ML19274D893
| ML19274D893 | |
| Person / Time | |
|---|---|
| Site: | 05000363 |
| Issue date: | 12/13/1978 |
| From: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | |
| Shared Package | |
| ML19274D887 | List: |
| References | |
| 50-363-78-15, NUDOCS 7902270174 | |
| Download: ML19274D893 (1) | |
Text
.
APPENDIX A gggi4gp:
NOTICE OF VIOLATION Jersey Central Power and Light Company Docket No. 50-363 License No. CPPR-96 Based on the results of the NRC inspection conducted on November 13-16, 1978, it appears that one of your activities was not conducted in full compliance with conditions of your NP,C Facility License No. CPPR-96 as indicated below.
This item is an infraction.
10 CFR 50, Appendix B, Criterion V, states, in part, that:
" Activities affecting quality shall be prescribed by documented instructions, procedures, or drawings... and shall be accomplished in accordance with these instructions, drawings, and procedures..."
The licensee's Quality Assurance Plan for Forked River Nuclear Station Unit 1, states, in part, in Paragraph 12.0:
"GPUSC requires its contractors and subcontractors to establish, document, and implement a QA program for identification, calibration and control of measuring and test equipment in accordance with the applicable specifications, codes or referenced technical documents'.'
Paragraphs 11.3.3 and 11.4.4 of Morrison-Knudsen's (M-K) Procedure GEN-ll state, in part:
"Only properly identified and calibrated tools are issued for quality controlled construction, inspection and tests," and, "The calibration agency shall affix a label on each tool indicating date calibrated, due date, and facility name or logo."
Contrary to the above, on November 14, 1978, certain measuring and test equipment in use by M-K was fcond to be not properly identified or controlled.
790227o n Y