Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20235B834 + (11:13:59, 3 December 2024)
- PNO-IV-87-048, on 870920,upper Fuel Pool Partially Drained. Caused by Attempt to Increase Water Level During Refueling. Region Dispatching Supervisor to Site to Coordinate NRC Insp of Licensee Actions.Licensee Also Conducting Indepth Review + (11:14:00, 3 December 2024)
- ML20235B832 + (11:14:01, 3 December 2024)
- IR 05000358/1973001 + (11:14:02, 3 December 2024)
- ML20235B828 + (11:14:03, 3 December 2024)
- 3F0787-01, Forwards Rev 8 to FSAR for Crystal River Unit 3,reflecting Changes to Facility Through 861231.Addl 10CFR50.59 Safety Evaluations Which Have Been Performed Since 870101 & Supplementing Those Provided in Util Also Encl + (11:14:10, 3 December 2024)
- ML20235B823 + (11:14:10, 3 December 2024)
- ML20235B821 + (11:14:11, 3 December 2024)
- ML20235B817 + (11:14:17, 3 December 2024)
- ML20235B815 + (11:14:18, 3 December 2024)
- ML20235B812 + (11:14:19, 3 December 2024)
- ML20235B810 + (11:14:19, 3 December 2024)
- ML20235B807 + (11:14:20, 3 December 2024)
- ML20235B801 + (11:14:24, 3 December 2024)
- ML20235B803 + (11:14:24, 3 December 2024)
- ML20235B800 + (11:14:25, 3 December 2024)
- ML20235B799 + (11:14:25, 3 December 2024)
- ML20235B790 + (11:14:26, 3 December 2024)
- ML20235B786 + (11:14:27, 3 December 2024)
- ML20235B785 + (11:14:28, 3 December 2024)
- ML20235B777 + (11:14:29, 3 December 2024)
- ML20235B775 + (11:14:30, 3 December 2024)
- ML20235B774 + (11:14:30, 3 December 2024)
- ML20235B773 + (11:14:33, 3 December 2024)
- ML20235B770 + (11:14:34, 3 December 2024)
- ML20235B768 + (11:14:35, 3 December 2024)
- ML20235B763 + (11:14:38, 3 December 2024)
- ML20235B764 + (11:14:38, 3 December 2024)
- RBG-26188, Suppl Response to Violations Noted in Insp Rept 50-458/86-27.Rev of Surveillance Test Procedures W/Potential Problems Have Been Completed W/Exception of Instrumentation & Control (I&C) Procedures + (11:14:39, 3 December 2024)
- ML20235B762 + (11:14:39, 3 December 2024)
- ML20235B759 + (11:14:40, 3 December 2024)
- ML20235B758 + (11:14:41, 3 December 2024)
- ML20235B757 + (11:14:48, 3 December 2024)
- TXX-2395, Deficiency Rept Re Polar Crane Support Brackets.Initially Reported 770506.Vendor Removed from Bidders List for Future Work Until QC Problems Fully Resolved + (11:14:48, 3 December 2024)
- ML20235B754 + (11:14:49, 3 December 2024)
- ML20235B752 + (11:14:57, 3 December 2024)
- ML20235B751 + (11:14:58, 3 December 2024)
- ML20235B750 + (11:14:59, 3 December 2024)
- ML20235B749 + (11:15:00, 3 December 2024)
- ML20235B748 + (11:15:01, 3 December 2024)
- ML20235B746 + (11:15:02, 3 December 2024)
- ML20235B747 + (11:15:02, 3 December 2024)
- 05000352/LER-1987-021, :on 870601,various Channel D Nuclear Steam Supply Shutoff Sys Isolations Occurred.Engineer Caused Short Circuit to Ground,Blowing Fuse Supplying Sys Isolation Circuit Logic.Fuse Replaced.Engineer Counseled + (11:15:04, 3 December 2024)
- ML20235B744 + (11:15:06, 3 December 2024)
- ML20235B743 + (11:15:07, 3 December 2024)
- ML20235B741 + (11:15:09, 3 December 2024)
- ML20235B740 + (11:15:10, 3 December 2024)
- ML20235B739 + (11:15:10, 3 December 2024)
- ML20235B738 + (11:15:12, 3 December 2024)
- ML20235B735 + (11:15:13, 3 December 2024)
- ML20235B734 + (11:15:14, 3 December 2024)
- ML20235B732 + (11:15:19, 3 December 2024)