| From: | Butcher E Office of Nuclear Reactor Regulation |
| To: | Rossi C Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 8903200318 | |
| Download: ML20236B065 (3) | |
Text
My at
'u
-~
~~
~--- - -
4 $gA Q a
49l %,=
~
Q@@
~
.f
'g s
s w*
- t1EMORANDUH' FOR
- '
fCharles'E. Rossi Director:
n t
' Division of.0perational: Events' Assessment, NRR
~
FROM:-
Edward'J. Butcher, Chief; Technical Specifications Branch 1
Division of. Operational Events Assessment, NRR:
H
SUBJECT:
MINUTESLOF MEETING WITH THE LEAD.PL NT ' TASK GROUP
^
- REGARDING PROGRESS.0F WORK TO DEVELOP AND IMPLEMENT THE LEAD PLANT CONVERSIONS:TO NEW STANDARD TECHNICAL' SPECIFICATIONS.
'On: December 19, 1988, theLNRC staff met with.the Lead Plant Task Group regarding-2 progress of work to develop and imp (lement the11ead plant conversions to new;
-Standard Technical. Specifications STS).
The task group discussed Lits planning.) schedules,- and contents' of.submittals -
'for the: lead planticonversions; the location and' control of requirements relocated:
out'of technical ~ specifications;;and an estimate of the work and time required to implement the newLtechnical specifications once they are approved. They-estimate-that.the'. time'to implement'the.' approved new technical specifications will be from 6 monthsito a-year.
The staff 6ffered guidance.on documentation that should accompany license amendment:
i requests that adopt the new STS. The staff also offered its current thinking
'about how it will handle amendment requests that needito be processed while the.
l
- staff is reviewing-the new STS, about a method for implementing-surveillance l'
.testin'g: improvements ~, and about'the review process for the lead-plant conversion technical specifications.-
The: staff re-affirmed 'its position on the following two issues:' (1)Thecriteria for allowing plant specificideviations from:new STS. is described'in the minutes, '
dated June'9,-1988,-of the April 12,~1988,: meeting;between'the staff and the-NUMARC' Working Group'on Technical Specifications Improvement. -(2) The applicable content'of the new STS and license; amendment' requests that fully' adopt the'new STS-
-.is defined in.the " split report" dated May 9,/1988. 'The staff does not anticipate
~
revisiting these issues.
e
,0n...l S,igned By:
gina Edward J. Butcher i
Edward J.; Butcher,-Chief'
]?
Technical Specifications Branch Divisionfof Operational Events. Assessment, NRR J
Enclosures.
I
' Meeting Attendance DISTRIBUTION:
I[jb-Please.see attached ha p
y 3
'f/
hj sl{h TSB:
- NRR TSB:D0EA:NRR
. SB EA:NRR RM t:pmc DCFischer EJ utcler 3/2/89.
3/b/89
.3/
89
\\,
8903'200318 890306 L
s PDR ORG NRRB N'
PDC l
6 MAR 6.1989-1c(
MEETING ATTENDANCE-NAME AFFILIATION Peter Smith Southern California Edison-Dan Green Florida Power Corporation Jerry ~ Jones' Georgia Power
' John Fowler SERI-Tom Grozan Florida Power ?.ight Company /WOG 1
Les Bencini.
Westinghouse M. L. Bowling Virginia Power
~ irginia Power /WOG V
Ed Lozito.
Joe Hegner Virginia Power-Rolf 0. Widell Florida Power Corporation Joan B. Carr Florida Power Corporation /B&WOG l
Robert Roehler
. Sacramento Municipal Utility District Terry Grebel-Pacific Gas and Electric Company-Art Bivens NUMARC i
Rob Woolley General Atomics ISC/ SPEC-SERVICES i
Donald R. Hoffman TSB/BWROG' Richard Emch NRC/NRR/0TSB David.Fischer NRC/NRR/0TSB~
Mark Reinhart-NRC/NRR/0TSB j
Jim Miller NRC/NRR/0TSB Millard Wohl NRC/NRR/0TSB Kulin D. Desai NRC/NRR/0TSB i
l
-__mm_
- ..t 's-
.u.
.r-MdR 6 id,gg' fi
~
. DISTRIBUTION-OT5B R/F.
DOEA R/F GCentraDFilese PDR
.CERossi EJButcher 1
'CHBerlinger.
WDLaning l
' BXGrines-
' GClainas' GMHolahan LCShao l
1 GClainas-FJCongel BDLiaw-
- CIGrimes JWRoe' JHConran-
-JLieberman.
FJHebdon GRKlingler-OTSB Members RLEmch DCFischer FMReinhart Jerry-Jones - Georgia Power 1