- 05000368/LER-1979-011, Forwards LER 79-011/03L-0 + (09:46:23, 3 January 2025)
- 05000029/LER-1979-002-03, /03L-0 on 790122:following Plant Trip,Control Room Operator Found Rod 22 Failed to Drop Into Core from 87 Inches on the Scram & All Rods in Group Were Not within Plus/Minus 8 Inches.Caused by Crud Buildup After Refueling + (09:46:27, 3 January 2025)
- ML19274D948 + (09:46:29, 3 January 2025)
- 05000029/LER-1979-002, Forwards LER 79-002/03L-0 + (09:46:32, 3 January 2025)
- ML19274D945 + (09:46:35, 3 January 2025)
- ML19274D944 + (09:46:36, 3 January 2025)
- ML19274D942 + (09:46:38, 3 January 2025)
- ML19274D940 + (09:46:39, 3 January 2025)
- ML19274D939 + (09:46:41, 3 January 2025)
- ML19274D937 + (09:46:42, 3 January 2025)
- ML19274D936 + (09:46:43, 3 January 2025)
- ML19274D935 + (09:46:48, 3 January 2025)
- ML19274D934 + (09:46:49, 3 January 2025)
- ML19274D933 + (09:46:52, 3 January 2025)
- ML19274D931 + (09:46:54, 3 January 2025)
- 05000029/LER-1979-003-03, /03L-0 on 790112:during Unscheduled Shutdown,Steam Generator Chloride Concentration Exceeded 0.5 Ppm Tech Spec Limit.Caused by Steam Generators Chemical Hideout + (09:46:56, 3 January 2025)
- ML19274D929 + (09:46:58, 3 January 2025)
- 05000029/LER-1979-003, Forwards LER 79-003/03L-0 + (09:47:00, 3 January 2025)
- ML19274D926 + (09:47:03, 3 January 2025)
- ML19274D924 + (09:47:04, 3 January 2025)
- ML19274D922 + (09:47:06, 3 January 2025)
- ML19274D921 + (09:47:07, 3 January 2025)
- IR 05000333/1978017 + (09:47:11, 3 January 2025)
- ML19274D919 + (09:47:13, 3 January 2025)
- ML19274D918 + (09:47:14, 3 January 2025)
- ML19274D916 + (09:47:15, 3 January 2025)
- 05000348/LER-1979-005, /03L-0 on 790123:during Maint on Boron Injection Tank Inlet Valve Q1E21VO16B,boron Concentration Fell Below Tech Spec Requirements.Caused by Leakage Through Opened Valve During Troubleshooting Per LER 79-005/03L-0 + (09:47:18, 3 January 2025)
- 05000348/LER-1979-005-03, /03L-0 on 790123:during Surveillance Test on Boron Injection Tank Inlet Valve Q1E32V016B,valve Failed to Operate Electrically.Cause Undetermined,Since Subsequent Troubleshooting Failed to Duplicate Problem + (09:47:20, 3 January 2025)
- ML19274D913 + (09:47:22, 3 January 2025)
- IR 05000286/1978030 + (09:47:25, 3 January 2025)
- 05000348/LER-1979-004-03, /03L-0 on 790123:containment Atmosphere Particulate Radioactivity Monitoring Sys Inoperable;Filter Paper Was Not Advancing.Caused by Replacement Paper Being Thicker That That Originally Supplied + (09:47:29, 3 January 2025)
- ML19274D909 + (09:47:30, 3 January 2025)
- ML19274D908 + (09:47:34, 3 January 2025)
- ML19274D906 + (09:47:36, 3 January 2025)
- ML19274D904 + (09:47:37, 3 January 2025)
- ML19274D903 + (09:47:39, 3 January 2025)
- ML19274D902 + (09:47:40, 3 January 2025)
- ML19274D900 + (09:47:41, 3 January 2025)
- ML19274D899 + (09:47:42, 3 January 2025)
- ML19274D897 + (09:47:43, 3 January 2025)
- ML19274D896 + (09:47:44, 3 January 2025)
- IR 05000363/1978015 + (09:47:46, 3 January 2025)
- IR 05000373/1978025 + (09:47:50, 3 January 2025)
- ML19274D893 + (09:47:53, 3 January 2025)
- ML19274D892 + (09:47:55, 3 January 2025)
- ML19274D891 + (09:47:56, 3 January 2025)
- ML19274D890 + (09:47:57, 3 January 2025)
- ML19274D888 + (09:47:58, 3 January 2025)
- ML19274D886 + (09:47:59, 3 January 2025)
- ML19274D885 + (09:48:00, 3 January 2025)
- ML19274D883 + (09:48:01, 3 January 2025)