Forwards Safety Insp Repts 50-277/87-17 & 50-278/87-17 on 870601-0717 & Notice of Violation.Concerns Expressed Re Operation of Plants W/Apparently Inoperable Control Room Ventilation Radiation Monitoring Sys Since Initial Startup
ML20236K673
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 07/31/1987
From: Kane W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Gallagher J
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
Shared Package
ML20236K676 List:
References
RTR-NUREG-0737, RTR-NUREG-737 NUDOCS 8708070218
Download: ML20236K673 (2)


See also: IR 05000277/1987017

Text

_ _ _ _ _ _ _ _ - _ _ _ - _ _ _ _

.__

.

F

31 JUL 1987

l

Docket Nos. 50-277/DPR-44

50-278/DPR-56

Philadelphia Electric Company

ATTN: Mr. J. W. Gallagher

Vice President

Nuclear Operations

2301 Market Street

i

Philadelphia, Pennsylvania 19101

Gentlemen:

Subject:

Combined Inspection 50-277/87-17; 50-278/87-17

4

This transmits the findings of the routine safety inspection by Mr.T. P.

Johnson and others on June 1,1987 to July 17, 1987, at the Peach Bottom

Atomic Power Station, Delta, Pennsylvania.

These findings were based on

f

observation of activities, interviews, measurements and document reviews,

and have been discussed with Messrs. D. M. Smith and G. M. Leitch of your

staff.

Based on the results of our inspection, we are concerned about the operation

of Peach Bottom Units 2 and 3 with an apparently inoperable Control

Room Ventilation Radiation Monitoring System since initial plant startup.

Your staff identified this problem and it was reported to the NRC in LER

{

2-87-08 dated July 1,1987. The details of these concerns are delineated in

i

Section 6.2.3 of the enclosed inspection report. An enforcement conference

l

will be scheduled in the NRC Region I office to further discuss these concerns.

!

At this conference you should be prepared to further discuss these concerns

j

identified in the enclosed inspection report and corrective actions taken or

i

planned.

The need for and nature of appropriate enforcement action relative

f

to the issues identified in the enclosed report will be considered after this

conference and will be the subject of separate correspondence at a later time.

In addition, it appears that one of your activities was not conducted in

full compliance with NRC requirements, as set forth in the Notice of

Violation, enclosed herewith as Appendix A.

This violation has been

l

categorized by severity level in accordance with the General Statement of

Policy and Procedure for NRC Enforcement Actions, 10 CFR Part 2, Appendix C

(Enforcement Policy 1986).

You are required to respond to this letter and

in preparing your response, you should follow the instructions in

Appendix A.

The response required by this letter and the accompanying notice are not

subject to the clearance procedures of the Office of Management and Budget as

required by the Paperwork Reduction Act of 1980, PL 96-511.

A copy of this letter and the enclosures are being placed in the NRC Public

Document Room.

I

0FFICIAL RECORD COPY

CIR PB 87-17 - 0001.0.0

8708070218 870731

j

PDR

ADOCK 05000277

'gl\\\\

G

PDR

L-_-____

. - - _ _ .

. _ _ .

i

I

..

I,

Philadelphia Electric Company

2

31 JUL 1987

Your cooperation with us is appreciated.

Sincerely,

gioiaal Signed by

William F. Kane, Director,

Division of Reactor Projects

Enclosures:

1.

Appendix A, Notice of Violation

2.

NRC Region I Combined Inspection Report No. 50-277/87-17 and

50-278/87-17

cc w/encls:

Dickinson M. Smith, Manager, Peach Bottom Atomic Power Station

,

l

John S. Kemper, Senior Vice President, Engineering and Production

l

l

W. H. Hirst, Director, Joint Generation Projects Department, Atlantic

!

Electric

!

G. Leitch, Nuclear Generation Manager

Troy B. Conner, Jr., Esquire (Without Report)

Eugene J. Bradley, Esquire, Assistant General Counsel (Without Report)

Raymond L. Hovis, Esquire (Without Report)

Thomas Magette,-Power. Plant Siting, Nuclear. Evaluations

J

W. M. Alden, Engineer in Charge, Licensing Section

I

Thomas..S. Shaw, Jr. , Vice President - Production, Delmarva Power

Doris Poulsen, Secretary of Harford County Council

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

Commonwealth of Pennsylvania

bec w/ enc 1:

]

Region I Docket Room (with concurrences)

i

Management Assistant, DRMA (w/o enc 1)

-

J. C. Linville

Section Chief, DRP

,

,

M. Shanbaky, Chief, FRPS,.DRSS

SRI, Limerick I

h

RP h (

h

Aanek

-

R

DRP

P

g,e,s

4,N

ean

, ohnson

ill4ams L4nv411e

callo

,

7/ 4/87

7/ /37

7/h3/87

\\

/ b '87

7/2.3/87

CIRPBq8-17-0001.1.0

0FFCIAL)RECORDCOPY

7/t /87

7/ /87

07/22/87

j

\\

_____-__-____-__-___-__--_a