caused by Main Feedwater Pump 2-2 Reducing to Min Speed While Plant Technicians Made Adjustments to Lovejoy Controller + (03:00:51, 4 December 2024)
- TXX-6431, Discusses Failure to Disposition Nonconformance Repts Re Resolution of Inspector Errors & Weld Separation Measurement Methodology Committed to in 870112 Response to Insp Rept 50-446/86-02.New Disposition & Compliance Dates Listed + (03:00:51, 4 December 2024)
- ML20215J702 + (03:00:52, 4 December 2024)
- ML20215J699 + (03:00:53, 4 December 2024)
- ML20215J701 + (03:00:53, 4 December 2024)
- ML20215J698 + (03:00:54, 4 December 2024)
- ML20215J696 + (03:00:54, 4 December 2024)
- ML20215J694 + (03:00:55, 4 December 2024)
- 3F0886-08, Responds to SALP Rept 50-302/86-13.Quality Audit Program Considered Essential Element of Nuclear Program.Recognition of Strong Maint Program Appreciated.Actions Taken to Resolve Security Deficiencies Noted + (03:00:56, 4 December 2024)
- 05000454/LER-1986-026-01, :on 860921,actuation of Control Room Ventilation Occurred.Caused by Lightning Strike on Offsite 138 Kv Transmission Line.Mods Installed in 1985 to Reduce Undervoltage Trip Setpoint + (03:00:57, 4 December 2024)
- 05000285/LER-1987-009, :on 870404,during Refueling Shutdown Condition, All Offsite Ac Power Was Lost.Caused by Worker Inadvertently Pulling Wrong Potential Transformer (PT) Fuses.Pt Fuses Associated W/Transformer Reinstalled + (03:01:00, 4 December 2024)
- ML20215J685 + (03:01:00, 4 December 2024)
- ML20215J684 + (03:01:01, 4 December 2024)
- ML20215J682 + (03:01:02, 4 December 2024)
- ML20215J683 + (03:01:02, 4 December 2024)
- ML20215J681 + (03:01:03, 4 December 2024)
- ML20215J679 + (03:01:03, 4 December 2024)
- ML20215J677 + (03:01:04, 4 December 2024)
- ML20215J678 + (03:01:04, 4 December 2024)
- ML20215J675 + (03:01:05, 4 December 2024)
- ML20215J676 + (03:01:05, 4 December 2024)
- 05000454/LER-1986-012-01, :on 860327,RPI Surveillance Not Performed within 4 H.Caused by Personnel Error.Bank Demand Vs Digital RPI Surveillance Reinstated + (03:01:07, 4 December 2024)
- ML20215J672 + (03:01:08, 4 December 2024)
- ML20215J673 + (03:01:08, 4 December 2024)
- IR 05000219/1987009 + (03:01:09, 4 December 2024)
- ML20215J669 + (03:01:10, 4 December 2024)
- ML20215J667 + (03:01:11, 4 December 2024)
- ML20215J666 + (03:01:11, 4 December 2024)
- ML20215J664 + (03:01:13, 4 December 2024)
- TXX-6342, Informs That Preparation of Revised Response Clarifying 860403 Response to Notice of Deviation Underway,Per NRC Identification in Mar 1987 Insp of Util Failure to Perform Committed Actions + (03:01:14, 4 December 2024)
- IR 05000352/1987007 + (03:01:20, 4 December 2024)
- ML20215J659 + (03:01:21, 4 December 2024)
- ML20215J655 + (03:01:22, 4 December 2024)
- 05000322/LER-1987-007, :on 870425,Suffolk County Police Dept Reported to Security Organization That Telephone Bomb Threat Made Against Plant.Emergency Plan Unusual Event Procedures Implemented.No Bomb Found + (03:01:25, 4 December 2024)
- ML20215J653 + (03:01:26, 4 December 2024)
- ML20215J651 + (03:01:27, 4 December 2024)
- ML20215J652 + (03:01:27, 4 December 2024)
- ML20215J649 + (03:01:28, 4 December 2024)
- ML20215J650 + (03:01:28, 4 December 2024)
- ML20215J645 + (03:01:29, 4 December 2024)
- ML20215J641 + (03:01:30, 4 December 2024)