Forwards Safety Evaluation Accepting Process Control Program (Pcp),Updated Through 850718,on Interim Basis. Revised PCP Guidelines,Incorporating 10CFR61 Requirements, Scheduled for Development in FY87
ML20215K954
Person / Time
Site: LaSalle  
Issue date: 10/16/1986
From: Adensam E
Office of Nuclear Reactor Regulation
To: Farrar D
COMMONWEALTH EDISON CO.
Shared Package
ML20215K957 List:
References
NUDOCS 8610280396
Download: ML20215K954 (2)


Text

,

October 16, 1986 D M UTION:

d ocket Nos. 50-373/374 NRC PDR Docket Nos. 50-373 Local PDR and 50-374 BWD-3 r/f EAdensam EHylton Mr. Dennis L. Farrar ABournia Director of Nuclear Licensing RBernero Comonwealth Edison Company WMeinke P.O. Box 767 BGrimes Chicago, Illinois 60690 EJordan JPartlow

Dear Mr. Farrar:

Attorney, OGC ACRS (10)

Subject:

Interim Acceptance of Process Control Program Updated Through July 18, 1985, for la Salle County Station, Units 1 and 2 Your memoranda and attachments submitted February 11, and August 14, 1985, as part of your la Salle County Station, Units 1 and 2 Annual Operating Report modifies and augments your Process Control Program (PCP) dated December 29, 1983.

We have reviewed these submittals and find that the resulting PCP, updated through July 18, 1985, complies with the current NRC criteria; and therefore, is acceptable on an interim basis for use with the la Salle Units 1 and 2 Radiological Effluent Technical Specifications. Our findings are documented in the enclosed Safety Evaluation.

The acceptability of this PCP is based on currently available guidelines that d) not fully incorporate the guidelines of 10 CFR 61.

Revised PCP guidelines incorporating the requirements of 10 CFR 61 are scheduled for development in FY 87. These forthcoming actions should be treated as a separate licensing action.

Sincerely,

/S/

Elinor G. Adensam, Director BWR Project Directorate No. 3 Division of BWR Licensing

Enclosure:

As stated cc: See next page 0b l

BWD-3: DBL LS 3: DBL D WD-3: DBL ABournia/hmc E

on nsam 10//86 10/tl/86 10/q/86

/

8610280396 861016 DR ADOCK 0500 3

~

la Salle County Nuclear Power Station Mr. Dennis L. Farrar Commonwealth Edison Company Units 1 & 2 CC*

Philip P. Steptoe, Esquire John W. McCaffrey Suite 4200 Chief, Public Utilities Division One First National Plaza 160 North La Salle Street, Room 900 Chicago, Illinois 60603 Chicago, Illinois 60601 Assistant Attorney General 188 West Randolph Street Suite 2315 Chicago, Illinois 60601 Resident Inspector /LaSalle, NPS ti.S. Nuclear Regulatory Commission Rural Route No. 1 P. O. Box 224 Marseilles, Illinois 61341 Chairman la Salle County Roard of Supervisors la Salle County Courthouse Ottawa, Illinois 61350 Attorney General 500 South 2nd Street Springfield, Illinois 62701 Chairman Illinois Commerce Commission Leland Building 527 East Capitol Avenue Springfield, Illinois 62706 l

Mr. Gary N. Wriaht, Manager l

Nuclear Facility Safety' Illinois Department of Nuclear Safety 1035 Outer Park Drive, 5th Floor Springfield, Illinois 62704 Regional Administrator, Region III U. S. Nuclear Regulatory Commission 799 Rossevelt Road l

Glen Ellyn, Illinois 60137 l

l 29 l

..,