ML20236B088

From kanterella
Jump to navigation Jump to search
Notification of 890309 Mgt Meeting 89-043 W/Util in King of Prussia,Pa to Discuss Licensee Follow Up to 890304 Scram
ML20236B088
Person / Time
Site: Pilgrim
Issue date: 03/07/1989
From: Lyash J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
NUDOCS 8903200333
Download: ML20236B088 (2)


Text

_

1

~

MAR 071999 a

l' 4

U.S. NUCLEAR REGULATORY COMMISSION No.89-043 REGION.I NOTICE OF SIGNIFICANT LICENSEE MEETING Licensee:

Boston Edison Company Facility:

Pilgrim Nuclear Power Station Docket No.:

50-293 i

Time and Date:

8:00 a.m., March 9, 1989 Location:

NRC Region I, King of Prussia, Pennsylvania Division of Reactor Projects (DRP) Conference Room

Purpose:

Management Meeting to Discuss Licensee Followup to the March 4, 1989 Scram NRC Attendees:

W. Russell, Regional Administrator T. Martin, Director, Division of Reactor Safety (DRS)

S. Collins, Deputy Director, Division of Reactor Projects (DRP)

R. Blough, Acting Chief, Reactor Projects Branch No. 3, DRP J. Lyash, Acting Chief, Reactor Projects Section No. 3B, DRP C. Anderson, Chief, Plant Systems Section, DRS R. Conte, Chief, BWR Section, DRS M. Kohl, Reactor Engineer, DRP C. Warren, SRI - Pilgrim-D. Mcdonald, Project Manager, PD I-3, Office of Nuclear Reactor Regulation (NRR)

Licensee Attendees: R. Bird, Senior Vice President, Nuclear R. Anderson, Plant Manager R. Fairbank, Design Section Manager, NED R. Grazio, Regulatory Section Manager, NED L. Olivier, Acting Operations Section Manager W. Clancy, Systems Engineering Group Leader S. DiPalma, General Electric Field Representative Note: Attendance by NRC personnel at this meeting should be made known by March 8, 1989, via telephone call to A. Randy Blough, Region I, at FTS 8-346-5146 or (215) 337-5146.

l Original Sbned By l

Prepared by:

i Jeffrey J. Lyash, Acting Chief I

Reactor Projects Section No. 3B l

8903200333 890307 t0 PDR ADOCK 05000293

\\

P PDC

(

fd o

.s 3-

, -.c hk y

Meeting Notice No.89-043 2

l Distribution:

V. Stello, Jr., Executive Director for Operations J. Taylor, Deputy Executive Director for Nuclear Reactor Regulation, Regional Operations _.and Research H. Thompson, Deputy Executive Director for Materials Safety, Safeguards and Operations Support-B. Grimes, Director, Division of Reactor Inspection and Safeguards, NRR

.J. Lieberman', Director, Office of Enforcement L. Chandler, Assistant General Counsel for Enforcement

-T. Murley, Director, Office of Nuclear Reactor Regulation F. Miraglia, Associate Director for Inspection and Technical Assessment, NRR 1

S..Varga, Director, Division of Reactor Projects - I/II, NRR B. Boger, Assistant Director for Region I Reactors, NRR D. Wessman, Director, Project Directorate I-3, NRR D. Mcdonald, Project Manager, PD I-3, NRR B. Clayton, Regional' Coordinator, EDO Public Document' Room (PDR).

Local Public Document Room (LPDR) j

' Commonwealth of Massachusetts (2) l NRC Resident Inspector.

l W. Griffin, Plymouth Board of Selectmem Honorable William B. Golden, Massachusetts State Senator bec:

l

~. Regional Administrator l

Deputy Regional Administrator.

Division Directors i

Branch Chiefs I

Section Chiefs

-Public Affairs Officer J. McGrath, RI M. Miller, RI J. Gutierrez, RI D. Holody, RI I

Region I Receptionist

'DRMA Files DRP Files Bulletin Board M. J. DiDonato, DRP i

i RI:DRP RI:DRP l

JL a /mjd RBlough

/89 3/)/89 0FFICIAL RECORD COPY MEETING NOTICE NO.89-043 - 0002.0.0 03/07/89 u_________________

a