- ML19260D694 + (17:30:37, 3 January 2025)
- 05000293/LER-1980-002, Forwards LER 80-002/02T-0 + (17:30:39, 3 January 2025)
- ML19260D690 + (17:30:40, 3 January 2025)
- ML19260D689 + (17:30:40, 3 January 2025)
- ML19260D688 + (17:30:42, 3 January 2025)
- ML19260D686 + (17:30:43, 3 January 2025)
- 05000368/LER-1979-087-03, Updated LER 790987/03X-1:on 791114,during Mode 5 Operation, Leak Was Discovered in Socket Weld on LPSI Flow Orifice Valve 2SI-5091B.Failure Resembles Mechanical Fatigue Failure of Weld.Valve Replaced & Socket Weld Dye Penetr + (17:30:44, 3 January 2025)
- 05000368/LER-1980-002-03, /03L-0:on 800110,during Mode 1 Operation,Core Protection Calculator C Failed,Resulting in DNBR & Linear Power Density Trips in Channel C Primary Power Sys.Cause Undetermined.Sys Restarted During Failure Analysis + (17:30:47, 3 January 2025)
- ML19260D683 + (17:30:48, 3 January 2025)
- ML19260D682 + (17:30:49, 3 January 2025)
- ML19260D681 + (17:30:50, 3 January 2025)
- 05000368/LER-1980-001-03, /03L-0:on 800107,during Mode 1 Operation, Containment Isolation Valve 25V-5876-2 Failed to Close After Taking Samples from Safety Injection Tanks for Boron Analysis.Caused by Faulty Valve Position Indication + (17:30:51, 3 January 2025)
- ML19260D678 + (17:30:53, 3 January 2025)
- 05000368/LER-1979-087, Forwards LERs 80-001/03L-0,80-002/03L-0 & Updated LER 79-087/03X-1 + (17:30:54, 3 January 2025)
- ML19260D674 + (17:30:55, 3 January 2025)
- 05000245/LER-1980-001-03, /03L-0:on 800103,runback of Recirculation Pump a Resulted in Pump Speed Mismatch Greater than 10%.Resulted in Possible Error in LPCI Loop Selection Logic.Caused by Electronic Saturation.Sys Mods Being Considered + (17:31:00, 3 January 2025)
- 05000333/LER-1980-008-03, /03L-0:on 800109,while Performing Surveillance, Core Spray Valve 14-MOV-12B Failed to Open as Required. Caused by Torque Switch Not Being Bypassed for Sufficient Time Period.Adjusted Torque & Limit Switches + (17:31:01, 3 January 2025)
- ML19260D670 + (17:31:03, 3 January 2025)
- 05000245/LER-1980-001, Forwards LER 80-001/03L-0 + (17:31:05, 3 January 2025)
- 05000333/LER-1980-008, Forwards LER 80-008/03L-0 + (17:31:06, 3 January 2025)
- ML19260D665 + (17:31:08, 3 January 2025)
- ML19260D664 + (17:31:09, 3 January 2025)
- 05000333/LER-1980-006, Forwards LER 80-006/03L-0 + (17:31:11, 3 January 2025)
- ML19260D661 + (17:31:12, 3 January 2025)
- ML19260D660 + (17:31:13, 3 January 2025)
- IR 05000250/1979037 + (17:31:14, 3 January 2025)
- ML19260D658 + (17:32:33, 3 January 2025)
- 05000333/LER-1980-007-03, /03L-0:on 800109,during Normal Operation,B Loop of RHR Declared Inoperable While Hanger H10-28 Was Inoperable for IE Bulletin 79-02 Testing.Caused by Failure of Concrete Anchors Under Pull Test.Repairs Made + (17:32:40, 3 January 2025)
- ML19260D656 + (17:32:43, 3 January 2025)
- ML19260D655 + (17:32:45, 3 January 2025)
- 05000317/LER-1980-006-03, /03L-0:on 800103,while Performing Routine Surveillance Test,Control Element Assembly 60 Was Dropped Into Core.Cause Unknown.All Parameters Found Normal & No Problems Encountered.No Further Action Anticipated + (17:33:19, 3 January 2025)
- ML19260D653 + (17:33:22, 3 January 2025)
- ML19260D652 + (17:33:23, 3 January 2025)
- ML19260D651 + (17:33:25, 3 January 2025)
- ML19260D650 + (17:33:28, 3 January 2025)
- 05000333/LER-1980-007, Forwards LER 80-007/03L-0 + (17:34:09, 3 January 2025)
- ML19260D647 + (17:34:13, 3 January 2025)
- 05000317/LER-1980-006, Forwards LER 80-006/03L-0 + (17:34:51, 3 January 2025)
- 05000333/LER-1980-005-03, /03L-0:on 800107,during Review of Reactor Water Chemistry Data,Noted That Some Required Samples Were Not Obtained.Technicians Did Not Take Samples Due to Low Level Conductivity & Chloride Ion Concentrations + (17:35:30, 3 January 2025)
- ML19260D643 + (17:35:35, 3 January 2025)
- 05000317/LER-1980-001-03, /03L-0:on 800104,high Pressure Safety Injection Loop 12A Stop Would Not Move to Throttled Position.Caused by Loose Termination on One Electrical Lead Terminating at Valve Torque Switch.Terminal Screw Tightened + (17:35:43, 3 January 2025)
- ML19260D638 + (17:35:46, 3 January 2025)
- 05000317/LER-1980-001, Forwards LER 80-001/03L-0 + (17:35:54, 3 January 2025)
- ML19260D632 + (17:35:56, 3 January 2025)
- 05000333/LER-1980-005, Forwards LER 80-005/03L-0 + (17:36:30, 3 January 2025)
- ET 19-0019, Response to Request for Additional Information Revision to Technical Specification 3.3.5, Loss of Power (LOP) Diesel Generator (DG) Start Instrumentation + (17:36:35, 3 January 2025)
- 05000293/LER-1980-005-01, /01T-0:on 800131,measured Concentrations of Sr-90 in Milk Sample Was Greater than 10 Times Concentration in Control Station Sample.Caused by Local Meteorological Conditions.No Corrective Action Taken + (17:38:26, 3 January 2025)
- ML19260D628 + (17:38:30, 3 January 2025)
- ML19260D627 + (17:38:32, 3 January 2025)
- ML19260D622 + (17:38:38, 3 January 2025)
- ML19260D621 + (17:38:40, 3 January 2025)