IR 05000354/2025005
| ML25239B550 | |
| Person / Time | |
|---|---|
| Site: | Hope Creek |
| Issue date: | 08/28/2025 |
| From: | Nicole Warnek Division of Operating Reactors |
| To: | Mcfeaters C Public Service Enterprise Group |
| References | |
| IR 2025005 | |
| Download: ML25239B550 (1) | |
Text
August 28, 2025
SUBJECT:
UPDATED INSPECTION PLAN FOR HOPE CREEK GENERATING
STATION (REPORT 05000354/2025005)
Dear Charles McFeaters:
The enclosed inspection plan lists the inspections scheduled through June 30, 2027, for Hope Creek Generating Station. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last 12 months of the inspection plan are tentative and may be revised. As discussed in SECY-25-0045, Recommendations for Revising the Reactor Oversight Process, dated June 5, 2025 (ML25042A278), the NRC determined that a broad, comprehensive review of the Reactor Oversight Process (ROP) is necessary to reflect improvements in industry performance and advancements in technology. The outcome of the comprehensive review and recommendations to revise the ROP baseline inspection program, when approved by the NRC Commission, will require a revision to this inspection plan. The NRC will contact you as soon as possible to discuss any revisions after the new baseline inspection program is implemented.
In addition to baseline inspections, the NRC plans to conduct Inspection Procedure 71003, Post-Approval Site Inspection for License Renewal, Phase 1 at your facility. We also plan to conduct Inspection Procedure 92702, Follow up on Corrective Actions for Violations and Deviations, in the fourth quarter of 2025, in response to a notice of violation (NOV) issued on August 21, 2025 (ML25233A017).
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Please contact me at (610) 337-6954 with any questions you have regarding this letter.
Sincerely, Nicole S. Warnek, Chief Projects Branch 3 Division of Operating Reactor Safety
Docket No. 05000354 License No. NPF-57
Enclosure:
Hope Creek Inspection Plan
cc w/encl: Distribution via ListServ NICOLE WARNEK Digitally signed by NICOLE WARNEK Date: 2025.08.28 06:45:07 -04'00'
SUNSI Review
Non-Sensitive Sensitive
Publicly Available Non-Publicly Available
OFFICE RI/DORS RI/DORS
NAME JBresson NWarnek
DATE 8/27/2025 8/27/2025
Site Inspection Activity Plan Hope Creek 07/01/2025 - 06/30/2027 Unit Start End Activity CAC Title Staff Count RP REMP 71124.07 HC
1 7/7/2025 7/7/2025 IP 71124.07 000731 Radiological Environmental Monitoring Program RP 71124.07 REMP Completion
1 7/14/2025 7/18/2025 IP 71124.07 000731 Radiological Environmental Monitoring Program PI&R Biennial Team Inspection - Hope Creek
1 8/4/2025 8/8/2025 IP 71152B 000747 Problem Identification and Resolution
8/18/2025 8/22/2025 IP 71152B 000747 Problem Identification and Resolution 2025 HC Initial Operator Licensing Exam
1 7/14/2025 7/18/2025 OV 000956 FB-OR-Onsite Validation Of Initial License Examination (OV)
8/11/2025 8/15/2025 EXAD 000500 FB-OR-Initial License Exam Administration (EXAD)
License Renewal Phase 1 - Hope Creek
1 9/29/2025 10/3/2025 IP 71003 000687 Post-Approval Site Inspection for License Renewal Inservice Inspection - Hope Creek
1 9/29/2025 10/3/2025 IP 71111.08G 000701 Inservice Inspection Activities (BWR)
RP Rad Instrumentation 71124.05 HC
1 11/10/2025 11/20/2025 IP 71124.05 000729 Radiation Monitoring Instrumentation RP PI Verification 71151 HC
1 11/17/2025 11/21/2025 IP 71151 001397 Performance Indicator Verification Sec - Access Control, Training, SPR, PI Verification - HC
1 3/9/2026 3/13/2026 IP 71130.02 000734 Access Control
3/9/2026 3/13/2026 IP 71130.07 000739 Security Training
3/9/2026 3/13/2026 IP 71130.09 001656 Security Plan Changes
3/9/2026 3/13/2026 IP 71151 001338 Performance Indicator Verification Cyber Security - Hope Creek
1 6/8/2026 6/12/2026 IP 71130.10 000741 Cybersecurity
6/22/2026 6/26/2026 IP 71130.10 000741 Cybersecurity FORCE-ON-FORCE PLANNING AND EXERCISE WEEKS - SL/HC
1 8/3/2026 8/7/2026 IP 71130.03 000735 Contingency Response - Force-On-Force Testing
8/24/2026 8/28/2026 IP 71130.03 000735 Contingency Response - Force-On-Force Testing Age Related Degradation - Hope Creek
1 8/17/2026 8/21/2026 IP 71111.21N.04 001832 Age-Related Degradation
8/31/2026 9/4/2026 IP 71111.21N.04 001832 Age-Related Degradation Prepared on 7/28/2025 2:04:51 PM 1 of 2
Site Inspection Activity Plan Material Control and Accounting - Hope Creek
1 9/14/2026 9/18/2026 IP 71130.11 000742 Material Control and Accounting (MC&A)
HC Biennial Requal Inspection
1 10/19/2026 10/23/2026 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance EP Exercise Inspection - Hope Creek
1 11/16/2026 11/20/2026 IP 71114.01 000716 Exercise Evaluation
11/16/2026 11/20/2026 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes
11/16/2026 11/20/2026 IP 71151 001397 Performance Indicator Verification RP Performance Indicator Verification 71151 - Hope Creek
1 11/23/2026 11/25/2026 IP 71151 000746 Performance Indicator Verification Sec - AA, Access Control, Equipment Testing and Maintenance, FFD, SPR, PI - SHC
1 2/1/2027 2/5/2027 IP 71130.01 000733 Access Authorization
2/1/2027 2/5/2027 IP 71130.02 000734 Access Control
2/1/2027 2/5/2027 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance
2/1/2027 2/5/2027 IP 71130.08 000740 Fitness-For-Duty Program
2/1/2027 2/5/2027 IP 71130.09 001656 Security Plan Changes
2/1/2027 2/5/2027 IP 71151 001338 Performance Indicator Verification RP 71124.08 RM Handling/Storage/Trans Hope Creek
1 3/8/2027 3/12/2027 IP 71124.08 000732 Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, & Transportation 2027 Hope Creek Initial Operator Licensing Exam
1 3/1/2027 3/5/2027 OV 000956 FB-OR-Onsite Validation Of Initial License Examination (OV)
3/22/2027 3/26/2027 EXAD 000500 FB-OR-Initial License Exam Administration (EXAD)
EP Program Inspection - Hope Creek
1 3/22/2027 3/26/2027 IP 71114.02 000717 Alert and Notification System Testing
3/22/2027 3/26/2027 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System
3/22/2027 3/26/2027 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes
3/22/2027 3/26/2027 IP 71114.05 000720 Maintenance of Emergency Preparedness
3/22/2027 3/26/2027 IP 71151 001397 Performance Indicator Verification Prepared on 7/28/2025 2:04:51 PM 2 of 2