Text
_ _ _ _ _ _ _ -
JUL 1- 887
.
.
In Reply Refer To:
' Docket: 50-267/87-06
Public Service Company of Colorado
ATTN: Robert 0. Williams, Jr.
Vice President, Nuclear
Operations
P. O. Bo). 840
Denver, Colorado
80201
Gentlemen:
.i
This refers to the Systematic Assessment of Licensee Performance (SALP) Board
Report of Fort St. Vrain Nuclear Generating Station. The SALP Board met on
'
June 11, 1987, to evaluate the performance of the subject facility for the
period May 7,1986, through April 30, 1987. The performance analyses and
resulting evaluations are documented in the enclosed SALP Board Report.
The performance of your facility was evaluated in the selected functional areas
i@ntified in Section IV of the enclosed SALP Board Report. Overall, we find
tha; your performance has significantly improved during this assessment period.
Five of the six areas rated low last year improved sufficiently to change the
category assigned. These five areas were maintenance, security, outages,
quality assurance and licensing. We noted that emergency preparedness, the
functional area which was previously assessed to be Category 3, also improved;
j
3
however, the fact that an emergency exercise was not conducted in the latter
part of the assessment period kept you from demonstrating fully the scope and
depth of improvements. Additionally, we noted that the improving trend in plant
operations was sustained throughout this period. We belleve that your virtually
universal improvement is the result of strong and dedicated management.
During a telephone conversation with Mr. L. Brey, of your staff, on June 29,
1987, a meeting between the Nudear Regulatory Commission staff and Public
Service Company of Colorado staff was scheduled for August 4, 1987, at the
Fort St. Vrain site to discua; the sal.P Board Report.
Comments which you may submit are not subject to the clearance procedures of the
Office of Management and Budget as required by.the Paperwork _ Reduction Act of
1980, P!.96-511.
~~
}
kd
)btW
s'
D:DRSh
RIV/PIM/
SRh
C PPB
P'M/NRR
-
B
JPJau/A
don
peitner
JCalvo
jJEGagliardo
EHJohnson
MESkow/dp
/qFarrell
g /27/87
1,p/87
b/f/87
s/\\/87
Q/ \\ /87 T[;/30/87
1/(/87
- /3
E' Js% " /
h
gh
70
7
e
,
I
L
<
.
Publit Service Company of Colorado
-2-
Should you have any questions concerning this letter, we shall be glad to
discuss them with you.
Sincerely,
Or!cinal Signed By
'
Paul S Check
Robert D. Martin
Regional Administrator
Enclosures:
1.
Appendix - NRC SALP Board Report
50-267/87-06
2.
Attachment - NRR Supplement
cc w/ enclosures:
Manager, Nuclear
Production Division
Fort St. Vrain Nuclear Generating Station
16805 WCR 19 1/2
Platteville, Colorado
80651
P. Tomlinson, Manager, Quality
Assurance Division
4
(Same Address)
Colorado Radiation Control Program Director
Colorado Public Utilities Commission
bcctoDMB(IE40)
bcc distrib. by RIV:
- RPB
R. D. Martin, RA
- RRI
DRSP
- Section Chief (RPB/A)
- RIV File
- SectionChief(RSB/ES)
- R&SPB
- RSTS Operator
- MIS System
- RSB
- Project Inspector
- D. Weiss, RM/ALF
- R. Hall
Chairman Zech
PAO, Region IV
Comm. Roberts
D. Powers, RIV
Comm. Asselstine
K. Heitner, NRR
Comm. Bernthal
RRIs (9)
Comm. Carr
Records Center, INP0
J. Taylor, D.DRO
D. Crutchfield, NRR
J. Calvo, NRR
- w/766