IE Insp Rept 70-1151/79-16 on 791023 & 26-30 & 1102. Noncompliance Noted:Failure to Follow Written Procedure for Determining Holdup in Process Equipment.Details Withheld (Ref 10CFR2.790)
ML19260D655
Person / Time
Site: Westinghouse
Issue date: 12/13/1979
From: Bates J, Gillespie F, Steele P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML19260D639 List:
References
70-1151-79-16, NUDOCS 8002110548
Download: ML19260D655 (1)


Text

i is.,0.....

5 IZhst a no C0dTAlliS 2.7E31ETJialiM o,

UNITED STATES 8

NUCLEAR REGULATORY COMMISSION n

,E REGION 11 0,

[

101 MARIETTA ST., N.W., SUITE 3100

.....[

ATLANTA. GEORGIA 30303 DEC 141979 Report No. 70-1115/79-16 Docket No. 70-1151 License No. SNM-1107 Safeguards Group III Licensee: Westinghouse Electric Corporation Nuclear Fuel Division Drawer R Columbia, South Carolina 29205 Facility Name: Westinghouse NFD Inspection at: Columbia, South Columbia Inspection Conducted: October 23 and 26-30, and November 2, 1979 Date of Last Material Control and Accounting Inspection Visit: August 21-24, 1979 Type of Inspection: Announced Material Control & Accounting Inspectors:

c' [,[m

/4 [/>

B.

es, Chemist Date Signe

!n

/2kJ/h9 P. V. 'S e e,

h N

,t Datie Signed

/h

/1// 3f 7 Y Approved by:

j F. P. Gillsspie', Ohief, MC&A Section, Dath Signed Safeguards Branch Inspection Summary Areas Inspected:

Physical inventory procedures and follow-up on items of non-compliance and unresolved item.

The inspection involved 67 inspector-hours on site by two NRC inspectors and was begun during the regular hours.

Results: The licensee was found to be in compliance with NRC requirements in the two areas examined during the inspection except for the following two items:

1.

Deficiency - Failure to follow the written procedure for determining holdup in process equipment (79-16-01) - This is a repeat item of noncompliance.

2.

Deficiency - Failure to verify bulk volume measurement systems once each material balance period by inspection to determine damage, sediment build-up or other conditions that could cause a chang: in volume (79-16-0 ).

S-F2 '7 II Copy of Copies jj}} 1 i f_.S' F5e3 i ernig pec.cnt is n't to be MATERIAL.TP.U'!"ITTD EENWITH reprdxc3 d tt 0;cci 18 CONTAli;S 2.753 ISUTJJ.l,liDN apprevalcfIE;II gI D}}