Text

' October 15, 1987 -

Docket No. 50-416 DISTRIBUTION epDoc.ket;#1les J. Partlow NRC & Local PDRs- ACRS (10)

Mr.. Oliver D. Kingsley, Jr. PD22 Reading Gray File

'Vice President, Nuclear Operations S. Varga A. Notafrancesco System Energy Resources, Inc. G. Lainas P.O.'Rox 23054 D. Miller Jackson, Mississippi 39205 L. Kintner OGC-Bethesda

Dear Mr. Kingsley:

E. Jordan

SUBJECT:

GRAND GULF' NUCLEAR STATION (GGNS), UNIT 1 - DEFERRAL OF l DR/QR INSPECTIONS FOR DIVISION II EMERGENCY DIESEL GENERATOR (TAC N0. 65683)

By letter dated June 30,-1987, as supplemented August 21 and September 11, i 1987, System Energy Resources, Inc. (the licensee) requested deferral of the completion of certain inspections of the Division II emergency diesel generator (EDG) at Grand Gulf Nuclear Station, U:it 1. To address inadequacies in design, manufacture and quality assurance / quality control of EDGs manufactured by Transamerica Delaval, Inc. (TDI), the TDI Diesel Generator Owners Group reviewed plant-specific designs and prepared design review and quality revalidation (DR/QR) reports for each plant. The DR/QR report for GGNS Unit I recommended completion of baseline inspections for the Division I EDG and the Division II EDG during the initial refueling outage. At the end of the first refueling out-age, the licensee had completed all the Division I DR/QR inspections and 87%

of the Division II DR/QR inspections, having obtained NRC approval to defer completion of_ Division II inspections until the second refueling outage, scheduled for the fall of 1987. The June 30, 1987 letter requested deferral of the remainder of the Division II DR/QR inspections until the 5-year confirma- ,

. tory inspection, now scheduled for the fifth refueling outage.

The NRC staff has reviewed the licensee's submittals. The staff's safety evaluation is enclosed. Based on the considerations discussed in the safety evaluation, the staff approves the deferral of the remainder of the Division II DR/QR baseline inspections until the scheduled 5-year confirmatory inspection.

Lester L. Kintner, Project Manager Project Directorate II-2 Division of Reactor Projects-I/II

Enclosure:

As stated cc: See next page b

LA@JL.'/ PM. DII 9 D:P A tTler .LKintner:bg Hierv 10/I'5/87 10/l3 /87 10/D787

$0230324B7.1015 G ADOCK 05000416 PDR

I

, Mr. Oliver D. Kingsley, Jr.

System Energy Resources, Inc. Grand Gulf Nuclear Station (GGNS)

\ cc:

Mr. Ted H. Cloninger Vice President, Nuclear Engineering Mr. C. R. Hutchinson GGNS General Manager and Support System Energy Resources, Inc.

System Energy Resources, Inc. Post Office Rox 756 Post Office Box 23054 Port Gibson, Mississippi 39150 Jackson, Mississippi 39205 Robert B. McGehee, Esquire The Honorable William J. Guste, Jr. I Wise, Carter, Child, Steen and Caraway Attorney General P.O. Box 651 Department of Justice Jackson, Mississippi 39205 State of Louisiana Nicholas S. Reynolds, Esquire l Bishop, Liberman, Cook, Purcell Office of the Governor and Reynolds State of Mississippi 1200 17th Street, N.W. Jackson, Mississippi 39201 Washington, D. C. 20036 Attorney General Mr. Ralph T. Lally Gartin Building Manager of Quality Assurance Jackson, Mississippi 39205 Middle' South Utilities System Services, Inc.

P.O. Box 61000 Mr. Jack McMillan, Director New Orleans, Louisiana 70161 Division of Solid Waste Management Mississippi Department of Natural Mr. John G. Cesare Resources Director, Nuclear Licensing and Safety Bureau of Pollution Control System Energy Resources, Inc. Post Office Box 10385 P.O. Box 23054 Jackson, Mississippi 39209 Jackson, Mississippi 39205 Alton B. Cobb, M.D.

Mr. R. W. Jackson, Project Engineer State Health Officer Bechtel Power Corporation State Roard of Health

. 15740 Shady Grove Road P.O. Box 1700 Gaithersburg, Maryland ?0877-1454 Jackson, Mississippi 39?05 Mr. Ross C. Butcher President Senior Resident Inspector Claiborne County Board of Supervisors U.S. Nuclear Regulatory Commission Port Gibson, Mississippi 39150 Route 2, Box 399 Port Gibson, Mississippi 39150 Regional Administrator, Region II U.S. Nuclear Regulatory Commission 101 Marietta Street, N.W., Suite 7900 Atlanta, Georgia 30323 Mr. James E. Cross GGNS Site Director System Energy Resources, Inc.

P.O. Box 756 Port Gibson, Mississippi 39150

- - _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ - _