Forwards Listed Documents Re Allegations Made by Hl Nolan, President of Hadco & Assoc,Re Use of E-Brite 26-1 Metal in Nuclear Reactor Facilities.Vendor Insp Branch Continuing to Pursue Issue from Technical Standpoint.Will Provide Results
ML20235F552
Person / Time
Issue date: 07/07/1987
From: Partlow J
Office of Nuclear Reactor Regulation
To: Kane W, Norelius C, Reyes L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML20235F555 List:
References
REF-QA-99901063 NUDOCS 8707130436
Download: ML20235F552 (3)


Text

/

UNITED STATES

j.

'8 NUCLEAR REGULATORY COMMISSION o

p_

WASHINGTON, D. C. 20555 July 7, 1987 Docket No. 999001063 MEMORANDUM FOR:

William F. Kane, Director Division of Reactor Projects, RI Louis Reyes, Director Division of Reactor Projects, RII Charles E. Norelius, Director Division of Reactor Projects, RIII Eric H. Johnson, Director Division of Reactor Safety and Projects, RIV Dennis F. Kirsch, Director Division of Reactor Safety and Projects, RV FROM:

James G. Partlow, Director Division of Reactor Inspection and Safeguards Office of Nuclear Reactor Regulation

SUBJECT:

ALLEGATIONS REGARDING E-BRITE 26-1 METAL Pursuant to allegations made by Mr. Harold L. Nolan, President of Hadco &

Associates p(ertaining to the use of E-Brite 26-1 metal in nuclear reactor facilities ref. Enclosure 1), the following documents are enclosed to provide background information on this issue.

1.

Inspection Report No. 99901063/86-01 2.

Nolan/Merschoff letter dated December 4,1986 3.

Merschoff/Nolan letter dated April 21, 1987 4.

Nolan/Merschoff letter dated April 29, 1987 5.

Merschoff/Nolan letter dated May 19, 1987 6.

Nolan letter dated April 22, 1987 The Vendor Inspection Branch (VIB) is continuing to pursue the issue from a technical standpoint.

The Subcommittee on Properties of Metals of ASME as well as Alleghany Ludlum Steel Corporation, the current patent holder of the metal, have also been notified of these allegations. We will notify you of the results 4

of this effort.

Our technical conclusions are contained in the April 21, 1987 letter to Nolan.

Recentiv, the VIB reviewed the court records of the civil action case identified in Nola'n's April 29, 1987 letter, and our conclusions remain unchanged.

l l

l 0

i "fi 8707130436 070707 PDR GA999 ENVBOC 999001063 PDR

-.---------__----------a

[

Multiple Addressees July 7. 1987

-b If you have any questions, please contact' Ellis Merschoff (FTS 492-9644) or Jim Stone (FTS 492-9661).

(

James C. Partlow, Director Divisicln of Reactor Inspection and Safeguards Office of Nuclear Reactor Regulation

Enclosures:

As stated

(

s-July 7, 1987 DISTRIBUTION: w/o Enclosures l RIDS 9 Code clE;:09;)/ Enclosures

~

V B ~ RM'g'~ ' '

DRIS Reading JGPartlow-BKGrimes' EWMerschoff JCStone JTConway i

1 i

l (b 0

n 0FC

VIB:DRIS
SC/VIB:DRIS
BC/

IS

D

,S

DIR:DRIS

.......:.... 3. }....:.............

____________:....____g.:.

NAME ay: sam

JCStone

\\

choff

B ' i
JGPartl o' DATE' :6Yi 7
6/\\(/87
//7/87
6/f0/87
T// /87 W

gg)

.s,.

1

.l July 7, 1987 DISTRIBUTION: w/o Enclosures RIDS Code IE:09 w/ Enclosures VIB Reading DRIS Reading.

JGPartlow BKGrimes EWMerschoff

'JCStone

'JTConway 1

1 i

i l

l 1

{

/ 6x O

~

0FC

VIB:DRIS
SC/VIB:DRIS
BC/

IS

D/

S

DIR:DRIS

....:..... y.....:.........___.

. _ _ _........ : _ _ _...... p. :.

NAME ay: sam

JCStone

\\

schoff

B i
JGPartl o

.____.:..).....____..:...___.......:_'__...........

DATE :6'/f c 7

6/\\(/87
/n/87
6/l0/87
17// /87 i

D J

s

/ p v, I

1

a.

'"0 ORGANIZATION: THE BOC GROUP, INCORPORATED MURRAY HILL, NEW PROVIDENCE, NEW JERSEY REPORT' INSPECTION INSPECTION NO.: 99901063/86-01 DATES: 09/08-09/86 ON-SITE HOURS:

13 CORRESPONDENCE ADDRESS: The B0C Group, Incorporated ATTN: Mr. Frederick K. Kies Director, Technical Resources 100 Mountain Avenue i

Murray Hill, New Providence, New Jersey 07974 ORGANIZATIONAL CONTACT: Mr. Frederick K. Kies TELEPHONE NUMBER:

(201) 464-8100 NUCLEAR INDUSTRY ACTIVITY: None.

ASSIGNED INSPECTOR:

/d.T f4 J.

way, Reactive in ection Section (RIS)

Date (h.

/o.f g4 APPROVED BY:

Merschoff, Chi f, RIS, Vendor Program Branch Date g

INSPECTION BASES AND SCOPE:

1 A.

BASES:

10 CFR Part 50, AppendGx B.

B.

SCOPE: The purpose of this inspection was to review records pertaining to E-Brite 26-1 metal manufactured by Airco Vacuum Metals (currently The BOC Group) to determine if any of the material was shipped to nuclear power plants in the 1970s as was stated in an allegation.

4 PLANT SITE APPLICABILITY: Not identified.

F.

?

__.____.______._______.m

'0 ORGANIZATION: THE BOC GROUP, INCORPORATED MURRAY H1LL, NEW PROVIDENCE, NEW JERSEY REPORT INSPECTION NO.: 99901063/86-01 RESULTS:

PAGE 2 of 4 A.

VIOLATIONS:

None.

B.

NONCONFORMANCES:

None.

C.

UNRESOLVED ITEMS:

None.

D.

OTHER FINDINGS AND COMMENTS:

1.

Allegation In June 1986, the NRC RIV office was notified of an allegation contained in a June 11, 1986 letter to President Reagan in which the alleger expressed knowledge that defective material was used in nuclear power plants in the United States.

In July 1986, the alleger delivered to the NRC RIV office a " Partial Data File Regarding Defective E-Brite 26-1 Materials." The file which consisted of copies of test reports generated by or for Air Reduction Company (AIRCO) was reviewed by the NRC inspector from the Vendor Program Branch (VPB). The reports covered a time period from 1970 through 1976 when AIRC0 Vacuum Metals (AVM), a division of AIRCO, was developing the alloy designated "E-Brite 26-1."

In August 1986, the NRC inspector met with the alleger to gather information pertaining to the allegation involving E-Brite 26-1 material produced by AVM at their Berkely, California facility. The allegation is that E-Brite 26-1 is a defective material because it cannot be welded, and its ductile to brittle transition temperature cannot be controlled thus making its use in nuclear reactors extremely hazardous. The alleger believes that E-Brite 26-1 material is in a number of domestic nuclear power plants.

On August 26, 1986, the NRC inspector contacted Mr. Frederick Kies, the Director of Technical Resources for The BOC Group located in Murray Hill, New Providence, New Jersey. Mr Kies, who was involved with the development of E-Brite 26-1 at AVM, stated that The BOC Group purchased AIRCO in 1978.

In the 1970s, AVM developed a high purity ferritic stainless steel produced by the electron beam refining process and received a patent on the alloy which was called E-Brite 26-1.

At their Berkley, California facility, AVM melted and cast

0 ORGANIZATION: THE B0C GROUP, INCORPORATED MURRAY HlLL, NEW PROVIDENCE. NEW JERSEY REPORT INSFECTION NO.: 99901063/86-01 RESULTS:

PAGE 3 of 4 ingots, and the finished products (e.g., strip, tubing, forgings, etc.) were fabricated by vendors.

In 1978, AVM went out of business and sold the patent rights for E-Brite 26-1 to Allegheny Ludlemgp The records pertaining to the production of E-Brite 26-1 by AVM have been retained at The BOC Group's facility in Murray Hill, New Providence, New Jersey.

At The BOC Group's facility in New Jersey, the NRC inspector reviewed 6 Monthly Sales Reports (MSR) and customer lists relating.to E-Brite 26-1 for 1976. The MSR identified invoice no., customer, product, quantity, and price. A product summary on each MSR indicated that the products sold included strip, tube, bar, plate, pipe, fittings, fasteners, and forgings. The customer lists showed that approximately 400 companies had purchased E-Brite 26-1 material from AVM in 1976.

The names of the companies and their locations could not be identified as nuclear customers.

Approximately 2900 shipping records (1970-50, 1971-50, 1972-205, 1973-300, 1974-340, 1975-530, 1976-830, and 1977-600) for E-Brite 26-1 were reviewed. The Notice of Shipment (NS) document contained information similar to that in a Certificate of Conformance. The NS described the product including referenced standards and heat numbers; and identified the quantity, customer, invoice number, shipper, and the shipment source, date, and destination.

In 1970, all the orders reviewed were for slabs, ingots or pieces of strip which were shipped to steel companies, research companies, or engineering departments of other companies for development purposes.

The majority of the orders in 1971 reflected this same product pattern, but the product line began to expand in 1972.

None of the orders in 1970,1971, and 1972 referenced a standard or specification (i.e., only "E-Brite 26-1" was identified).

In 1973, orders began to reference " grade XM-27" under ASTM specifications (e.g., A268 for tubing and A240 for plate, sheet, and strip).

It was noted that finished items' were shipped to customers from either AVM warehouses in Leetsdale or Glenwillard, Pennsylvania, consignee's I

(e.g., R. J. Gallagher, P. A. Frasse) facilities, or directly from a fabricator's f acility. The following are typical items shipped from a fabricator's or consignee's facility on an AVM purchase order:

tubing (Damascus Tube and Teledyne), strip (Universal Cyclops and Superior Steel), plate (G.0. Carlson), fittings (Raymond Brass and Sun Weld Fitting), fasteners (Raymond Brass), forgings (Western Forge & Flange), pipe (C. A. Roberts, R. J. Gallaaher and P. A.

Frasseandbar/ rod (BlairsvilleandLatrobeStee1{.

c l

. 0 ORGANIZATION: THE B0C GROUP, INCORPORATED MURRAY HILL, NEW PROVIDENCE, NEW JERSEY REPORT INSPECTION N0.: 99901063/86-01 RESULTS:

PAGE 4 of 4 ASME Code Cases 1496 and 1505 permitted the use of E-Brite 26-1 products - sheet, strip, and plate (SA-290), bar (SA-479), and seamless and welded tube (SA-268) - in the construction of Section VIII and Section III components, respectively.

Both these code cases were approved in 1971. Of the approximate 2800 shipping records reviewed from 1972 through 1977, only 9 orders referenced code case 1496 for ASME Section VIII " Pressure Vessels" requirements.

The Section VIII orders included the following; In October 1974, plate (A-240) was sold to P. A. Frasse and shipped to Sybron Corporation in Elyria, Ohio on invoice no. 4396. Tubing was sold to P. A. Frasse and shipped to Union Carbide in Institute, West Virginia in February 1975.

In April 1975, tubing was sent to Camden Alloy Fabricators in Camden, New Jersey, and a flanged / dished head was sent to Dupont in Deepwater, New Jersey on invoice nos. 4898 and 4870, respectively.

Invoice nos. 5286 and 5295 covered bar-shipped to Lenape Forge in West Chester, Pennsylvania and forgings shipped to Allied Chemical in Geismar, Louisana, respectively, in September 1975.

i Welded tubing (A-268) was shipped on invoice no. 5680 to Union Carbide in Institute, West Virginia in December 1975.

In March 1976, a forging was delivered to Allied Chemical and forgings (SA182 and SA240) were sold to P. A. Frasse and delivered to Hampshire Chemical in Nashua, New Hampshire on invoice no. 7049 in November 1976. The 9 customers noted above cannot be identified as nuclear customers.

None of the orders referenced code case 1505 for ASME Section III

" Nuclear Power Plant Components" requirements. Based upon the review of records at The BOC Group's facility in Murray Hill, New Providence, New Jersey and discussions with Mr. Kies, it was deter-

]

mined that AVM did not supply E-Brite 26-1 material to a nuclear facility. Accordingly, the allegation pertaining to the use of E-Brite 26-1 items in a domestic nuclear power plant cannot be substantiated.

/

2.

Persons Contacted Frederick Kies, President

.-