Insp Rept 50-424/86-15 on 860128-31.Violation Noted:Pullman Power Products Drawing Controls Inadequate
ML20141F129
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 04/07/1986
From: Belisle G, Moore L, Wright R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20141F092 List:
References
50-424-86-15, NUDOCS 8604220471
Download: ML20141F129 (4)


See also: IR 05000424/1986015

Text

.,

n Etto

UNITED STATES

a

. .

s

./

'o

NUCLEAR REGULATOaY COMMISSION

'

.['

,$

REGION 11

j

Ij

101 MARIETTA STREET.N.W.

t

ATLANTA. GEORGI A 30323

\\,%.* /

-

Report No.: 50-4'24/86-15

Licensee: Georgia Power Company

P. O. Box 4545

Atlanta,~GA 30302

Docket No.: 50-424

License No.:

CPPD.-108

Facil.ity Name:

Vogtle 1-

Inspection Conducted: January 28-31, 1986

Inspectors:

[ _

, / er~ I-

d[7 /N

R. W. Wright "

.

Date Signed

I

bn-

dl,!%

,,

-s

-

L. R. Moore ~

/

Date Signed

,

!

[$ b

' #7/6

Approved by:

e

G. A. Belisle, Acting Section Chief

Date Signed

Division of Reactor Safety

SUMMARY

Scope: .This routine special announced inspection involved 54 ' inspector-hours on

site.in the areas of Readiness Review Appendix D, Document Control.

Results:

One violati.m was identified - Inadequate Pullman Power Products

drawing control corrE.ctive action.

'

8604220471 860411

PDR

ADOCK 05000424

G

PDR

,_

.

.

REPORT DETAILS

1.

Persons Contacted

Licensee Employees

  • C. Belflower, Quality Assurance (QA) Site Manager, Operations

L. Blocker, Mechanical Engineering Section Supervisor

J. Boddie, Site Document Supervisor

  • R. Conway, Senior Vice President Nuclear Power
  • D. Foster, Vice President and General Manager Vogtle Project
  • M. Googe, Project Contruction Manager
  • S. Haltom, QA Engineering Support Supervisor
  • B.' Harbin, Quality Control (QC) Manager
  • N. Harris, Assistant Manager, QC
  • C. Hayes, Votgle QA Manager

R. Johnson, Operations Records Supervisor

  • R. McManus, Assistant Project Construction Manager II

L. Mikulecky, Construct Engineer, Readiness Review

Team Member - Module 4

R. Powell, Construction Records Supervisor

Other licensee employees contacted included engineers, technicians, QA/QC

personnel and office personnel.

Other Organizations

  • A. Nakashima, Bechtel Power Corporation (BPC), Readiness Review,

Discipline Manager (Appendices)

T. Pacifico Pullman Power Products (PPP), Engineering Manager

  • W. Ramsey, Southern Company Services (SCS), Readiness Review, Project

Manager

K. Weiss, PPP, Chief Field Engineer

NRC Resident Inspector

  • H. Livermore
  • Attended exit interview

2.

Exit Interview

The inspection scope and findings were summarized on January 31, 1986, with

those persons indicated in paragraph 1 above.

The inspector described the

areas inspected and discussed in detail the inspection findings listed

below. No dissenting comments were received from the licensee.

Violation, Inadequate Pullman Power Products drawing controls

corrective action, paragraph 4.

-

--

-

_______________

_ _ . .

.

'

1

f

2

(

The licensee did not identify as proprietary any of the material provided to

(

or reviewed by the inspector during this inspection.

3.

Licensee Action on Previous Enforcement Matters

This subject was not addressed in the inspection.

4.

Readiness Review Implementation

a.

General Information

The complete details concerning the NRCs evaluation of Appendix D,

l

Document Control, for the Vogtle Readiness Review Program can be found

l

in Region II's Inspection Report No. 50-424/85-61.

'

The purpose of this report is to document and further define a

violation that was identified by the NRC inspectors during the above

Appendix D readiness review evaluation.

b.

Inspection of Document Control Audit Personnel (DCAP) Activities

The inspectors examined Georgia Power Company (GPC) DCAP findings

concerning their audits of controlled drawings, procedures, and

specifications assigned to the following site contractor organizations

during 1983 - 1985, where applicable.

PPP - Piping System Fabrications and Installation

Williams Contracting Inc. - Coatings Application

Walsh Construction Company - General Contractor (Civil)

Pullman /Kenith-Fortson - HVAC Installation

Ingalls Iron Works Co. - Miscellaneous and Structural Steel

Fabrication and Installation

'

Three of the five contractors listed were predominately rated (highly)

acceptable by GPC DCAP during this period.

One contractor was

generally rated unacceptable between April 1983 and April 1984, but

effective corrective action was evident in that this contractor has

been rated acceptable-to-distinguished since.

PPP drawing controls

were generally rated unacceptable between March 1983 and August 1985 by

GPCs acceptance criteria.

GPCs Instruction DC-DT1-A-01, R3 specifies

that a drawing error rate above 5% is unacceptable.

Although

appropriate levels ' of management were informed and corrective actions

were implemented throughout the period, generally consistent

unacceptable error rates continued.

A meeting was conducted on site

January 29, 1986, between NRC inspectors and knowledgeable,

responsible, licensee and PPP personnel to discuss this issue. The NRC

inspectors concluded by discussion, review of the contractors

.

.

..

_____ - __.

--

.

.

3

i

procedures, and the various in-process checks conducted that the

possibility of using outdated drawings for installation of PPP

hardware was very slight.

The inspectors determined that the licensee

should not depend on other programmatic checks and balances to catch

errors in the PPP document control program.

Each portion of the-QA

program i.e., proper distribution and posting of controlled drawings

and changes thereto has to meet acceptable standards.

Consequently the ' licensee was subsequently notified by telephone on

February 7, 1986, that this failure to take effective corrective action

to preclude repetition is identified as a violation (424/86-15-01).

Inadequate-PPP Drawing Control Corrective Action.

  1. -

1

i

.

b.