Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- U-600943, Responds to 870422 Notice of Violation from Insp Rept 50-461/87-13.Corrective Actions:Specific Deficiency Noted Evaluated by Nuclear Station Engineering as Category C Item in Accordance W/Panel Verification Program + (10:45:26, 3 December 2024)
- ML20235F556 + (10:45:27, 3 December 2024)
- ML20235F560 + (10:45:27, 3 December 2024)
- SNRC-1351, Responds to IE Bulletin 85-03, Motor-Operated Valve Common Mode Failures Due to Improper Switch Settings. Operability Analysis Determined That Seven Valves Capable of Operating Against Revised Differential Pressures After Adjustments + (10:45:28, 3 December 2024)
- ML20235F552 + (10:45:29, 3 December 2024)
- IR 05000324/1987034 + (10:45:30, 3 December 2024)
- ML20235F549 + (10:45:30, 3 December 2024)
- ML20235F546 + (10:45:31, 3 December 2024)
- ML20235F545 + (10:45:32, 3 December 2024)
- ML20235F544 + (10:45:32, 3 December 2024)
- ML20235F543 + (10:45:33, 3 December 2024)
- ML20235F538 + (10:45:34, 3 December 2024)
- ML20235F537 + (10:45:35, 3 December 2024)
- ML20235F536 + (10:45:36, 3 December 2024)
- ML20235F532 + (10:45:37, 3 December 2024)
- ML20235F528 + (10:45:38, 3 December 2024)
- ML20235F525 + (10:45:39, 3 December 2024)
- ML20235F524 + (10:45:39, 3 December 2024)
- ML20235F520 + (10:45:40, 3 December 2024)
- 05000498/LER-1987-001, :on 870824,discovered That Both Unit Vent Radiation Monitors Lost Sample Flow & Inoperable Due to Shutdown of Sample Pumps.Caused by Personnel Error at Computer Console.Addl Personnel Training Performed + (10:45:42, 3 December 2024)
- ML20235F515 + (10:45:42, 3 December 2024)
- ML20235F514 + (10:45:43, 3 December 2024)
- ML20235F511 + (10:45:44, 3 December 2024)
- ML20235F506 + (10:45:49, 3 December 2024)
- ML20235F508 + (10:45:49, 3 December 2024)
- ML20235F501 + (10:45:51, 3 December 2024)
- ML20235F497 + (10:45:53, 3 December 2024)
- ML20235F493 + (10:45:54, 3 December 2024)
- ML20235F492 + (10:45:54, 3 December 2024)
- ML20235F490 + (10:45:55, 3 December 2024)
- PNO-III-87-093, on 870630,operators Manually Tripped Reactor Following Detection of Hydrogen in Isophase Bus Ducting. Caused by Failed Main Generator Bushing.Unit Expected to Remain in Hot Shut Down While Bushing Being Replaced + (10:45:56, 3 December 2024)
- ML20235F487 + (10:45:56, 3 December 2024)
- IR 05000320/1987009 + (10:46:01, 3 December 2024)
- ML20235F477 + (10:46:02, 3 December 2024)
- ML20235F476 + (10:46:02, 3 December 2024)
- ML20235F475 + (10:46:03, 3 December 2024)
- ML20235F469 + (10:46:04, 3 December 2024)
- ML20235F473 + (10:46:04, 3 December 2024)
- ML20235F468 + (10:46:05, 3 December 2024)
- ML20235F465 + (10:46:05, 3 December 2024)
- ML20235F464 + (10:46:06, 3 December 2024)
- IR 05000313/1987012 + (10:46:08, 3 December 2024)
- ML20235F460 + (10:46:09, 3 December 2024)
- ML20235F456 + (10:46:09, 3 December 2024)
- ML20235F452 + (10:46:10, 3 December 2024)
- ML20235F451 + (10:46:10, 3 December 2024)
- ML20235F449 + (10:46:11, 3 December 2024)
- ML20235F446 + (10:46:12, 3 December 2024)
- LD-87-053, Forwards Revised Steam Generator Tube Rupture Analysis for Fsar.Rev Incorporates Revised Analysis Using Reactor Coolant Gas Vent Sys for Depressurization Purposes + (10:46:13, 3 December 2024)
- ML20235F444 + (10:46:14, 3 December 2024)
- ML20235F442 + (10:46:14, 3 December 2024)