Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20215J772 + (03:00:05, 4 December 2024)
- IR 05000341/1987001 + (03:00:08, 4 December 2024)
- ML20215J766 + (03:00:09, 4 December 2024)
- A05947, Contends That Unit 1 Fully Complies W/Requirements of 10CFR50.44 W/O Need to Install Hydrogen Recombiners or Purge/Nitrogen Repressurization Sys,Per NRC 860812 Request + (03:00:10, 4 December 2024)
- IR 05000219/1987008 + (03:00:15, 4 December 2024)
- ML20215J763 + (03:00:16, 4 December 2024)
- 05000266/LER-1987-001-01, :on 870404,unit Manually Tripped After 22 Control Rods Dropped.Reactor Engineer Incorrectly Connected Leads Shorting Out Test Instrument.Mods to Test Equipment to Prevent Hookup Errors Evaluated + (03:00:18, 4 December 2024)
- ML20215J761 + (03:00:19, 4 December 2024)
- ML20215J759 + (03:00:19, 4 December 2024)
- ML20215J758 + (03:00:20, 4 December 2024)
- ML20215J756 + (03:00:24, 4 December 2024)
- ML20215J757 + (03:00:24, 4 December 2024)
- TXX-6524, Interim Deficiency Rept CP-85-53 Re Seismic Category I Platforms.Initially Reported on 851220.Platform Previously Misidentified as Category II Now Classified Category I. Rework Will Be Performed.Next Rept Anticipated by 871220 + (03:00:25, 4 December 2024)
- ML20215J755 + (03:00:25, 4 December 2024)
- ML20215J751 + (03:00:26, 4 December 2024)
- ML20215J750 + (03:00:27, 4 December 2024)
- ML20215J747 + (03:00:28, 4 December 2024)
- ML20215J746 + (03:00:28, 4 December 2024)
- ML20215J745 + (03:00:29, 4 December 2024)
- ML20215J744 + (03:00:29, 4 December 2024)
- ML20215J741 + (03:00:30, 4 December 2024)
- PNO-IV-86-032, on 861023,boric Acid Corrosion on HPI Nozzle for Penetration Into Reactor Coolant Pump a Discharge Pipe discovered.Body-to-bonnet Leak on Manual Isolation Valve in HPI Apparent Source.B&W to Assist in Evaluation of Problem + (03:00:31, 4 December 2024)
- ML20215J735 + (03:00:31, 4 December 2024)
- PNO-I-86-086A, on 861022,NRC Inspectors Confirmed That Mo-99/ Tc-99m Generator Inadvertently Incinerated.Caused by Use of Nonfunctioning Survey Equipment & Poor Technique.Incinerator Shut Down Until Background Levels Achieved + (03:00:32, 4 December 2024)
- ML20215J731 + (03:00:33, 4 December 2024)
- ML20215J729 + (03:00:34, 4 December 2024)
- 05000293/LER-1987-005, :on 870331,loss of Preferred Offsite Power Occurred During Storm.Caused by Loss of Transmission Line 342 & Alternate Transmission Line 355 Becoming Isolated from Startup Transformer.Offsite Power Restored + (03:00:36, 4 December 2024)
- ML20215J725 + (03:00:36, 4 December 2024)
- IR 05000309/1986013 + (03:00:39, 4 December 2024)
- ML20215J722 + (03:00:40, 4 December 2024)
- ML20215J721 + (03:00:41, 4 December 2024)
- 05000213/LER-1987-004, :on 870406,fire Barrier Separating Cable Spreading Area & Turbine Bldg Declared Inoperable.Caused by Inadequate Engineering Involvement During Initial Installation of Seal.Fire Watch Established + (03:00:44, 4 December 2024)
- ML20215J717 + (03:00:45, 4 December 2024)
- ML20215J715 + (03:00:45, 4 December 2024)
- ML20215J713 + (03:00:46, 4 December 2024)
- ML20215J712 + (03:00:47, 4 December 2024)
- ML20215J711 + (03:00:47, 4 December 2024)
- BSEP-86-1431, Responds to NRC Ltr Re Violations Noted in Insp Repts 50-324/86-18 & 50-325/86-17.Corrective Actions:Controlling Procedure WP-18 Revised & Individual Responsible for Rigging Scaffolding to Snubber Appropriately Disciplined + (03:00:48, 4 December 2024)
- ML20215J710 + (03:00:48, 4 December 2024)
- ML20215J706 + (03:00:49, 4 December 2024)
- 05000323/LER-1986-023, :on 860918,automatic Reactor Trip & Subsequent Turbine Trip Occurred.Caused by Main Feedwater Pump 2-2 Reducing to Min Speed While Plant Technicians Made Adjustments to Lovejoy Controller + (03:00:51, 4 December 2024)
- TXX-6431, Discusses Failure to Disposition Nonconformance Repts Re Resolution of Inspector Errors & Weld Separation Measurement Methodology Committed to in 870112 Response to Insp Rept 50-446/86-02.New Disposition & Compliance Dates Listed + (03:00:51, 4 December 2024)
- ML20215J702 + (03:00:52, 4 December 2024)
- ML20215J699 + (03:00:53, 4 December 2024)
- ML20215J701 + (03:00:53, 4 December 2024)
- ML20215J698 + (03:00:54, 4 December 2024)
- ML20215J696 + (03:00:54, 4 December 2024)
- ML20215J694 + (03:00:55, 4 December 2024)
- 3F0886-08, Responds to SALP Rept 50-302/86-13.Quality Audit Program Considered Essential Element of Nuclear Program.Recognition of Strong Maint Program Appreciated.Actions Taken to Resolve Security Deficiencies Noted + (03:00:56, 4 December 2024)
- 05000454/LER-1986-026-01, :on 860921,actuation of Control Room Ventilation Occurred.Caused by Lightning Strike on Offsite 138 Kv Transmission Line.Mods Installed in 1985 to Reduce Undervoltage Trip Setpoint + (03:00:57, 4 December 2024)
- 05000285/LER-1987-009, :on 870404,during Refueling Shutdown Condition, All Offsite Ac Power Was Lost.Caused by Worker Inadvertently Pulling Wrong Potential Transformer (PT) Fuses.Pt Fuses Associated W/Transformer Reinstalled + (03:01:00, 4 December 2024)