Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000285/LER-1997-003, :on 970421,manual Reactor Trip Occurred Due to Steam Line Rupture Caused by Flow-Accelerated Corrosion. Replaced Ruptured Extraction Steam Pipe & Inspected Large Radius Carbon Steel Sweeps in Piping + (01:02:24, 25 May 2025)
- NUREG-0420, Forwards Sser 9 (NUREG-0420).W/o Encl + (01:02:39, 25 May 2025)
- NUREG-1065, Forwards Initial Review Comments on Aug 1985 Fundamental Matl Control (Fnmc) Plan,Partially Discussed in 851113 Meeting.Rev & Resubmittal,W/Greater Level of Detail,Needed Per NUREG-1065 + (01:08:35, 25 May 2025)
- ML20141H005 + (01:09:01, 25 May 2025)
- ML20141G991 + (01:09:05, 25 May 2025)
- ML20141G943 + (01:09:17, 25 May 2025)
- ML20141G921 + (01:09:25, 25 May 2025)
- ML20141G782 + (01:10:15, 25 May 2025)
- 05000341/LER-1997-012, :on 970603,voluntary Rept Re Surveillance Testing of Recirculation Sys Overspeed Stops Was Performed. Caused by Conflict Re TS SR 4.4.1.1.2.MG Set Mechanical & Electric Stops Adjusted Downward within 4.4.1.1.2 Limits + (01:11:05, 25 May 2025)
- ML20141G447 + (01:11:47, 25 May 2025)
- 05000423/LER-1997-029, :on 970417,design Basis Concern on SGTR Analysis for Main Steam Pressure Relief Bypass Valves, Determined.Caused by Failure to Recognize Design & Single Failure Requirements.Ts Change Request Submitted by 970615 + (01:11:55, 25 May 2025)
- 05000423/LER-1997-028, :on 970410,potential Loss of Net Positive Suction Head Door Recirculation Spray Sys Pumps,Identified. Caused by Inadequate Review & Process Control.Recirculation Spray Sys Restored to Compliance W/Npsh Design Basis + (01:12:11, 25 May 2025)
- TAC:M59009 + (01:13:18, 25 May 2025)
- TAC:M73979 + (01:17:00, 25 May 2025)
- ML20141F867 + (01:17:15, 25 May 2025)
- 05000423/LER-1997-017-01, Forwards LER 97-017-01,documenting an Event That Occurred at Millstone Nuclear Power Station,Unit 3 on 970206.Commitments Made within Ltr,Encl + (01:18:43, 25 May 2025)
- 05000423/LER-1996-049-01, Forwards LER 96-049-01,documenting an Event That Occurred at Mnps,Unit 3 on 961211.Commitments Made within Ltr,Encl + (01:18:58, 25 May 2025)
- ML20141F378 + (01:19:29, 25 May 2025)
- TAC:M96426 + (01:19:30, 25 May 2025)
- ML20141F228 + (01:20:10, 25 May 2025)
- ML20141F203 + (01:20:16, 25 May 2025)
- ML20141F187 + (01:20:20, 25 May 2025)
- TAC:59657 + (01:20:27, 25 May 2025)
- ML20141F156 + (01:20:30, 25 May 2025)
- ML20141F129 + (01:20:38, 25 May 2025)
- ML20141E962 + (01:21:24, 25 May 2025)
- ML20141E945 + (01:21:30, 25 May 2025)
- ML20141E837 + (01:21:57, 25 May 2025)
- ML20141E806 + (01:22:05, 25 May 2025)
- ML20141E803 + (01:22:07, 25 May 2025)
- ML20141E789 + (01:22:10, 25 May 2025)
- 05000446/LER-1997-001, :on 970415,auxiliary Feedwater Steam Admission Valve Failed to Open Due to Ruptured Diaphragm.Actuator for 2-HV-2452-2 Has Been Disassembled & Individual Components Examined + (01:23:21, 25 May 2025)
- ML20141E553 + (01:23:29, 25 May 2025)
- ML20141E500 + (01:23:44, 25 May 2025)
- A000737, Renewed NPDES Permit LA0007374,issued to Louisiana Power & Light Co + (01:23:46, 25 May 2025)
- ML20141E420 + (01:24:11, 25 May 2025)
- ML20141E369 + (01:24:24, 25 May 2025)
- ML20141E341 + (01:24:39, 25 May 2025)
- ML20141E187 + (01:25:31, 25 May 2025)
- ML20141E125 + (01:25:52, 25 May 2025)
- ML20141E104 + (01:25:58, 25 May 2025)
- 05000335/LER-1985-012, :on 851219,during Shutdown for Scheduled Refueling Outage,Visual Exams & Functional Testing Identified Failed Snubbers.Caused by Installation/Maint Errors.Snubbers Replaced + (01:26:18, 25 May 2025)
- ML20141D909 + (01:26:54, 25 May 2025)
- ML20141D771 + (01:27:44, 25 May 2025)
- TAC:M95010 + (01:28:58, 25 May 2025)
- ML20141D478 + (01:29:03, 25 May 2025)
- IR 05000387/1996008 + (01:29:33, 25 May 2025)
- ML20141D038 + (01:30:53, 25 May 2025)
- ML20141C942 + (01:31:32, 25 May 2025)
- TAC:M92251 + (01:32:01, 25 May 2025)
- 05000254/LER-1986-006, :on 860122,reactor Bldg Ventilation Sys Isolation Occurred as Result of Spurious Trip of Reactor Bldg Ventilation Monitor 1B.Caused When Disconnected Signal Cable Resulted in Spike + (01:32:13, 25 May 2025)