Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML22332A420 + (09:52:02, 29 August 2025)
- ML22325A175 + (09:53:27, 29 August 2025)
- ML22290A141 + (10:06:10, 29 August 2025)
- ML22137A062 + (11:03:58, 29 August 2025)
- ENS 57837 + (11:20:02, 29 August 2025)
- ENS 57882 + (11:20:03, 29 August 2025)
- ML21301A129 + (12:26:06, 29 August 2025)
- ML21288A098 + (12:33:01, 29 August 2025)
- ML21281A149 + (12:36:45, 29 August 2025)
- ML21139A246 + (13:32:04, 29 August 2025)
- ML21057A106 + (14:11:07, 29 August 2025)
- ML21036A191 + (14:23:41, 29 August 2025)
- ML21036A190 + (14:23:42, 29 August 2025)
- ML21036A188 + (14:23:43, 29 August 2025)
- ML21019A260 + (14:34:14, 29 August 2025)
- ML20335A329 + (14:53:31, 29 August 2025)
- 05000352/LER-1997-011, :on 971025,HPCI Sys Was Rendered Inoperable Due to Closing Turbine Exhaust Line Pciv.Caused by Valve failure.HV-055-1F072 Torque Switch Setting Was Increased within Analyzed Limits + (19:23:28, 29 August 2025)
- 05000352/LER-1997-011-01, Forwards LER 97-011-01,re Condition Prohibited by TS in That There Was Not Enough Assurance That Valve Would Continue to Meet TS Required Stroke Time When Restoring Valve to Operable Status.No New Commitments Made within Ltr + (19:23:36, 29 August 2025)
- 05000423/LER-1996-021, :on 960628,components Not Included in IST Program as Result of Programmatic Deficiencies,Was Discovered.Caused by Inadequate Mgt Commitment.Existing IST Documents & Procedures Will Be Reviewed & Revised + (19:23:42, 29 August 2025)
- NUREG-1000, Forwards Safety Evaluation & Inel Rept EGG-NTA 8341, Providing Details & Basis for Concluding That Existing Intervals for on-line Functional Testing at Plant Should Result in High Reactor Trip Sys Availability.W/O Inel Rept + (20:23:46, 29 August 2025)
- 05000306/LER-1998-002, :on 980201,defect in Primary Sys Pressure Boundary Was Observed on Motor Tube Base of Part Length CRDM Housing.Caused by Flaw on G9 Part Length Crdm.Unit 2 Part Length CRDMs Have Been Removed & Replaced + (20:40:38, 29 August 2025)
- 05000306/LER-1998-002-01, Forwards LER 98-002-01,re Defect in Primary Sys Pressure Boundary Observed on Motor Tube Base of Part Length CRDM Housing.Commitments Made within Ltr,Encl + (20:41:01, 29 August 2025)
- 05000336/LER-1998-007, Forwards Corrected LER 98-007-00,documenting Event Which Occurred at Millstone Unit 2 on 980408.LER Is Being Resubmitted Due to Omission of Rept Date on Original Submittal.Commitments Made within Ltr,Encl + (20:44:32, 29 August 2025)
- ML25240B540 + (02:21:29, 30 August 2025)
- SECY-25-0075, Weekly Information Report Week Ending August 22, 2025 + (02:21:37, 30 August 2025)
- ML25240B529 + (02:21:48, 30 August 2025)
- ML25240B509 + (02:21:51, 30 August 2025)
- ML25240B508 + (02:21:53, 30 August 2025)
- ML25240B507 + (02:21:56, 30 August 2025)
- ML25240B506 + (02:21:58, 30 August 2025)
- ML25240B485 + (02:22:00, 30 August 2025)
- ML25240B466 + (02:22:33, 30 August 2025)
- ML25240B260 + (02:22:47, 30 August 2025)
- ML25240A909 + (02:22:51, 30 August 2025)
- ML25240A903 + (02:23:07, 30 August 2025)
- IR 05000277/2025301 + (02:23:21, 30 August 2025)
- ML25239B591 + (02:23:27, 30 August 2025)
- IR 05000272/2025005 + (02:23:38, 30 August 2025)
- ML25239B560 + (02:23:40, 30 August 2025)
- IR 05000277/2025005 + (02:23:43, 30 August 2025)
- IR 05000352/2025005 + (02:23:45, 30 August 2025)
- IR 05000354/2025005 + (02:23:49, 30 August 2025)
- ML25239B546 + (02:23:52, 30 August 2025)
- AEP-NRC-2025-39, Part 21 30-day Notification + (02:23:57, 30 August 2025)
- EPID:L-2025-LLA-0116 + (02:23:59, 30 August 2025)
- ML25239A037 + (02:24:00, 30 August 2025)
- ML25238A203 + (02:24:07, 30 August 2025)
- ML25238A202 + (02:24:11, 30 August 2025)