Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20154G864 + (16:31:15, 24 May 2025)
- TAC:62929 + (16:31:26, 24 May 2025)
- TAC:00090 + (16:31:44, 24 May 2025)
- NUREG-0837, Discusses Data Suggesting That Factors Other than Operation of & Releases from Facility Affecting Results of Environ Monitoring Program Re Resin Release in June 1982.Higher Dose Readings & 1982 Release Coincidental.Related Info Encl + (16:32:24, 24 May 2025)
- 05000266/LER-1998-003-01, Forwards LER 98-003-01 Re Discovery That Flow Rates Were Outside Design Basis of Plant.Rept Revises Corrective Action Commitment Re Replacement of SW Piping to Unit 2 Fan Cooler Motor Heat Exchangers + (16:32:36, 24 May 2025)
- ML20154G534 + (16:32:44, 24 May 2025)
- ML20154G472 + (16:32:59, 24 May 2025)
- ML20154G401 + (16:33:13, 24 May 2025)
- ML20154G298 + (16:33:37, 24 May 2025)
- ML20154G267 + (16:33:45, 24 May 2025)
- 05000382/LER-1997-032-01, Forwards LER 97-032-01,re Details of Noncompliance with Plant TS Due to Failure to Meet GDC 54,per 10CFR50.73 (a)(2)(i)(B) + (16:33:54, 24 May 2025)
- ML20154F991 + (16:34:55, 24 May 2025)
- ML20154F934 + (16:35:07, 24 May 2025)
- ML20154F887 + (16:35:18, 24 May 2025)
- ML20154F853 + (16:35:27, 24 May 2025)
- IR 05000010/1998016 + (16:36:39, 24 May 2025)
- ML20154F599 + (16:36:51, 24 May 2025)
- ML20154F497 + (16:37:16, 24 May 2025)
- 05000293/LER-1998-021, :on 980902,inadequate Fuel Supply for EDGs Was Noted.Root Cause Analysis Is Being Performed.Revised Calculation Control Process to Ensure Consistency with FSAR + (16:37:33, 24 May 2025)
- 05000341/LER-1998-007, :on 980908,inadvertent Deenergization of Safety Buses During Performance of Surveillance Testing Resulted in ESF Actuations.Caused by Faulty Static Underfrequency Relay. Relay Was Removed & Benched Tested + (16:37:50, 24 May 2025)
- ML20154F355 + (16:37:54, 24 May 2025)
- ML20154F206 + (16:38:43, 24 May 2025)
- ML20154F193 + (16:38:46, 24 May 2025)
- ML20154E943 + (16:39:58, 24 May 2025)
- TAC:62187 + (16:40:26, 24 May 2025)
- ML20154E489 + (16:42:02, 24 May 2025)
- ML20154E281 + (16:43:03, 24 May 2025)
- IR 05000293/1981037 + (16:45:22, 24 May 2025)
- ML20154D893 + (16:45:39, 24 May 2025)
- ML20154D704 + (16:46:27, 24 May 2025)
- TAC:66753 + (16:46:33, 24 May 2025)
- TAC:56126 + (16:46:37, 24 May 2025)
- ML20154D632 + (16:46:44, 24 May 2025)
- ML20154D573 + (16:46:57, 24 May 2025)
- L-98-194, Forwards Special Rept on Overview of BVPS-1 & BVPS-2 TS Compliance Issues & Corrective Actions Taken, as Committed on 980520.Rept Is Broad Summary Description of Action Taken + (16:47:15, 24 May 2025)
- ML20154D292 + (16:48:22, 24 May 2025)
- ML20154D253 + (16:48:32, 24 May 2025)
- 05000362/LER-1998-012, :on 870302,noted That CCW Relief Valve Was Inoperable.Caused by Wrong Set Spring Being Installed Due to Vendor Data Error.Spring Was Replaced & Tested & Subsequently Personnel Set Lift Pressure at 150 Psig + (16:49:53, 24 May 2025)
- ML20154D100 + (16:49:59, 24 May 2025)
- ML20154D071 + (16:50:05, 24 May 2025)
- ML20154C940 + (16:50:35, 24 May 2025)
- ML20154C897 + (16:50:48, 24 May 2025)
- ML20154C880 + (16:50:51, 24 May 2025)
- ML20154C788 + (16:51:28, 24 May 2025)
- ML20154C707 + (16:52:15, 24 May 2025)
- L-98-189, Forwards Response to NRC 980806 RAI Re Proposed Transfer of Warehouse Quality Control Insp Responsibilities to Nuclear Procurement Dept + (16:52:19, 24 May 2025)
- ML20154C656 + (16:52:30, 24 May 2025)
- L-98-185, Application for Amend to License NPF-73,eliminating Potential for non-conservative Interpretation of TS 3.1.2.8 Values for RWST & Bat Min Contained Volume & Eliminating Need for Plant Administrative Controls + (16:52:33, 24 May 2025)
- 05000461/LER-1998-032, :on 980929,noted That Excessive Voltage Drop in Control Circuit for Division 3 Diesel Output Circuit Breaker Could Result in Plant Being Outside Design Basis.Caused by Inadequate Design.Prepared Design Change of Control Circuit + (16:52:38, 24 May 2025)
- ML20154C616 + (16:52:43, 24 May 2025)
- ML20154C563 + (16:53:25, 24 May 2025)