Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20217M505 + (13:04:26, 3 December 2024)
- ML20217M503 + (13:04:27, 3 December 2024)
- NSD-NRC-98-5675, Forwards non-proprietary Version of Rev 3 to WCAP-14846, Scaling Analysis for AP600 Containment Pressure During Design Basis Accidents + (13:04:27, 3 December 2024)
- ML20217M501 + (13:04:28, 3 December 2024)
- ML20217M500 + (13:04:28, 3 December 2024)
- ML20217M499 + (13:04:29, 3 December 2024)
- ML20217M497 + (13:04:30, 3 December 2024)
- ML20217M493 + (13:04:30, 3 December 2024)
- ML20217M492 + (13:04:31, 3 December 2024)
- ML20217M487 + (13:04:32, 3 December 2024)
- ML20217M489 + (13:04:32, 3 December 2024)
- ML20217M485 + (13:04:33, 3 December 2024)
- ML20217M483 + (13:04:33, 3 December 2024)
- ML20217M480 + (13:04:34, 3 December 2024)
- 1CAN049806, Application for Amend to License DPR-51,changing Order of Channel Rotation During Outage for Scheduling Flexibility, While Still Requiring Rotation Schedule to Be Established for Operating Cycle + (13:04:35, 3 December 2024)
- ML20217M478 + (13:04:36, 3 December 2024)
- 05000271/LER-1998-004, :on 980226,seven Day DG LCO Was Exceeded Due to Inadequate Guidance in Work Planning Procedure When Planning Work That Affects Block Walls.Grout Was Replaced & Completed on 980301 + (13:04:37, 3 December 2024)
- ML20217M476 + (13:04:38, 3 December 2024)
- ML20217M473 + (13:04:39, 3 December 2024)
- ML20217M472 + (13:04:40, 3 December 2024)
- ML20217M471 + (13:04:41, 3 December 2024)
- ML20217M466 + (13:04:42, 3 December 2024)
- ML20217M464 + (13:04:43, 3 December 2024)
- ML20217M463 + (13:04:43, 3 December 2024)
- SVP-99-181, Forwards Biennial Update to Quad Cities Ufsar,Iaw 10CFR50.71(e).Update Includes Changes to Facility & Procedures & Are Current Through 990630 + (13:04:44, 3 December 2024)
- ML20217M461 + (13:04:45, 3 December 2024)
- 05000254/LER-1998-013, :on 980131,discovered Insufficient Clearance Between Core Spray Test Return Valve & Pressure Suppression Chamber.Caused by Inattention to Detail in Original Design. Removed Pad to Restore Adequate Clearance + (13:04:47, 3 December 2024)
- ML20217M458 + (13:04:47, 3 December 2024)
- ML20217M456 + (13:04:49, 3 December 2024)
- ML20217M457 + (13:04:49, 3 December 2024)
- ML20217M454 + (13:04:50, 3 December 2024)
- ML20217M455 + (13:04:50, 3 December 2024)
- ML20217M449 + (13:04:53, 3 December 2024)
- ML20217M452 + (13:04:53, 3 December 2024)
- ML20217M445 + (13:04:54, 3 December 2024)
- ML20217M446 + (13:04:54, 3 December 2024)
- ML20217M443 + (13:04:57, 3 December 2024)
- ML20217M438 + (13:04:57, 3 December 2024)
- ML20217M436 + (13:04:58, 3 December 2024)
- 05000412/LER-1997-003, :on 970521,entry of TS 3.0.3 Occurred Due to Inoperability of Both Trains of Suppl Leak Collection & Release Sys.Caused by Failure to Recognize That Operating in Condition Is Prohibited by Ts.Reviewed Rept 971141 + (13:05:00, 3 December 2024)
- ML20217M433 + (13:05:00, 3 December 2024)
- ML20217M430 + (13:05:01, 3 December 2024)
- ML20217M432 + (13:05:01, 3 December 2024)
- ML20217M429 + (13:05:02, 3 December 2024)
- ML20217M428 + (13:05:02, 3 December 2024)
- ML20217M427 + (13:05:03, 3 December 2024)
- ML20217M425 + (13:05:06, 3 December 2024)
- 05000317/LER-1999-006, :on 990922,manual Reactor Trip Was Noted.Caused by Inadequate Electrical Current Determination.Evaluated Trip Risk Assessment Process for Enhancements.With + (13:05:08, 3 December 2024)
- ML20217M423 + (13:05:08, 3 December 2024)
- ML20217M421 + (13:05:09, 3 December 2024)
- ML20217M422 + (13:05:09, 3 December 2024)