| Site: | Peach Bottom |
| Issue date: | 04/11/1986 |
| From: | Ebneter S NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Daltroff S PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| References | |
| CAL-86-07, CAL-86-7, NUDOCS 8604220478 | |
| Download: ML20141F156 (2) | |
See also: IR 05000277/1986008
Text
_
.
t
'/
t
APR 111986
.
Docket Nos. 50-277'
50-278
CAL No.
86-07
Philadelphia Electric Company
ATTN:
Mr. S. L. Daltroff
,
1
Vice Prasident
Electric Production
2301 Market Street
Philadelphia, Pennsylvania 19101
Gentlemen:
Based on the results of Inspection 50-277/86-08 and 50-278/86-08 at the
Peach Bottom Nuclear Station, we note that certain aspects of your fire
protection program remain to be completed to fully confirm 10 CFR 50.48 and,
specifically, Appendix R,Section III G and J.
This matter was discussed
during a telephone conversation between Dr. Johnston of my staff and Mr. Logue
of your staff on t.pril 7,1986.
With regard to the matters discussed, we understand that you have undertaken
or will undertake and complete the following actions:
1.
Complete the Appendix R Safe Shutdown confirmatory program on or before
September 30, 1986.
2.
Upon completion of the program, provide the Office of Nuclear Reactor
Regulation and Region I, a copy of the Fire Protection Evaluation Report
(FPER) which will contain the results of the subject study.
3.
Promptly inform dP9ivn i by telephone, followed by a written report,
whenever a violation of Appendix R, III G or J requiremer'ts has been
identified during implementation of the confirmatory prog,am.
4.
Complete the Alternative Shutdown modifications for Unit 2,.
and common
modifications for Units 2 and 3 in order that both are operational before
restart from the next refueling outage.
If our understanding of your planned acti.ons described above is not in accor-
dance with your actual plans and actions being implemented, please notify me or
Dr. W. Johnston, Deputy Director of Reactor Safety by telephone within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />
of your receipt of this letter.
The responses directed by this letter are not subject to the clearance proce-
dures of the Office of Management and Budget as required by the Paperwork
Reduction Act of 1980, PL 96-511.
OFFICIAL RECORD COPY
ANDERSON 4/2/86 - 0001.0.0
04/02/86
""
8604220478 860411
\\
ADOCK 05000277
3
0
G
t b i
\\-
..
.
_ _ - _ - _ - _
_ _-___ _
__-_______ _.
_ _ _ _ -
_
.
Philadelphia Electric Company
2
Your cooperation with us in this matter is appreciated.
Sincerely, Jg By
Guya/
h 5 J.orr
Y-
S*ewart D. Ebnet , Director
Division of Reactor Safety
cc:
H. R. Denton, NRR
J. M. Taylor, IE
J. H. Sniezek, EDO
R. S. Fleischmann, Manager (Receives All 2.790 Information)
John S. Kemper, Vice President, Engineering and Research
Troy B. Conner, Jr. , Esquire
W. H. Hirst, Director, Joint Generation Projects Department, Atlantic Electric
Eugene J. Bradley, Esquire, Assistant General Counsel (Without Report)
Raymond L. Hovis, Esquire
Thomas Magette, Power Plant Siting, Nuclear Evaluations (Without Report)
W. M. Alden, Engineer in Charge, Licensing Section
Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
Commonwealth of Pennsylvania
bec:
Region I Docket Room (with concurrences)
Management Assistant, DRMA (w/o enc 1)
Section Chief, DRP
R. Starostecki
S. Collins
R. Gallo
J. Durr
D. Holody
J. Gutierrez
J. Allan
T. Murley
C. Anderson
)
'/
}l
RI:DRS
R :DRS RI:DRS
RI:ES
. RP
I)
I:RA
Anderson /cg1 Durr
Eb eter Holody
GMuierrez
%I
of
+/m g,
Gallo
c/;g,,
927
00
v/=
ki Murle
/o
RkkdRSY
Johnston
dys s
'
. . .
- . . -
0FFIC4AL RECORD COPY
ANDERSON 4/2/86 - 0001.1.0
04/09/86
.