Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20236B132 + (08:04:51, 3 December 2024)
- ML20236B128 + (08:04:52, 3 December 2024)
- ML20236B127 + (08:04:53, 3 December 2024)
- ML20236B126 + (08:04:54, 3 December 2024)
- TAC:60067 + (08:04:54, 3 December 2024)
- ML20236B125 + (08:04:56, 3 December 2024)
- ML20236B124 + (08:04:57, 3 December 2024)
- ML20236B122 + (08:04:58, 3 December 2024)
- ML20236B120 + (08:04:59, 3 December 2024)
- ML20236B119 + (08:05:00, 3 December 2024)
- 05000413/LER-1987-024, :on 870617,after Diesel Generator 1B Declared Inoperable,Unit Supervisor Failed to Verify Operability of Ac Offsite Power Source within 8-h Time Limit.Incident Reviewed W/Supervisor & Appropriate Personnel + (08:05:02, 3 December 2024)
- ML20236B117 + (08:05:03, 3 December 2024)
- ML20236B116 + (08:05:03, 3 December 2024)
- ML20236B114 + (08:05:04, 3 December 2024)
- ML20236B115 + (08:05:04, 3 December 2024)
- ML20236B113 + (08:05:05, 3 December 2024)
- BECO-87-117, Forwards Rept Briefly Describing Changes,Tests & Experiments at Plant for 860122-870121,including Description of Changes, Ref to Relevant FSAR Section,Ref to Safety Evaluations Supporting Each Change & Temporary Test Procedures + (08:05:06, 3 December 2024)
- ML20236B112 + (08:05:06, 3 December 2024)
- U-601052, Responds to NRC Re Violations Noted in Insp Rept 50-461/87-28.Corrective Actions:Four Out of Five Process Radiation Monitors Calibr,Per Revised Procedure 9910.76 & Radiation Protection Procedures Reviewed,Per Tech Specs + (08:05:07, 3 December 2024)
- AECM-89-0026, Provides Rev to Proposed Schedule for Implementing Mods to Dcrdr Program.By End of Refueling Outage 3,all But Two of Category 2 Human Engineering Discrepancies Will Be Completed + (08:05:08, 3 December 2024)
- 05000368/LER-1989-002, :on 890109,discovered That Tech Spec Required 14-day Periodic Surveillance Test for Svc Water Flow Rate to Containment Cooling Units Not Performed.Caused by Personnel Error.Personnel Counseled + (08:05:09, 3 December 2024)
- ML20236B105 + (08:05:10, 3 December 2024)
- W3P89-0047, Responds to Violation Noted in Insp Rept 50-382/88-30. Corrective Actions:Overexposed Individuals Decontaminated Per Methods Established in Health Physics Procedure HP-02-704, Personnel Decontamination + (08:05:10, 3 December 2024)
- ML20236B102 + (08:05:11, 3 December 2024)
- ML20236B099 + (08:05:12, 3 December 2024)
- ML20236B098 + (08:05:13, 3 December 2024)
- ML20236B096 + (08:05:14, 3 December 2024)
- ML20236B097 + (08:05:14, 3 December 2024)
- ML20236B094 + (08:05:15, 3 December 2024)
- ML20236B093 + (08:05:16, 3 December 2024)
- ML20236B091 + (08:05:17, 3 December 2024)
- ML20236B090 + (08:05:18, 3 December 2024)
- ML20236B089 + (08:05:18, 3 December 2024)
- ML20236B088 + (08:05:19, 3 December 2024)
- IR 05000186/1987001 + (08:05:21, 3 December 2024)
- ML20236B086 + (08:05:22, 3 December 2024)
- ML20236B084 + (08:05:23, 3 December 2024)
- ML20236B081 + (08:05:24, 3 December 2024)
- ML20236B077 + (08:05:25, 3 December 2024)
- ML20236B078 + (08:05:25, 3 December 2024)
- ML20236B076 + (08:05:26, 3 December 2024)
- ML20236B073 + (08:05:27, 3 December 2024)
- ML20236B075 + (08:05:27, 3 December 2024)
- ML20236B072 + (08:05:28, 3 December 2024)
- ML20236B070 + (08:05:29, 3 December 2024)
- ML20236B071 + (08:05:29, 3 December 2024)
- ML20236B069 + (08:05:30, 3 December 2024)
- ML20236B068 + (08:05:31, 3 December 2024)
- ML20236B067 + (08:05:31, 3 December 2024)
- ML20236B065 + (08:05:32, 3 December 2024)
- B12713, Advises That Application for Amend to License DPR-21, Revising Tech Specs to Correct Inaccuracy in Plant Design Change Implemented During Last Refueling Outage,Will Be Submitted by 871020,per 10CFR50.91 & 871016 Discussion + (08:05:33, 3 December 2024)
- ML20236B063 + (08:05:33, 3 December 2024)