ML19274D921

From kanterella
Jump to navigation Jump to search
Supplements 790117 Verbal Rept Re Possible Deficiency in Installing Pipe Elbows Connecting Steam Generators to cross- Leg Piping.Concludes Matter Is Not Reportable,Under 10CFR50.55(e)
ML19274D921
Person / Time
Site: Comanche Peak  
Issue date: 02/20/1979
From: Gary R
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To: Seidle W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
TXX-2957, NUDOCS 7902270233
Download: ML19274D921 (1)


Text

TENAS LTILITIES GENERATING CO.ilPANY 2001 IIILY A N 111% 6..it 11 Al.I..\\s,l l-:X AM 7T 201 February 20, 1979

~

R J GARf

". '.. ' ' "" ll 11r. W. C. Seidle, Chief Reactor Con.;truction & Engineering Support Branch V. S. fluclear Regulatory Commission Office of Inspection and Enforcement 611 Ryan Plaza Dr., Suite 1000 bocket flos. 50-445 Arlington, Texas 76011 50-446 COMAriCHE PEAK STEAll ELECTRIC STATI0tl 1931-83 2300 MW IrlSTALLATI0tl ItlSTALLATIO1 0F PIPE ELB0WS Ill STEAM GE!!ERATORS LOOP PIPIflG FILE fl0.10110

Dear Mr. Seidle:

On January 17, 1979, we verbally informed your Mr. R. G. Taylor of a deficiency in regard to installation of pipe elbows connacting the steam generators to the cross-over leg piping. We submitted an interim response logged TXX-2955 that advised you that we were continuing our investigation and evaluation. We have completed our investigation and have concluded that the matter is not reportable under 10 CFR 50.55(e).

Records supporting these deter-minations are available for your Inspector's review at the CPSES site.

Very truly yours,

,f Jdy R. d. Gary /

RJG:dla cc: flRC Region IV - (0 + 1 copy)

Director, Inspection & Enforcement - (15 copies) c/o Distribution Services Branch, DDC, ADM.

U. S. lluclear Regulatory Commission Washington, D. C. 20555 7902270233