Notification of Action Completion Associated with Confirmatory Order EA-17-077 - Item G.1
ML19260D632
Person / Time
Site: Millstone  Dominion icon.png
Issue date: 09/10/2019
From: Stoddard D
Dominion Energy Nuclear Connecticut
To:
NRC Region 1
References
17-4651, EA-17-077
Download: ML19260D632 (2)


Text

Dominion Energy Nuclear Connecticut, Inc 5000 D0m1rnon Boulevard, Glen Allen, VA 23060 D0mm1onEnergy com A,

j? Energy~

Dominion September 10, 2019 U.S. Nuclear Regulatory Commission Serial No. 17-4651 Regional Administrator, Region I NSSLffFO RO 2*100 Renaissance Blvd, Suite 100 Docket Nos. 50-336 King of Prussia, PA 19406-2713 50-423 License Nos. DPR-65 NPF-49 DOMINION ENERGY NUCLEAR CONNECTICUT, INC.

MILLSTONE POWER STATION UNITS 2 AND 3 NOTIFICATION OF ACTION COMPLETION ASSOCIATED WITH CONFIRMATORY ORDER EA-17-077 - ITEM G.1 On November 21, 2017, the Nuclear Regulatory Commission (NRG) issued Confirmatory Order EA-17-077 to Dominion Energy Nuclear Connecticut, Inc. (DENG).

Section V of the Confirmatory Order requires that by December 31, 2019, DENG shall discuss this issue, including the results of the evaluations conducted as required by the Order and re~ulting corrective actions, with the following industry groups: a) the Nuclear Secunty Working Group; and b) the 2019 National Nuclear Security Conference. In accordance with Item G.1, the discussion shall include reference to any identified organi~ational weaknesses that DENG determined contributed_ to the issue. Item G.1 specifies that within 30 days of completing each discussion, DENG shall inform the NRG, in writing, that the action is complete, and shall make the presentation materials available to the NRG for one year after the presentation for review during an inspection.

On August 20, 2019, DENG completed a presentation of Confirmatory Order EA-17-077 to the 2019 National Security and Emergency Preparedness Summit (previously called National Nuclear Security Conference as was stated in EA-17-077). The presentation included a discussion of the issue, the results of the evaluations performed, including organizational weaknesses that contributed to the issue, and the resulting corrective actions taken As specified in Item G.1, the presentation materials will be available to the NRG for one year after the presentation for review during an inspection.

If you have any questions concerning this matter, please contact Michael Whitlock at (804) 273-3123.

Sincerely, Daniel G. Stoddard Senior Vice President and Chief Nuclear Officer Commitments made in this letter: None

Serial No. 17-4651 Docket Nos 50-336/423 Page 2 of 2 cc: U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555-0001 Richard V. Guzman Senior Project Manager U.S. Nuclear Regulatory Commission One White Flint North, Mail Stop 08 C 2 11555 Rockville Pike Rockville, MD 20852-2738 NRC Senior Resident Inspector Millstone Power Station