Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20234C956 + (11:50:07, 3 December 2024)
- ML20234C951 + (11:50:08, 3 December 2024)
- ML20234C945 + (11:50:10, 3 December 2024)
- ML20234C944 + (11:50:10, 3 December 2024)
- ML20234C941 + (11:50:11, 3 December 2024)
- ML20234C938 + (11:50:12, 3 December 2024)
- ML20234C939 + (11:50:12, 3 December 2024)
- IR 05000341/1987020 + (11:50:18, 3 December 2024)
- ML20234C933 + (11:50:20, 3 December 2024)
- PNO-I-87-120, on 871226,reactor Scram Occurred from Approx 25% Power Due to Turbine Trip on Low Condenser Vacuum Caused by Crack in Condenser Pipe Penetration.Pentration Seal Weld Repaired + (11:50:20, 3 December 2024)
- ML20234C930 + (11:50:21, 3 December 2024)
- ML20234C929 + (11:50:22, 3 December 2024)
- ML20234C927 + (11:50:23, 3 December 2024)
- ML20234C925 + (11:50:24, 3 December 2024)
- ML20234C926 + (11:50:24, 3 December 2024)
- ML20234C922 + (11:50:25, 3 December 2024)
- ML20234C916 + (11:50:26, 3 December 2024)
- ML20234C921 + (11:50:26, 3 December 2024)
- ML20234C912 + (11:50:27, 3 December 2024)
- B12577, Forwards Connecticut Yankee Third 10-Yr Interval Inservice Test Pump & Valve Program Submittal & ...Inservice Insp Plan Summary Submittal, for Third 10-yr Insp Interval Commencing on 880101.Fee Paid + (11:50:28, 3 December 2024)
- ML20234C911 + (11:50:28, 3 December 2024)
- PNO-V-87-049, on 870628,reactor Manually Shutdown from 100% Power as Result of Rupture in Train a Circulating Water Loop.Preliminary Insp Revealed Split Weld Seams in Several Places.Licensee Plans to Inspect Condenser Internals + (11:50:29, 3 December 2024)
- ML20234C905 + (11:50:30, 3 December 2024)
- ML20234C903 + (11:50:30, 3 December 2024)
- ML20234C900 + (11:50:31, 3 December 2024)
- ML20234C897 + (11:50:32, 3 December 2024)
- ML20234C894 + (11:50:33, 3 December 2024)
- ML20234C895 + (11:50:33, 3 December 2024)
- ML20234C893 + (11:50:34, 3 December 2024)
- ML20234C883 + (11:50:35, 3 December 2024)
- ML20234C881 + (11:50:36, 3 December 2024)
- ML20234C878 + (11:50:37, 3 December 2024)
- ML20234C876 + (11:50:37, 3 December 2024)
- ML20234C874 + (11:50:38, 3 December 2024)
- ML20234C871 + (11:50:39, 3 December 2024)
- ML20234C872 + (11:50:39, 3 December 2024)
- ML20234C870 + (11:50:40, 3 December 2024)
- ML20234C869 + (11:50:41, 3 December 2024)
- ML20234C866 + (11:50:42, 3 December 2024)
- ML20234C865 + (11:50:42, 3 December 2024)
- IR 05000267/1987006 + (11:51:01, 3 December 2024)
- ML20234C854 + (11:51:02, 3 December 2024)
- ML20234C852 + (11:51:03, 3 December 2024)
- ML20234C850 + (11:51:03, 3 December 2024)
- PNO-I-87-058A, on 870625,licensee Completed Unscheduled Shutdown to Repair Vibration Problems on Main Turbine Generator Unit.Plant Continued to Experience Vibrations. Plant Manually Tripped from 25% Power on 870701 + (11:51:04, 3 December 2024)
- ML20234C847 + (11:51:05, 3 December 2024)
- TXX-6744, Advises That Completion Date for NCR E85-101983 Cable Rework Revised to 871001 Due to Deficiencies Noted in Cables,Per NRC Notice of Violation Item A(2) Noted in Insp Repts 50-445/86-06 & 50-446/86-04 + (11:51:06, 3 December 2024)
- ML20234C844 + (11:51:06, 3 December 2024)
- ML20234C838 + (11:51:10, 3 December 2024)
- IR 05000352/1987014 + (11:51:11, 3 December 2024)
- ML20234C834 + (11:51:12, 3 December 2024)
- ML20234C831 + (11:51:13, 3 December 2024)