Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20236K673 + (06:25:18, 3 December 2024)
- ML20236K672 + (06:25:19, 3 December 2024)
- ML20236K671 + (06:25:19, 3 December 2024)
- ML20236K670 + (06:25:20, 3 December 2024)
- ML20236K669 + (06:25:21, 3 December 2024)
- ML20236K666 + (06:25:22, 3 December 2024)
- ML20236K665 + (06:25:23, 3 December 2024)
- ML20236K664 + (06:25:23, 3 December 2024)
- ST-HL-AE-2319, Provides Addl Justification for 870303 Proposed Changes to Surveillance Period Requirement of Tech Spec 4.5.2a from 12 H to 24 H.Probability of Valve Failure Not Significantly Increased by Longer Surveillance Period + (06:25:24, 3 December 2024)
- ML20236K661 + (06:25:24, 3 December 2024)
- ML20236K657 + (06:25:25, 3 December 2024)
- ML20236K654 + (06:25:26, 3 December 2024)
- RBG-26893, Special Rept:Marker 34 Determined to Have Total Settlement of 1.03 Inches Found Outside of Tech Spec Table 3.7.10.1 Limits,Per Latest Quarterly Survey Performed in Oct 1987.No Structural Damage Occurred.Calculation G(c)-232 Revised + (06:25:26, 3 December 2024)
- ML20236K653 + (06:25:27, 3 December 2024)
- NLS8700560, Application for Amend to License DPR-46,changing Tech Specs to Revise pressure-temp Limits for Heatup & Cooldown,Normal Operation & Pressure Testing.Fee Paid + (06:25:28, 3 December 2024)
- ML20236K652 + (06:25:28, 3 December 2024)
- ML20236K650 + (06:25:29, 3 December 2024)
- ML20236K649 + (06:25:29, 3 December 2024)
- ML20236K646 + (06:25:30, 3 December 2024)
- ML20236K645 + (06:25:31, 3 December 2024)
- ML20236K644 + (06:25:31, 3 December 2024)
- U-601078, Advises That Part 21 Defect 21-87-03 Re Damaged High Pressure Core Spray Diesel Generator Exciter Leads Will Be Replaced During Dec 1987 Instead of During Fall Maint Outage Due to Schedule Constraints + (06:25:32, 3 December 2024)
- ML20236K641 + (06:25:32, 3 December 2024)
- ML20236K640 + (06:25:33, 3 December 2024)
- ML20236K638 + (06:25:34, 3 December 2024)
- ML20236K637 + (06:25:35, 3 December 2024)
- ML20236K634 + (06:25:36, 3 December 2024)
- ML20236K633 + (06:25:38, 3 December 2024)
- ML20236K632 + (06:25:39, 3 December 2024)
- ML20236K631 + (06:25:40, 3 December 2024)
- ML20236K629 + (06:25:40, 3 December 2024)
- ML20236K626 + (06:25:41, 3 December 2024)
- ML20236K625 + (06:25:42, 3 December 2024)
- ML20236K624 + (06:25:42, 3 December 2024)
- ML20236K623 + (06:25:43, 3 December 2024)
- IR 05000333/1987015 + (06:25:47, 3 December 2024)
- ML20236K618 + (06:25:48, 3 December 2024)
- ML20236K616 + (06:25:49, 3 December 2024)
- 05000354/LER-1987-005-03, :on 870624,loose Parts Monitor Printer Declared Inoperable After Routine Insp Revealed Problems W/Printer. New Printer Ordered But Not Received Before Expiration of 30-day Limiting Condition for Operation + (06:25:50, 3 December 2024)
- ML20236K611 + (06:25:51, 3 December 2024)
- ML20236K608 + (06:25:52, 3 December 2024)
- ML20236K607 + (06:25:52, 3 December 2024)
- ML20236K604 + (06:25:55, 3 December 2024)
- IR 05000483/1987033 + (06:25:55, 3 December 2024)
- ML20236K603 + (06:25:56, 3 December 2024)
- ML20236K601 + (06:25:57, 3 December 2024)
- ML20236K596 + (06:25:58, 3 December 2024)
- PLA-2922, Advises That Installation of New Meteorological Instrumentation on Primary & Backup Towers Expected for Completion W/First Semiannual Calibr in 1988,per Deviation 387-388/86-10-07.Alternate Method Complies W/Fsar + (06:25:59, 3 December 2024)
- ML20236K594 + (06:25:59, 3 December 2024)
- ML20236K592 + (06:26:00, 3 December 2024)
- ML20236K591 + (06:26:01, 3 December 2024)