ML20234C922

From kanterella
Jump to navigation Jump to search
Forwards Safety Insp Rept 50-341/87-20 on 870505-0608 & Notice of Violation.Jh Taylor Forwarding Final Rept Covering Insp Performed at Plant & Technical Review Rept Encl
ML20234C922
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 06/29/1987
From: Greenman E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Sylvia B
DETROIT EDISON CO.
Shared Package
ML20234C924 List:
References
NUDOCS 8707070012
Download: ML20234C922 (2)


See also: IR 05000341/1987020

Text

- _ - ~

7

f

'

'

,

.  ?

g

r . s

k i e _

.. r

JUN 29190/

, Docket No 50-341

'The Detroit Edison Company

' ATTN: B. Ralph Sylvia

Group Vice President

Nuclear Operations

6400 North Dixie Highway

Newport, MI 48166

,

Gentlemen:

This refers to the routine safety inspection conducted by Messrs. W. G. Rogers,

M. E. Parker, D. Beckman, and W. Gunther.of this office on May 5 through June 8,

1987, of activities'at Fermi 2, authorized by Facility Operating License

No. NPF-43 and to the discussion of our findings with R. S. Lenart at the

conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures .and representative records, observations, and

interviews with personnel.

During this inspection, certain of your activities appeared to be in violation

of NRC requirements, as described in the enclosed Notice. The inspection

showed that action' had been taken to correct the identified violation and to

prevent recurrence. Our understanding of your corrective actions are

described in Paragraph 8 of tre enclosed inspection report. Consequently, no

reply to this violation is required and we have no further questions regarding

this matter at this time.

In accordance with 10 CFR 2.'790 of the Commission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the NRC

Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

LPor.iginal Fignea b7 T. E. Fomoy"

Edward G. Greenman, Deputy Director

Division of Reactor Projects

Enclosures:

1. Inspection Report

No. 50-341/87020(DRP)

2. Notice of Violation

3. Attachment 1

4. Attachment 2

og Attached Distribution \

l I RIIIg(- h, g O

l elke/mnj G

4 reenman

(hM 'l29f f? s707070012

PDR

870629 I

G ADDCK 05000341

PDR J

L J

3

- -

.i

1

,

,.

.(

l'

The Detroit Edison Company 2 JUN 25 98f

.c g . -

Distribution

cc.w/ enclosure:

~S.-R. Frost,' Licensing

P. A. Marquardt, Corporate

Lagal Depacuent

DCS/RSB (RIDS)

Licensing Fee' Management Branch

' Resident Inspector, RIII

Ronald Callen,' Michigan

'Public Service Commission-

LHarry H.;Voight, Esq.

' Michigan Department of

Public Health

Monroe County Office of

Civil Preparedness

4

!

l

i

j

i

1

.

I

i

L _.