Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20215L018 + (02:45:43, 4 December 2024)
- ML20215L015 + (02:45:44, 4 December 2024)
- ML20215L013 + (02:45:47, 4 December 2024)
- ML20215L012 + (02:45:48, 4 December 2024)
- ML20215L011 + (02:45:49, 4 December 2024)
- TXX-6050, Interim Deficiency Rept CP-85-50 Re Improper Welding Processes Used in Mfg of Cable Tray Tee Fittings.Initially Reported on 851206.Testing Program Implemented.Vendor Identifying Min Weld Requirements.Next Rept by 861219 + (02:45:49, 4 December 2024)
- ML20215L005 + (02:45:50, 4 December 2024)
- 05000336/LER-1986-008-02, :on 860920,6 of 16 Valves Failed Main Steam Safety Valve Simmer Test.Caused by Setpoint Drift.Increased Accuracy Pressure Gauges Used to Reduce Test Error & Spring & Ambient Temps Recorded + (02:45:53, 4 December 2024)
- ML20215L000 + (02:45:54, 4 December 2024)
- ML20215K997 + (02:45:55, 4 December 2024)
- AECM-86-0057, Forwards Semiannual Radioactive Effluent Release Rept for Jul-Dec 1985. Affirms That Past & Present Determinations of Solid Radwaste Total Ci Quantity Performed by Measurement, Not Estimation + (02:45:56, 4 December 2024)
- ML20215K994 + (02:45:56, 4 December 2024)
- ML20215K992 + (02:45:57, 4 December 2024)
- ML20215K990 + (02:45:58, 4 December 2024)
- 05000366/LER-1986-026-01, :on 860919,reactor Protection Sys Actuation Occurred Initiating one-half Primary Containment Isolation Sys Valve Group 2 & RHR Shutdown Cooling Sys Isolation. Caused by False Signals + (02:46:00, 4 December 2024)
- ML20215K988 + (02:46:00, 4 December 2024)
- ML20215K984 + (02:46:01, 4 December 2024)
- ML20215K987 + (02:46:01, 4 December 2024)
- 05000331/LER-1986-019, :on 860922,250-volt Dc Battery Declared Inoperable.Caused by Degradation of Positive Plates Due to Galvanic Reaction Resulting from Impurities in Plate Weld Matls.Battery Tested & 16 Cells Replaced + (02:46:03, 4 December 2024)
- ML20215K978 + (02:46:04, 4 December 2024)
- ML20215K977 + (02:46:05, 4 December 2024)
- ML20215K976 + (02:46:05, 4 December 2024)
- ML20215K975 + (02:46:06, 4 December 2024)
- 05000440/LER-1986-063, :on 860923,discovered That on 860918,Unit 1 Div 3 125-volt Dc Distribution Bus ED-1-C Disconnected from Unit 1 Div 3 Battery & Normal Charger & cross-connected to Unit 2 Div 3 Battery & Charger.Procedure Revised + (02:46:08, 4 December 2024)
- ML20215K972 + (02:46:08, 4 December 2024)
- ML20215K971 + (02:46:09, 4 December 2024)
- L-86-416, Marine Turtle Removals for Jul-Sept 1986 + (02:46:10, 4 December 2024)
- ML20215K970 + (02:46:10, 4 December 2024)
- ML20215K968 + (02:46:11, 4 December 2024)
- ML20215K966 + (02:46:11, 4 December 2024)
- ML20215K965 + (02:46:12, 4 December 2024)
- ML20215K963 + (02:46:13, 4 December 2024)
- ML20215K964 + (02:46:13, 4 December 2024)
- ML20215K962 + (02:46:14, 4 December 2024)
- ML20215K961 + (02:46:15, 4 December 2024)
- 05000213/LER-1986-032, :on 860710,one of Four ex-core Channels Failed to Meet Acceptance Criteria for Dropped Rod Load Runback Setpoint.Caused by Setpoint Drift.Setpoint Recalibr + (02:46:17, 4 December 2024)
- ML20215K956 + (02:46:17, 4 December 2024)
- ML20215K955 + (02:46:18, 4 December 2024)
- ML20215K954 + (02:46:18, 4 December 2024)
- ML20215K953 + (02:46:19, 4 December 2024)
- ML20215K951 + (02:46:20, 4 December 2024)
- ML20215K950 + (02:46:20, 4 December 2024)
- ML20215K949 + (02:46:21, 4 December 2024)
- ML20215K947 + (02:46:22, 4 December 2024)
- ML20215K948 + (02:46:22, 4 December 2024)
- ML20215K946 + (02:46:23, 4 December 2024)
- ML20215K945 + (02:46:23, 4 December 2024)
- ML20215K941 + (02:46:24, 4 December 2024)
- ML20215K944 + (02:46:24, 4 December 2024)
- ML20215K937 + (02:46:25, 4 December 2024)
- ML20215K936 + (02:46:26, 4 December 2024)
- ML20215K935 + (02:46:26, 4 December 2024)