Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19289B160 + (02:37:03, 3 January 2025)
- ML19289B009 + (02:37:04, 3 January 2025)
- ML19289A965 + (02:37:06, 3 January 2025)
- PNO-III-80-067, on 800410,Region 3 Was Notified That Several Packages Had Fallen from Purolator Truck Along Route 41. Eleven Packages Containing Uci Amounts of I-125 Have Been Recovered.Number of Packages Still Missing Not Known + (02:37:09, 3 January 2025)
- PNO-I-80-052, on 800331,Region 1 Was Notified by Info Technology,Inc of Receipt of Vial Labeled Xe-133.Vial Had Been Included in Shipment from Licensee.Vial Was Shielded. Only Background Levels of Radiation Measured at Surface + (02:37:11, 3 January 2025)
- ML19289A902 + (02:37:13, 3 January 2025)
- PNO-V-80-022, on 800324,Nuclear Engineering Co,Beatty,Nv Announced Ban on Southwest Nuclear Co & San Onofre Nuclear Power Station from Use of Low Level Waste Burial Site at Beatty,Nv,Until Further Notice + (02:37:15, 3 January 2025)
- PNO-V-80-021, on 800321,Tri-State tractor-trailer Arrived at Nuclear Engineering Co Burial Site,Beatty,Nv,Carrying Spent Resin Container W/Radiation Levels in Excess of DOT Regulations + (02:37:17, 3 January 2025)
- PNO-III-80-062, on 800327 Reactor Manually Tripped When Safety Rod Group 3 Tripped & Group 4 Began Drifting Inward. Subsequent to Reactor Trip,Msiv Closed Automatically. Cause of Reactor Trip & MSIV Closure Under Investigation + (02:37:19, 3 January 2025)
- PNO-III-80-061A, update to Fire on 800326;safety Tour Revealed Welding Gas Fumes in Auxiliary Bldg & Hose on Five Fire Extinguishers in Trailer Destroyed by Fire Had Been Cut.Possibility of Sabotage Under Consideration + (02:37:22, 3 January 2025)
- PNO-III-80-061, on 800326,fire Destroyed 23 Trailers Parked side-by-side.Trailers Used to House Operations.Cause Unknown.Investigation Continues + (02:37:23, 3 January 2025)
- PNO-III-80-058, on 800321,fire Occurred in Two Trailers Used by Bechtel Personnel Designing Small Bore Piping.Damage to Design Work Limited to One Desk Area.Caused by Faulty Heating Unit Beneath Trailer.Investigation Continues + (02:37:26, 3 January 2025)
- PNO-III-80-057, on 800320,two Workers Overcome by Argon Gas. Caused by One Worker Stepping on Gas Line & Breaking It. Both Workers Hospitalized + (02:37:28, 3 January 2025)
- ML19289A886 + (02:37:29, 3 January 2025)
- PNO-III-80-055, on 800320,order Issued to Zack Corp Restraining Them from Further safety-related Heating & Ventilation Work Due to Problems Associated W/Failure of Zack Corp to Implement Certain Portions of QA Program + (02:37:31, 3 January 2025)
- PNO-II-80-046, on 800323,reactor Tripped Due to High Water Level in Vessel Caused by Overfeeding When Level Recorder Stalled at Plus 35 Inches.Reactor at Hot Standby + (02:37:33, 3 January 2025)
- PNO-I-80-049, on 800327,plant Tripped from 100% Power & ECCS & Containment Isolation Occured.Exact Cause Unknown.Appears to Have Occurred from False ECCS Actuation Signal.Plant in Hot Standby W/Decay Heat Removal in Progress + (02:37:35, 3 January 2025)
- ML19289A881 + (02:37:36, 3 January 2025)
- PNO-I-80-047, on 800326,PA Electric Co Test Engineer Fell Six Feet from Radwaste Demineralizer Into Surrounding Pit. Anti-Cs Contaminated to 1000 Dpm.Due to Nature of Injuries, Man Transported to Hosp W/O Cleanup or Anti-C Removal + (02:37:38, 3 January 2025)
- ML19289A879 + (02:37:40, 3 January 2025)
- ML19289A877 + (02:37:41, 3 January 2025)
- PMNS20191121, Notice of Meeting with Exelon Generation Company, LLC + (02:37:42, 3 January 2025)
- ML19289A834 + (02:37:42, 3 January 2025)
- ML19289A833 + (02:37:43, 3 January 2025)
- ML19289A830 + (02:37:43, 3 January 2025)
- ML19289A807 + (02:37:44, 3 January 2025)
- ML19289A805 + (02:37:49, 3 January 2025)
- ML19289A806 + (02:37:49, 3 January 2025)
- ML19289A761 + (02:37:59, 3 January 2025)
- ML19289A702 + (02:38:09, 3 January 2025)
- ML19289A701 + (02:38:16, 3 January 2025)
- ML19289A692 + (02:38:17, 3 January 2025)
- ML19289A699 + (02:38:17, 3 January 2025)
- ML19289A691 + (02:38:19, 3 January 2025)
- ML19289A615 + (02:38:22, 3 January 2025)
- ML19289A609 + (02:38:23, 3 January 2025)
- ML19289A608 + (02:38:24, 3 January 2025)
- ML19289A607 + (02:38:25, 3 January 2025)
- ML19289A605 + (02:38:27, 3 January 2025)
- ML19289A604 + (02:38:28, 3 January 2025)
- ML19289A603 + (02:38:31, 3 January 2025)
- ML19289A596 + (02:38:33, 3 January 2025)
- ML19289A594 + (02:38:34, 3 January 2025)
- ML19289A564 + (02:38:35, 3 January 2025)
- ML19289A563 + (02:38:36, 3 January 2025)
- ML19289A532 + (02:38:37, 3 January 2025)
- ML19289A525 + (02:38:37, 3 January 2025)
- ML19289A494 + (02:38:39, 3 January 2025)
- ML19289A515 + (02:38:39, 3 January 2025)
- 05000237/LER-2018-001, Cancellation: LER 2018-001-00 for Dresden Nuclear Power Station, Units 2 and 3, Non-Conformances to Design for Tornado Missile Protection + (02:38:41, 3 January 2025)
- ML19289A489 + (02:38:43, 3 January 2025)
- ML19289A486 + (02:38:44, 3 January 2025)