Category:INSPECTION REPORT
MONTHYEARIR 05000327/20240042025-01-28028 January 2025 Integrated Inspection Report 05000327/2024004 and 05000328/2024004 IR 05000327/20240902025-01-27027 January 2025 Final ASP Analysis Sequoyah 1 and 2, Failure of EDG 1B During Testing IR 05000327 2024 090 Precursor IR 05000327/20240102024-12-19019 December 2024 Design Basis Assurance Inspection (Programs) Inspection Report 05000327/2024010 and 05000328/2024010 IR 05000327/20240032024-11-0606 November 2024 Integrated Inspection Report 05000327/2024003 and 05000328/2024003 IR 05000327/20250102024-10-29029 October 2024 Notification of Sequoyah, Units 1 and 2 - Comprehensive Engineering Team Inspection - U.S. Nuclear Regulatory Commission Inspection Report 05000327/2025010 and 05000328/2025010 IR 05000327/20240052024-08-26026 August 2024 Updated Inspection Plan for Sequoyah Nuclear Plant, Units 1 and 2 - Report 05000327/2024005 and 05000328/2024005 IR 05000327/20240022024-07-31031 July 2024 Integrated Inspection Report 05000327/2024002 and 05000328/2024002 ML24145A0852024-05-30030 May 2024 1B-B Diesel Generator Failure - Final Significance Determination Letter IR 05000327/20240012024-04-17017 April 2024 Integrated Inspection Report 05000327/2024001 and 05000328/2024001 ML24066A1972024-03-19019 March 2024 NRC Inspection Report 05000327-2024090 and 05000328-2024090 and Preliminary Greater than Green Finding and Apparent Violation IR 05000327/20244012024-03-12012 March 2024 – Security Baseline Inspection Report 05000327/2024401 and 05000328/2024401 IR 05000259/20230062024-02-28028 February 2024 Annual Assessment Letter for Sequoyah Nuclear Plant, Units 1, 2 - Report 05000259/2023006, 05000260/2023006 and 05000296/2023006 IR 05000327/20230042024-02-12012 February 2024 Integrated Inspection Report 05000327/2023004 and 05000328/2023004 and Apparent Violation IR 05000327/20234422024-01-11011 January 2024 95001 Supplemental Inspection Report 05000327/2023442 and 05000328/2023442 and Follow-Up Assessment Letter IR 05000327/20234202023-11-28028 November 2023 Security Baseline Inspection Report 05000327/2023420 and 05000328/2023420 IR 05000327/20230032023-11-0303 November 2023 – Integrated Inspection Report 05000327/2023003 and 05000328/2023003 IR 05000327/20230112023-10-16016 October 2023 Triennial Fire Protection Inspection Report 05000327/2023011 and 05000328/2023011 IR 05000327/20234032023-09-14014 September 2023 Cyber Security Inspection Report 05000327/2023403 and 05000328/2023403 (Cover Letter) IR 05000327/20230052023-08-29029 August 2023 Updated Inspection Plan for Sequoyah Nuclear Plant, Units 1 and 2 - Report 05000327/2023005 and 05000328/2023005 IR 05000327/20230022023-07-31031 July 2023 Integrated Inspection Report 05000327/2023002 and 05000328/2023002 IR 05000327/20230102023-07-20020 July 2023 – Biennial Problem Identification and Resolution Inspection Report 05000327/2023010 and 05000328/2023010 ML23163A0392023-06-13013 June 2023 – Notification of an NRC Fire Protection Team Inspection (FPTI) (NRC Inspection Report 05000327/2023011, 05000328/2023011) and Request for Information (RFI) IR 05000327/20233012023-05-15015 May 2023 – NRC Operator License Examination Report 05000327/2023301 and 05000328/2023301 IR 05000327/20230012023-05-0202 May 2023 Integrated Inspection Report 05000327/2023001 and 05000328/2023001 and Exercise of Enforcement Discretion IR 05000327/20234412023-04-20020 April 2023 Final Significance Determination for a Security-Related Greater than Green Finding, Nov & Assessment Followup Letter, 05000327/2023441 & 05000328/2023441 IR 05000327/20234022023-04-13013 April 2023 Security Baseline Inspection Report 05000327/2023402 and 05000328/2023402 IR 05000327/20220062023-03-0101 March 2023 Annual Assessment Letter for Sequoyah Nuclear Plant, Units 1 and 2 Report 05000327/2022006 and 05000328/2022006 IR 05000327/20234402023-02-13013 February 2023 – NRC Inspection Report 05000327/2023440 and 05000328/2023440; Preliminary Greater than Green and Apparent Violation Cover Letter IR 05000327/20220042023-02-10010 February 2023 Integrated Inspection Report 05000327/2022004 and 05000328/2022004 IR 05000327/20234012023-02-0606 February 2023 – Security Baseline Inspection Report 05000327/2023401 and 05000328/2023401 IR 05000327/20224402023-01-17017 January 2023 – Special Inspection Report 05000327/2022440 and 05000328/2022440 and Apparent Violation - Cover IR 05000327/20220032022-11-0707 November 2022 – Integrated Inspection Report 05000327/2022003 and 05000328/2022003 IR 05000327/20224012022-10-18018 October 2022 Material Control and Accounting Program Inspection Report 05000327/2022401 and 05000328/2022401 IR 05000327/20220052022-08-30030 August 2022 Updated Inspection Plan for Sequoyah Nuclear Plant, Units 1 and 2 - Report 05000327 2022005 and 05000328 2022005 - Final IR 05000327/20220022022-08-0101 August 2022 Integrated Inspection Report 05000327 2022002 and 05000328 2022002 IR 05000327/20223012022-07-21021 July 2022 Operator License Examination Report 05000327/2022301 and 05000328/2022301 IR 05000327/20220012022-05-11011 May 2022 Integrated Inspection Report 05000327/2022001, 05000328/2022001 and 07200034/2010002 IR 05000327/20220102022-04-25025 April 2022 Design Basis Assurance Inspection (Teams) Inspection Report 05000327/2022010 and 05000328/2022010 IR 05000327/20224022022-03-28028 March 2022 Security Baseline Inspection Report 05000327/2022402 and 05000328/2022402 IR 05000327/20210062022-03-0202 March 2022 Annual Assessment Letter for Sequoyah Nuclear Plant, Units 1 and 2 - (Report No. 05000327/2021006 and 05000328/2021006) IR 05000327/20210042022-02-0707 February 2022 Integrated Inspection Report 05000327/2021004 and 05000328/2021004 IR 05000327/20210032021-11-10010 November 2021 Integrated Inspection Report 05000327/2021003 and 05000328/2021003 and Apparent Violation and Exercise of Enforcement Discretion IR 05000327/20210052021-08-18018 August 2021 Updated Inspection Plan for Sequoyah Nuclear Plant, Units 1 and 2 Report 05000327/2021005 and 05000328/2021005 IR 05000327/20210022021-07-27027 July 2021 Integrated Inspection Report 05000327/2021002 and 05000328/2021002 IR 05000327/20210112021-07-19019 July 2021 Biennial Problem Identification and Resolution Inspection Report 05000327/2021011 and 05000328/2021011 IR 05000327/20210012021-04-27027 April 2021 Integrated Inspection Report 05000327/2021001 and 05000328/2021001 IR 05000327/20210102021-04-21021 April 2021 NRC Inspection Report 05000327/2021010 and 05000328/2021010 IR 05000327/20214012021-04-21021 April 2021 NRC Inspection Report 05000327/2021401 and 05000328/2021401 (U) IR 05000327/20200062021-03-0303 March 2021 Annual Assessment Letter for Sequoyah Nuclear Plant, Units 1 and 2 - Report 05000327/2020006 and 05000328/2020006 IR 05000327/20200042021-01-29029 January 2021 Integrated Inspection Report 05000327/2020004 and 05000328/2020004 2025-01-28
[Table view] Category:NRC-GENERATED
MONTHYEARIR 05000327/19990051999-09-27027 September 1999 Insp Repts 50-327/99-05 & 50-328/99-05 on 990718-0828. Violations Noted.Major Areas Inspected:Mitigating Sys IR 05000327/19990041999-08-13013 August 1999 Insp Repts 50-327/99-04 & 50-328/99-04 on 990601-0717.One Potentially Safety Significant Issue Noted.Major Areas Inspected:Licensee Emergency Preparedness IR 05000327/19990031999-06-30030 June 1999 Insp Repts 50-327/99-03 & 50-328/99-03 on 990328-0531.Non- Cited Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint & Engineering IR 05000327/19990021999-04-23023 April 1999 Insp Repts 50-327/99-02 & 50-328/99-02 on 990214-0327.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint & Engineering IR 05000327/19990011999-03-15015 March 1999 Insp Repts 50-327/99-01 & 50-328/99-01 on 990103-0213. Violations Noted & Being Treated as non-cited Violations. Major Areas Inspected:Aspects of Licensee Operations,Maint & Engineering IR 05000327/19980111999-02-0101 February 1999 Insp Repts 50-327/98-11 & 50-328/98-11 on 981122-990102. Violations Noted.Major Areas Inspected:Licensee Operations, Maint & Engineering IR 05000327/19980101998-12-0707 December 1998 Insp Repts 50-327/98-10 & 50-328/98-10 on 981011-1121.No Violations Noted.Major Areas Inspected:Operations,Maint & Engineering IR 05000327/19980141998-12-0404 December 1998 Insp Repts 50-327/98-14 & 50-328/98-14 on 981102-06.No Violations Noted.Major Areas Inspected:Observation & Evaluation of Biennial Emergency Preparedness Exercise for Sequoyah Nuclear Plan IR 05000327/19980131998-11-24024 November 1998 Insp Repts 50-327/98-13 & 50-328/98-13 on 980914-1016. Violations Noted.Major Areas Inspected:Aspects of Licensee maint,testing,engineering,self-assessment & Problem Evaluations of Licensee Ice Condenser Sys IR 05000327/19980091998-11-0909 November 1998 Insp Repts 50-327/98-09 & 50-328/98-09 on 980830-1010. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering Plant Support & Effectiveness of Licensee Controls in Identifying,Resolving & Preventing Problems IR 05000327/19980081998-09-18018 September 1998 Insp Repts 50-327/98-08 & 50-328/98-08 on 980719-0829.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support,Licensee Conducted Radiological Emergency Plan Drill IR 05000327/19980071998-08-0404 August 1998 Insp Repts 50-327/98-07 & 50-328/98-07 on 980607-0718. Violations Noted.Major Areas Inspected:Aspects of Licensee Operation,Maint,Engineering,Plant Support & Effectiveness of Licensee Controls in Identifying & Preventing Problems IR 05000327/19980061998-06-26026 June 1998 Insp Repts 50-327/98-06 & 50-328/98-06 on 980426-0606. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000327/19980051998-06-12012 June 1998 Insp Repts 50-327/98-05 & 50-328/98-05 on 980504-08.No Violations Noted.Major Areas Inspected:Maint Procedure.Insp Team Comprised Region II & Headquarters Personnel.Switchgear & Surrounding Areas Found in Good Matl Condition IR 05000327/19980031998-04-10010 April 1998 Insp Repts 50-327/98-03 & 50-328/98-03 on 980201-0314. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000327/19980011998-03-30030 March 1998 Insp Repts 50-327/98-01 & 50-328/98-01 on 980126-0213.No Violations Noted.Major Areas Inspected:Operations,Maint & Engineering IR 05000327/19980021998-03-0505 March 1998 Insp Repts 50-327/98-02 & 50-328/98-02 on 980202-06.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations & Maint.Review of Initial & Requalification Training Programs Were Also Conducted IR 05000327/19970181998-02-19019 February 1998 Insp Repts 50-327/97-18 & 50-328/97-18 on 971221-980131. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering,Plant Support & Effectiveness of Licensee Controls in Identifying & Resolving Problems IR 05000327/19970171998-01-16016 January 1998 Insp Repts 50-327/97-17 & 50-328/97-17 on 971109-1220.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering,Plant Support & Effectiveness of Licensee Controls in Identifying,Resolving & Preventing Problems IR 05000327/19970141997-12-0808 December 1997 Insp Repts 50-327/97-14 & 50-328/97-14 on 970928-1108.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering,Plant Support,Effectiveness of License Controls in Identifying,Resolving & Preventing Problems IR 05000327/19970161997-12-0505 December 1997 Insp Repts 50-327/97-16 & 50-328/97-16 on 971103-06.No Violations Noted.Major Areas Inspected:Evaluation of 971017 Wire Damage Event at Electrical Penetration 22 IR 05000327/19970121997-10-24024 October 1997 Insp Repts 50-327/97-12 & 50-328/97-12 on 970824-0927.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support & Operator Requalification Program IR 05000327/19970151997-10-23023 October 1997 Insp Repts 50-327/97-15 & 50-328/97-15 on 970922-29.No Violations Noted.Major Areas Inspected:Emergency Preparedness ML20198H7911997-09-11011 September 1997 Insp Repts 50-327/97-13 & 50-328/97-13 on 970725-0904. Violations Noted.Major Areas Inspected:Insp Scope,Event Synopsis & Observations & Findings IR 05000327/19970061997-07-28028 July 1997 Insp Repts 50-327/97-06 & 50-328/97-06 on 970525-0705. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000327/19970071997-07-24024 July 1997 Insp Repts 50-327/97-07 & 50-328/97-07 on 970623-27. Violations Noted.Major Areas Inspected:Aspects of Licensee Plant Support ML20141G0441997-06-20020 June 1997 Insp Repts 50-327/97-04 & 50-328/97-04 on 970413-0524. Violations Noted.Major Areas Inspected:Operations Re Physics Testing,Maint,Engineering & Plant Support ML20148F9631997-05-27027 May 1997 Special Insp Repts 50-327/97-05 & 50-328/97-05 on 970324-0522.Violations Noted.Major Areas Inspected:Events Associated W/Unit 1 Inadvertent RCS Drain Down on 970324 ML20141C9881997-05-12012 May 1997 Insp Repts 50-327/97-03 & 50-328/97-03 on 970302-0412. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000327/19970021997-03-24024 March 1997 Insp Repts 50-327/97-02 & 50-328/97-02 on 970203-14.No Violations Noted.Major Areas Inspected:Detailed Reviews of Corrective Actions 14-1,14-2,14-3,15 & 16 ML20137F7081997-03-18018 March 1997 Insp Repts 50-327/97-01 & 50-328/97-01 on 970119-0301. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering,Plant Support & Effectiveness of Licensee Controls in Identifying & Preventing Problems IR 05000327/19960171997-02-14014 February 1997 Insp Repts 50-327/96-17 & 50-328/96-17 on 961208-970118.No Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering,Plant Support & Plant Status ML20134G1851997-01-13013 January 1997 Insp Repts 50-327/96-16 & 50-328/96-16 on 960923-1219. Violations Noted.Major Areas Inspected:Review of Corrective Actions Implemented for Problem Evaluation Repts IR 05000327/19960141996-12-31031 December 1996 Insp Repts 50-327/96-14 & 50-328/96-14 on 961027-1207.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000327/19960151996-12-23023 December 1996 Insp Repts 50-327/96-15 & 50-328/96-15 on 961104-08.No Violations Noted.Major Areas Inspected:Control Room Simulator,Tsc,Osc,Cecc & Joint Info Ctr of Biennial Emergency Preparedness Exercise ML20134Q1721996-11-25025 November 1996 Insp Repts 50-327/96-13 & 50-328/96-13 on 960919-1102. Violations Noted.Major Areas Inspected:Events Associated W/Reactor Shutdown & Subsequent Manual Tripping of Unit 2 on 961011 IR 05000327/19960111996-11-19019 November 1996 Insp Repts 50-327/96-11 & 50-328/96-11 on 960915-1026. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering,Plant Support, & Effectiveness of Licensee Controls in Identifying,Resolving & Preventing Problems ML20129A2141996-10-10010 October 1996 Insp Repts 50-327/96-09 & 50-328/96-09 on 960728-0914. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20128H8021996-09-27027 September 1996 Insp Repts 50-327/96-10 & 50-328/96-10 on 960708,10-12 & 0819-22.Non Cited Violations Noted.Major Areas Inspected: Plant FP Program & Action Taken of Insp Findings Previously Identified IR 05000328/20060151995-06-15015 June 1995 Insp Repts 50-387/95-08 & 50-388/95-08 on 950328-0615. Violations Noted.Major Areas Inspected:Plant Operations, Maint & Surveillance,Engineering & Plant Support.Initiatives Selected for Insp Plant Mgt Walkdowns IR 05000327/19940091994-05-0202 May 1994 Resident Insp Repts 50-327/94-09 & 50-328/94-09 on 940306- 0402.Violations Noted.Major Areas Inspected:Plant Operations,Plant Maint,Plant Surveillance,Evaluation of Licensee self-assessment Capability & LER Closeout IR 05000327/19940111994-04-29029 April 1994 Partially Withheld Insp Repts 50-327/94-11 & 50-328/94-11 on 940328-0401,per 10CFR73.21.No Violations Identified.Major Areas Inspected:Physical Security Program for Power Reactors,Alarm Stations,Assessment Aids & Testing & Maint IR 05000327/19930521993-12-23023 December 1993 Insp Repts 50-327/93-52 & 50-328/93-52 on 931107-1204. Violations Noted.Major Areas Inspected:Plant Operations, Maint,Plant Surveillance,Evaluation of Licensee self-assessment Capability & LER Closeout IR 05000327/19930371993-12-17017 December 1993 Insp Repts 50-327/93-37 & 50-328/93-37 on 931115-19. Violations Noted.Major Areas Inspected:Operator Requalification Program,Exam Development & Administration & Training Staff Qualifications & Training IR 05000327/19930531993-12-17017 December 1993 Insp Repts 50-327/93-53 & 50-328/93-53 on 931115-19.No Violations Noted.Major Areas Inspected:Meteorological Monitoring,Control Room Emergency Ventilation,Audits & Secondary Water Chemistry IR 05000327/19930511993-12-13013 December 1993 Partially Withheld Insp Repts 50-327/93-51 & 50-328/93-51 on 931115-19 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected:Mgt Support,Security Program Plans & Implementing Procedures & Security Program Audit IR 05000327/19930501993-11-24024 November 1993 Insp Repts 50-327/93-50 & 50-328/93-50 on 931011-1106. Violations Noted.Major Areas Inspected:Plant Operations, Plant Maintenance,Plant Surveillance,Evaluation of Licensee self-assessment Capability & LER Closeout IR 05000327/19930421993-11-0909 November 1993 Insp Repts 50-327/93-42 & 50-328/93-42 on 930904-1010. Violations Noted.Major Areas Inspected:Plant Operations, Maint & Surveillance,Evaluation of Licensee self-assessment Capability & Licensee Event Rept Closeout IR 05000327/19930481993-11-0909 November 1993 Insp Repts 50-327/93-48 & 50-328/93-48 on 931006-08. Violation Noted.Major Areas Inspected:Qualifications of Acting Lab Supervisor,Use of Expired Stds in Alcohol breath-analysis Equipment & Testing Lab Procedures IR 05000327/19930491993-11-0202 November 1993 Insp Repts 50-327/93-49 & 50-328/93-49 on 930929-1004.No Violations Noted.Major Areas Inspected:Civil/Structural Items Which Will Remain Open After Restart 1999-09-27
[Table view] Category:INSPECTION REPORT
MONTHYEARIR 05000327/20240042025-01-28028 January 2025 Integrated Inspection Report 05000327/2024004 and 05000328/2024004 IR 05000327/20240902025-01-27027 January 2025 Final ASP Analysis Sequoyah 1 and 2, Failure of EDG 1B During Testing IR 05000327 2024 090 Precursor IR 05000327/20240102024-12-19019 December 2024 Design Basis Assurance Inspection (Programs) Inspection Report 05000327/2024010 and 05000328/2024010 IR 05000327/20240032024-11-0606 November 2024 Integrated Inspection Report 05000327/2024003 and 05000328/2024003 IR 05000327/20250102024-10-29029 October 2024 Notification of Sequoyah, Units 1 and 2 - Comprehensive Engineering Team Inspection - U.S. Nuclear Regulatory Commission Inspection Report 05000327/2025010 and 05000328/2025010 IR 05000327/20240052024-08-26026 August 2024 Updated Inspection Plan for Sequoyah Nuclear Plant, Units 1 and 2 - Report 05000327/2024005 and 05000328/2024005 IR 05000327/20240022024-07-31031 July 2024 Integrated Inspection Report 05000327/2024002 and 05000328/2024002 ML24145A0852024-05-30030 May 2024 1B-B Diesel Generator Failure - Final Significance Determination Letter IR 05000327/20240012024-04-17017 April 2024 Integrated Inspection Report 05000327/2024001 and 05000328/2024001 ML24066A1972024-03-19019 March 2024 NRC Inspection Report 05000327-2024090 and 05000328-2024090 and Preliminary Greater than Green Finding and Apparent Violation IR 05000327/20244012024-03-12012 March 2024 – Security Baseline Inspection Report 05000327/2024401 and 05000328/2024401 IR 05000259/20230062024-02-28028 February 2024 Annual Assessment Letter for Sequoyah Nuclear Plant, Units 1, 2 - Report 05000259/2023006, 05000260/2023006 and 05000296/2023006 IR 05000327/20230042024-02-12012 February 2024 Integrated Inspection Report 05000327/2023004 and 05000328/2023004 and Apparent Violation IR 05000327/20234422024-01-11011 January 2024 95001 Supplemental Inspection Report 05000327/2023442 and 05000328/2023442 and Follow-Up Assessment Letter IR 05000327/20234202023-11-28028 November 2023 Security Baseline Inspection Report 05000327/2023420 and 05000328/2023420 IR 05000327/20230032023-11-0303 November 2023 – Integrated Inspection Report 05000327/2023003 and 05000328/2023003 IR 05000327/20230112023-10-16016 October 2023 Triennial Fire Protection Inspection Report 05000327/2023011 and 05000328/2023011 IR 05000327/20234032023-09-14014 September 2023 Cyber Security Inspection Report 05000327/2023403 and 05000328/2023403 (Cover Letter) IR 05000327/20230052023-08-29029 August 2023 Updated Inspection Plan for Sequoyah Nuclear Plant, Units 1 and 2 - Report 05000327/2023005 and 05000328/2023005 IR 05000327/20230022023-07-31031 July 2023 Integrated Inspection Report 05000327/2023002 and 05000328/2023002 IR 05000327/20230102023-07-20020 July 2023 – Biennial Problem Identification and Resolution Inspection Report 05000327/2023010 and 05000328/2023010 ML23163A0392023-06-13013 June 2023 – Notification of an NRC Fire Protection Team Inspection (FPTI) (NRC Inspection Report 05000327/2023011, 05000328/2023011) and Request for Information (RFI) IR 05000327/20233012023-05-15015 May 2023 – NRC Operator License Examination Report 05000327/2023301 and 05000328/2023301 IR 05000327/20230012023-05-0202 May 2023 Integrated Inspection Report 05000327/2023001 and 05000328/2023001 and Exercise of Enforcement Discretion IR 05000327/20234412023-04-20020 April 2023 Final Significance Determination for a Security-Related Greater than Green Finding, Nov & Assessment Followup Letter, 05000327/2023441 & 05000328/2023441 IR 05000327/20234022023-04-13013 April 2023 Security Baseline Inspection Report 05000327/2023402 and 05000328/2023402 IR 05000327/20220062023-03-0101 March 2023 Annual Assessment Letter for Sequoyah Nuclear Plant, Units 1 and 2 Report 05000327/2022006 and 05000328/2022006 IR 05000327/20234402023-02-13013 February 2023 – NRC Inspection Report 05000327/2023440 and 05000328/2023440; Preliminary Greater than Green and Apparent Violation Cover Letter IR 05000327/20220042023-02-10010 February 2023 Integrated Inspection Report 05000327/2022004 and 05000328/2022004 IR 05000327/20234012023-02-0606 February 2023 – Security Baseline Inspection Report 05000327/2023401 and 05000328/2023401 IR 05000327/20224402023-01-17017 January 2023 – Special Inspection Report 05000327/2022440 and 05000328/2022440 and Apparent Violation - Cover IR 05000327/20220032022-11-0707 November 2022 – Integrated Inspection Report 05000327/2022003 and 05000328/2022003 IR 05000327/20224012022-10-18018 October 2022 Material Control and Accounting Program Inspection Report 05000327/2022401 and 05000328/2022401 IR 05000327/20220052022-08-30030 August 2022 Updated Inspection Plan for Sequoyah Nuclear Plant, Units 1 and 2 - Report 05000327 2022005 and 05000328 2022005 - Final IR 05000327/20220022022-08-0101 August 2022 Integrated Inspection Report 05000327 2022002 and 05000328 2022002 IR 05000327/20223012022-07-21021 July 2022 Operator License Examination Report 05000327/2022301 and 05000328/2022301 IR 05000327/20220012022-05-11011 May 2022 Integrated Inspection Report 05000327/2022001, 05000328/2022001 and 07200034/2010002 IR 05000327/20220102022-04-25025 April 2022 Design Basis Assurance Inspection (Teams) Inspection Report 05000327/2022010 and 05000328/2022010 IR 05000327/20224022022-03-28028 March 2022 Security Baseline Inspection Report 05000327/2022402 and 05000328/2022402 IR 05000327/20210062022-03-0202 March 2022 Annual Assessment Letter for Sequoyah Nuclear Plant, Units 1 and 2 - (Report No. 05000327/2021006 and 05000328/2021006) IR 05000327/20210042022-02-0707 February 2022 Integrated Inspection Report 05000327/2021004 and 05000328/2021004 IR 05000327/20210032021-11-10010 November 2021 Integrated Inspection Report 05000327/2021003 and 05000328/2021003 and Apparent Violation and Exercise of Enforcement Discretion IR 05000327/20210052021-08-18018 August 2021 Updated Inspection Plan for Sequoyah Nuclear Plant, Units 1 and 2 Report 05000327/2021005 and 05000328/2021005 IR 05000327/20210022021-07-27027 July 2021 Integrated Inspection Report 05000327/2021002 and 05000328/2021002 IR 05000327/20210112021-07-19019 July 2021 Biennial Problem Identification and Resolution Inspection Report 05000327/2021011 and 05000328/2021011 IR 05000327/20210012021-04-27027 April 2021 Integrated Inspection Report 05000327/2021001 and 05000328/2021001 IR 05000327/20210102021-04-21021 April 2021 NRC Inspection Report 05000327/2021010 and 05000328/2021010 IR 05000327/20214012021-04-21021 April 2021 NRC Inspection Report 05000327/2021401 and 05000328/2021401 (U) IR 05000327/20200062021-03-0303 March 2021 Annual Assessment Letter for Sequoyah Nuclear Plant, Units 1 and 2 - Report 05000327/2020006 and 05000328/2020006 IR 05000327/20200042021-01-29029 January 2021 Integrated Inspection Report 05000327/2020004 and 05000328/2020004 2025-01-28
[Table view] Category:UTILITY
MONTHYEARIR 05000327/19900341990-11-16016 November 1990 Insp Repts 50-327/90-34 & 50-328/90-34 on 901006-1105.One Violation & One Apparent Violation Noted.Major Areas Inspected:Operational Safety Verification Including Control Room Observations & Sys Lineups IR 05000327/19900361990-11-0909 November 1990 Augmented Insp Team Repts 50-327/90-36 & 50-328/90-36 on 901011-19.Insp Included Review of Events That Led to Discovery of Multiple Failures of Main Steam Check Valves on 901008 IR 05000327/19900321990-11-0101 November 1990 Insp Repts 50-327/90-32 & 50-328/90-32 on 900906-1005. Violations Noted.Major Areas Inspected:Operational Safety Verification,Including Control Room Observations,Operations Performance,Sys Lineups & Radiation Protection IR 05000327/19900331990-10-31031 October 1990 Insp Repts 50-327/90-33 & 50-328/90-33 on 901009-12.No Violations or Deviations Identified.Major Areas Inspected: Emergency Preparedness Program:Emergency Detection & Classification,Protective Action decision-making IR 05000327/19900291990-10-0505 October 1990 Insp Repts 50-327/90-29 & 50-328/90-29 on 900827-31. Violation Noted.Major Areas Inspected:Measurement of Incore Power Distributions,Calibr of Nuclear Instruments, Measurement of Thermal Power & Followup of LERs IR 05000327/19900311990-09-26026 September 1990 Insp Repts 50-327/90-31 & 50-328/90-31 on 900910-14.No Violations or Deviations Noted.Major Areas Inspected: Occupational Exposure During Extended Outages & Licensee Actions to Correct Previously Identified Weaknesses IR 05000327/19900261990-08-30030 August 1990 Insp Repts 50-327/90-26 & 50-328/90-26 on 900706-0805. Violations Noted But Not Cited.Major Areas Inspected:Control Room Observations,Operations Performance,Sys Lineups, Radiation Protection & Safeguards ML20059H0431990-08-21021 August 1990 Insp Repts 50-327/90-23 & 50-328/90-23 on 900625-29.No Violations or Deviations Noted.Weaknesses in Program Implementation Noted.Major Areas Inspected:Plant Program to Maintain Occupational Dose to Workers ALARA IR 05000327/19900211990-07-31031 July 1990 Insp Repts 50-327/90-21 & 50-328/90-21 on 900709-13.No Violations or Deviations Noted.Major Areas Inspected: Observation & Evaluation of Annual Emergency Response Exercise IR 05000327/19900201990-06-29029 June 1990 Insp Repts 50-327/90-20 & 50-328/90-20 on 900506-0605.No Violations or Deviations Noted.Major Areas Inspected: Operational Safety Verification,Including Control Room Observations,Operations Performance & Sys Lineups IR 05000327/19900191990-05-21021 May 1990 Insp Repts 50-327/90-19 & 50-328/90-19 on 900423-27.No Violations or Deviations Noted.Major Areas Inspected: Radiation Protection Activities,Including Review of Licensee Organization & Mgt Controls & Training IR 05000327/19900131990-05-21021 May 1990 Insp Repts 50-327/90-13 & 50-328/90-13 on 900423-27.No Violations or Deviations Noted.Major Areas Inspected: Emergency Facilities,Equipment,Instrumentation,Supplies, Organization & Mgt Control & Independent Review/Audits ML20043A5271990-05-16016 May 1990 Insp Repts 50-327/90-17 & 50-328/90-17 on 900406-0505. Violations Noted.Major Areas Inspected:Control Room Observations,Sys Lineups,Radiation Protection,Safeguards, Surveillance Testing & Followup to Generic Ltr 88-17 IR 05000327/19900141990-05-0303 May 1990 Insp Repts 50-327/90-14 & 50-328/90-14 on 900326-30 & 0409-13.Violations Noted.Major Areas Inspected:Inservice Testing,Containment Integrity & Followup on Previous Insp Findings IR 05000327/19900111990-04-25025 April 1990 Insp Repts 50-327/90-11 & 50-328/90-11 on 900306-0405. Violations Noted.Major Areas Inspected:Control Room Observations,Operations Performance,Sys Lineups,Radiation Protection,Safeguards & Housekeeping Insps ML20034C4651990-04-25025 April 1990 Partially Withheld Insp Repts 50-327/90-15 & 50-328/90-15 on 900326-30 (Ref 10CFR2.790 & 73.21).Violations Noted.Major Areas Inspected:Physical Security Program Including, Inspector Reviewed Barriers & Detection Aids IR 05000327/19900161990-04-12012 April 1990 Partially Withheld Insp Repts 50-327/90-16 & 50-328/90-16 on 900326-30.No Violations or Deviations Noted.Major Areas Inspected:Review of Procedures,Records,Operations & Physical Inventory,Control & Accountability of SNM IR 05000327/19900121990-04-10010 April 1990 Insp Repts 50-327/90-12 & 50-328/90-12 on 900326-30.No Violations or Deviations Noted.Major Areas Inspected: Inservice Insp (Isi),Including Review of NDE Procedures,Isi Plan for Outage & Observations of in Progress NDE Exams IR 05000327/19900081990-04-0404 April 1990 Insp Repts 50-327/90-08 & 50-328/90-08 on 900226-0302.No Violations Noted.Several Examples of Corrective Action Procedure Ambiguities Noted.Major Areas Inspected: Operational Events & Employee Concerns Program IR 05000327/19900071990-04-0303 April 1990 Insp Repts 50-327/90-07 & 50-328/90-07 on 900226-0302.No Violations or Deviations Noted.Major Areas Inspected: Radiological Effluents & Waste Treatment,Radiological Environ Monitoring & Primary & Secondary Water Chemistry IR 05000327/19900031990-03-14014 March 1990 Insp Repts 50-327/90-03 & 50-328/90-03 on 900105-0205.No Violations Noted.Major Areas Inspected:Operational Safety Verification,Maint Observations,Surveillance Testing Observations,Review of Insp Findings & Followup of Events IR 05000327/19900021990-03-0909 March 1990 Insp Repts 50-327/90-02 & 50-328/90-02 on 900122-26. Violations Noted.Major Areas Inspected:Design Changes & Mods,Procurement & Licensee Action on Previously Identified Findings ML20033F3361990-02-22022 February 1990 Partially Withheld Insp Repts 50-327/90-05 & 50-328/90-05 on 900130-0202.Violations Noted.Major Areas Inspected: Routine,Unannounced Insp of Licensee Physical Security Program of Power Reactors Including,Plans,Audits & Maint IR 05000327/19900041990-02-14014 February 1990 Insp Repts 50-327/90-04 & 50-328/90-04 on 900122-26.No Violations Noted.Major Areas Inspected:Radiation Protection Program & pre-outage Activities for Radiation Protection Program.Licensee Identified Violation Cited IR 05000327/19890291990-01-31031 January 1990 Insp Repts 50-327/89-29 & 50-328/89-29 on 891205-900109. Violations Noted.Major Areas Inspected:Operational Safety Verification,Including Control Room Observations,Safeguards, Radiation Protection & Sys Lineups IR 05000327/19890281990-01-26026 January 1990 Insp Repts 50-327/89-28 & 50-328/89-28 on 891113-17. Violation Noted Re Failure to Source Check Effluent Gas Monitors Per Tech Specs.Major Areas Inspected:Radiological Effluents & Waste Treatment,Water Chemistry & QA IR 05000327/19890271990-01-0202 January 1990 Insp Repts 50-327/89-27 & 50-328/89-27 on 891106-1205. Violations Noted.Major Areas Inspected:Operational Safety Verification,Including Control Room Observations,Operations Performance,Sys Lineups,Radiation Protection & Safeguards IR 05000327/19890251989-12-0505 December 1989 Insp Repts 50-327/89-25 & 50-328/89-25 on 891006-1108. Violations Noted.Major Areas Inspected:Operational Safety Verification Including Control Room Observations,Operations Performance,Sys Lineups,Radiation Protection & Safeguards IR 05000327/19890261989-11-0909 November 1989 Insp Repts 50-327/89-26 & 50-328/89-26 on 891023-27.No Violations or Deviations Noted.Major Areas Inspected: Allegation Followup to Establish Validity & to Verify Corrective Actions Implemented for Invalid Allegations IR 05000327/19890231989-11-0808 November 1989 Insp Repts 50-327/89-23 & 50-328/89-23 on 891002-06.No Violations or Deviations Noted.Major Areas Inspected:Fire Prevention/Fire Protection IR 05000327/19890221989-11-0707 November 1989 Insp Repts 50-327/89-22 & 50-328/89-22 on 890906-1005.No Violations or Deviations Noted.Major Areas Inspected: Operational Safety Verification Including Control Room Observations,Operations Performance & Sys Lineups IR 05000327/19890241989-10-25025 October 1989 Insp Repts 50-327/89-24 & 50-328/89-24 on 890927-29.No Violations Noted.Major Areas Inspected:Radiation Protection Program,Followup on Previous Inspector Identified Items & Employee Safety Concerns IR 05000327/19890201989-08-29029 August 1989 Insp Repts 50-327/89-20 & 50-328/89-20 on 890717-20.No Violations or Deviations Noted.Major Areas Inspected:Annual Emergency Exercise,Including Staffing & Response of Emergency Organizations in Control Room & Support Ctrs IR 05000327/19890141989-08-28028 August 1989 Insp Repts 50-327/89-14 & 50-328/89-14 on 890424-28. Violations Noted.Major Areas Inspected:Surveillance & Operational Records & Procedures.Discussions Held W/ Operations,Engineering & Transmissions Personnel IR 05000327/19890191989-08-25025 August 1989 Insp Repts 50-327/89-19 & 50-328/89-19 on 890706-0805. Violations Noted.Major Areas Inspected:Operational Safety Verification,Including Control Room Observations,Operations Performance,Sys Lineups & Radiation Protection ML20245L3191989-08-0101 August 1989 Insp Repts 50-327/89-11 & 50-328/89-11 on 890626-30. Violations Noted.Major Areas Inspected:Radiation Protection Program,Follow Up on Previous Inspector Identified Items & IE Info Notices IR 05000327/19890171989-07-28028 July 1989 Partially Withheld Safeguards Insp Repts 50-327/89-17 & 50-328/89-17 on 890522-26 (Ref 10CFR2.790(d) & 73.21)). Violations Noted.Major Areas Inspected:Physical Security Program for Power Reactors & Protected Area Alarms ML20246B6511989-06-26026 June 1989 Insp Repts 50-327/89-15 & 50-328/89-15 on 890506-0605. Violations Noted.Major Areas Inspected:Operational Safety Verification,Operations Performance,Sys Lineups,Radiation Protection,Safeguards & Housekeeping Insps ML20245D4191989-06-14014 June 1989 Insp Repts 50-327/89-16 & 50-328/89-16 on 890508-12. Violation Noted.Major Areas Inspected:Review of Completed Unit 2,Cycle 4 Initial Criticality & Post Refueling Start Up Tests & Evaluation of Thermal Power Measurements for Unit 1 IR 05000327/19890121989-05-24024 May 1989 Insp Repts 50-327/89-12 & 50-328/89-12 on 890406-0505. Violation Noted.Major Areas Inspected:Radiation Protection, Safeguards & Operational Safety Verification,Including Control Room Observations & Operational Performance IR 05000327/19890131989-05-16016 May 1989 Insp Repts 50-327/89-13 & 50-328/89-13 on 890417-21.No Violations or Deviations Noted.Major Areas Inspected: Emergency Preparedness,Including Review of Programmatic Elements & Radiological Emergency Plan & Training IR 05000327/19890101989-05-0404 May 1989 Insp Repts 50-327/89-10 & 50-328/89-10 on 890316-20.No Violations or Deviations Noted.Major Areas Inspected: Containment Integrated Leak Rate Testing,Review of Test Procedures & Evaluation of Test Results ML20246K0751989-05-0303 May 1989 Insp Repts 50-327/89-09 & 50-328/89-09 on 890305-0405. Violations Noted.Major Areas Inspected:Operational Safety Verification,Including Operations Performance,Sys Lineups, Radiation Protection,Safeguards & Housekeeping Insps IR 05000327/19890071989-04-13013 April 1989 Insp Repts 50-327/89-07 & 50-328/89-07 on 890205-0304. Violations Noted.Major Areas Inspected:Operational Safety Verification,Including Operations Performance,Sys Lineups, Radiation Protection,Safeguards & Housekeeping ML20244C3911989-04-0404 April 1989 Insp Repts 50-327/88-50 & 50-328/88-50 on 881212-890126. Violations Noted.Major Areas Inspected:Plant Operations, Surveillance & Sys Outage Control,Corrective Action Program, Maint Activities & Qualified Reviewer Process IR 05000327/19890051989-03-13013 March 1989 Special Team Insp Repts 50-327/89-05 & 50-328/89-05 on 890131-0209.Violations Noted.Major Areas Inspected:Radwaste, Radiological Controls,Corporate QA Audits & Site Chemistry ML20247F3461989-03-13013 March 1989 Special Team Insp Repts 50-327/89-05 & 50-328/89-05 on 890131-0209.Violations Noted.Major Areas Inspected:Radwaste, Radiological Controls,Corporate QA Audits & Site Chemistry IR 05000327/19890061989-03-10010 March 1989 Partially Withheld Insp Repts 50-327/89-06 & 50-328/89-06 on 890123-27 (Ref 10CFR2.790(d) & 73.21).Violation Noted.Major Areas Inspected:Physical Security Program for Reactors, Including Security Mgt,Audit,Barriers,Alarms & Maint IR 05000327/19890021989-03-0909 March 1989 Insp Repts 50-327/89-02 & 50-328/89-02 on 890105-0204.No Violations or Deviations Noted.Major Areas Inspected: Operational Safety Verification Including,Operations Performance,Sys Lineups & Radiation Protection IR 05000327/19890081989-03-0303 March 1989 Insp Repts 50-327/89-08 & 50-328/89-08 on 890213-17. Violations Noted.Major Areas Inspected:Inservice Insp, Including Eddy Current Exam of Unit 2 Steam Generator Tubing,Reviews of NDE Exams Procedures & Exam Verifications 1990-09-26
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARIR 05000327/19990051999-09-27027 September 1999 Insp Repts 50-327/99-05 & 50-328/99-05 on 990718-0828. Violations Noted.Major Areas Inspected:Mitigating Sys IR 05000327/19990041999-08-13013 August 1999 Insp Repts 50-327/99-04 & 50-328/99-04 on 990601-0717.One Potentially Safety Significant Issue Noted.Major Areas Inspected:Licensee Emergency Preparedness IR 05000327/19990031999-06-30030 June 1999 Insp Repts 50-327/99-03 & 50-328/99-03 on 990328-0531.Non- Cited Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint & Engineering IR 05000327/19990021999-04-23023 April 1999 Insp Repts 50-327/99-02 & 50-328/99-02 on 990214-0327.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint & Engineering IR 05000327/19990011999-03-15015 March 1999 Insp Repts 50-327/99-01 & 50-328/99-01 on 990103-0213. Violations Noted & Being Treated as non-cited Violations. Major Areas Inspected:Aspects of Licensee Operations,Maint & Engineering IR 05000327/19983021999-03-12012 March 1999 NRC Operator Licensing Exam Repts 50-327/98-302 & 50-328/98-302 (Including Completed & Graded Tests) for Test Administered on 980928-1001 IR 05000327/19980111999-02-0101 February 1999 Insp Repts 50-327/98-11 & 50-328/98-11 on 981122-990102. Violations Noted.Major Areas Inspected:Licensee Operations, Maint & Engineering ML20202J5471999-02-0101 February 1999 Notice of Violation from Insp on 981122-990102.Violation Noted:Following Unit 1 RT on 981109,procedural Requirements of EOP ES0.1 Were Not Properly Implemented,In That RCS Temperatures Were Not Monitored & Steam Not Dumped IR 05000327/19980101998-12-0707 December 1998 Insp Repts 50-327/98-10 & 50-328/98-10 on 981011-1121.No Violations Noted.Major Areas Inspected:Operations,Maint & Engineering IR 05000327/19980141998-12-0404 December 1998 Insp Repts 50-327/98-14 & 50-328/98-14 on 981102-06.No Violations Noted.Major Areas Inspected:Observation & Evaluation of Biennial Emergency Preparedness Exercise for Sequoyah Nuclear Plan ML20196D6081998-11-24024 November 1998 Notice of Violation from Insp on 980914-1016.Violation Noted:As of 980916,requirements of 0-MI-MXX-061-001 Not Implemented IR 05000327/19980131998-11-24024 November 1998 Insp Repts 50-327/98-13 & 50-328/98-13 on 980914-1016. Violations Noted.Major Areas Inspected:Aspects of Licensee maint,testing,engineering,self-assessment & Problem Evaluations of Licensee Ice Condenser Sys ML20195G5521998-11-0909 November 1998 Notice of Violation from Insp on 980830-1010.Violation Noted:Licensee Failed to Assure That All Testing Required to Demonstrate That Safety Related Circuit Breakers Would Perform Satisfactorily in Svc IR 05000327/19980091998-11-0909 November 1998 Insp Repts 50-327/98-09 & 50-328/98-09 on 980830-1010. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering Plant Support & Effectiveness of Licensee Controls in Identifying,Resolving & Preventing Problems IR 05000327/19980081998-09-18018 September 1998 Insp Repts 50-327/98-08 & 50-328/98-08 on 980719-0829.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support,Licensee Conducted Radiological Emergency Plan Drill ML20237B1851998-08-0404 August 1998 Notice of Violation from Insp on 980606-0718.Violations Noted:On or Before 971103,conditions Adverse to Qualify Were Not Promptly Identified & Corrected,In That Licensee Failed to Correct &/Or Initiate Problem Evaluation Rept IR 05000327/19980071998-08-0404 August 1998 Insp Repts 50-327/98-07 & 50-328/98-07 on 980607-0718. Violations Noted.Major Areas Inspected:Aspects of Licensee Operation,Maint,Engineering,Plant Support & Effectiveness of Licensee Controls in Identifying & Preventing Problems IR 05000327/19980061998-06-26026 June 1998 Insp Repts 50-327/98-06 & 50-328/98-06 on 980426-0606. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support ML20236J6591998-06-26026 June 1998 Notice of Violation from Insp on 980426-0606.Violation Noted:Inservice Testing of Valves Not in Accordance with Section XI of ASME Boiler & Pressure Vessel Code & Applicable Addenda as Required by 10CFR50.55a IR 05000327/19983001998-06-25025 June 1998 NRC Operator Licensing Exam Repts 50-327/98-300 & 50-328/98-300 (Including Completed & Graded Tests) for Tests Administered on 980601-02 IR 05000327/19980051998-06-12012 June 1998 Insp Repts 50-327/98-05 & 50-328/98-05 on 980504-08.No Violations Noted.Major Areas Inspected:Maint Procedure.Insp Team Comprised Region II & Headquarters Personnel.Switchgear & Surrounding Areas Found in Good Matl Condition ML20247L5781998-05-15015 May 1998 Notice of Violation from Insp on 980315-0425.Violation Noted:Licensee Failed to Perform Surveillance Requirement 4.8.1.1.1.a,within 1 H & at Least Once Per 8 H Thereafter ML20216H7701998-04-10010 April 1998 Notice of Violation from Insp on 980201-0314.Violation Noted:License Failed to Rept an Adverse Condition on Work Request/Work Order &/Or Problem Evaluation Rept IR 05000327/19980031998-04-10010 April 1998 Insp Repts 50-327/98-03 & 50-328/98-03 on 980201-0314. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000327/19980991998-04-0101 April 1998 SALP Repts 50-327/98-99 & 50-328/98-99 for Period 960728- 980221 IR 05000327/19980011998-03-30030 March 1998 Insp Repts 50-327/98-01 & 50-328/98-01 on 980126-0213.No Violations Noted.Major Areas Inspected:Operations,Maint & Engineering ML20217K3751998-03-30030 March 1998 Notice of Violation from Insp on 980126-0213.Violation Noted:On Listed Dates,Licensee Made Changes to Facility as Described in FSAR W/O Adequate Written SE Which Provides Bases for Determination That Changes Did Not Involve USQ IR 05000327/19980021998-03-0505 March 1998 Insp Repts 50-327/98-02 & 50-328/98-02 on 980202-06.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations & Maint.Review of Initial & Requalification Training Programs Were Also Conducted IR 05000327/19970181998-02-19019 February 1998 Insp Repts 50-327/97-18 & 50-328/97-18 on 971221-980131. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering,Plant Support & Effectiveness of Licensee Controls in Identifying & Resolving Problems ML20203J5411998-02-19019 February 1998 Notice of Violation from Insp on 971231-980131.Violation Noted:On 980126 Individuals Failed to Monitor Themselves in Whole Body Contamination Monitor or W/Hand & Foot Frisk Monitor ML20216D8431998-02-0606 February 1998 EN-97-109A:on 980206,informs of Withdrawal of Proposed Civil Penalty of $55,000 Issued to Licensee.Credit for Identification Appropriate to Recognize Diligence of TVA Training Instructor Who Discovered Vital Battery Problem IR 05000327/19970171998-01-16016 January 1998 Insp Repts 50-327/97-17 & 50-328/97-17 on 971109-1220.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering,Plant Support & Effectiveness of Licensee Controls in Identifying,Resolving & Preventing Problems IR 05000327/19970141997-12-0808 December 1997 Insp Repts 50-327/97-14 & 50-328/97-14 on 970928-1108.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering,Plant Support,Effectiveness of License Controls in Identifying,Resolving & Preventing Problems ML20197F5541997-12-0808 December 1997 Notice of Violation from Insp on 970725-0704 & Proposed Imposition of Civil Penalty in Amount of $55,000.Violation Noted:Sro Failed to Implement Step 8.4.8 of Soi 0-S0-250-1. Predecisional EC Agenda & Documentation Encl IR 05000327/19970161997-12-0505 December 1997 Insp Repts 50-327/97-16 & 50-328/97-16 on 971103-06.No Violations Noted.Major Areas Inspected:Evaluation of 971017 Wire Damage Event at Electrical Penetration 22 ML20197F6971997-12-0303 December 1997 EN-97-109:on 971208,notice of Proposed Imposition of Civil Penalty in Amount of $55,000 Issued to Licensee.Action Based on Severity Level III Problem Re Failure to Maintain Direct Current Vital Battery Channel Energized & Operable IR 05000327/19973001997-11-0606 November 1997 Exam Repts 50-327/97-300 & 50-328/97-300 on 970919-1007. Exam Results:Four Out of Seven Candidates Passed Exam.One Candidate Was Marginal Performer IR 05000327/19970121997-10-24024 October 1997 Insp Repts 50-327/97-12 & 50-328/97-12 on 970824-0927.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support & Operator Requalification Program IR 05000327/19970151997-10-23023 October 1997 Insp Repts 50-327/97-15 & 50-328/97-15 on 970922-29.No Violations Noted.Major Areas Inspected:Emergency Preparedness PNO-II-97-057, on 971017,discovered 12 of 14 Instrument Cables Damaged in Unit 2 Containment Electrical Penetration. Sequoyah Unit 2 in Outage & All Fuel Removed from Reactor Vessel.Licensee Continues to Investigate Event1997-10-17017 October 1997 PNO-II-97-057:on 971017,discovered 12 of 14 Instrument Cables Damaged in Unit 2 Containment Electrical Penetration. Sequoyah Unit 2 in Outage & All Fuel Removed from Reactor Vessel.Licensee Continues to Investigate Event PNO-II-97-055, on 971006,contaminated Person Transported from Sequoyah Nuclear Plant to Offsite Medical Facility,Following Apparent Heart Attack.Victim Pronounced Dead at Hosp,Due to Apparent Heart Attack.Licensee Responded to Media Inquirie1997-10-0606 October 1997 PNO-II-97-055:on 971006,contaminated Person Transported from Sequoyah Nuclear Plant to Offsite Medical Facility,Following Apparent Heart Attack.Victim Pronounced Dead at Hosp,Due to Apparent Heart Attack.Licensee Responded to Media Inquirie ML20211E2531997-09-22022 September 1997 Notice of Violation from Insp on 970706-0823.Violation Noted:On 970714,containment Isolation Valve 1-FCV-31C-229 Failed to Exhibit Required Change of Obturator Position & Was Not Repaired or Replaced & Data Not Analyzed ML20198H7911997-09-11011 September 1997 Insp Repts 50-327/97-13 & 50-328/97-13 on 970725-0904. Violations Noted.Major Areas Inspected:Insp Scope,Event Synopsis & Observations & Findings IR 05000327/19970061997-07-28028 July 1997 Insp Repts 50-327/97-06 & 50-328/97-06 on 970525-0705. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20141H9531997-07-28028 July 1997 Notice of Violation from Insp on 970525-0705.Violation Noted:Licensee Failed to Implement Prompt Corrective Actions to Resolve Condition Adverse to Quality IR 05000327/19970071997-07-24024 July 1997 Insp Repts 50-327/97-07 & 50-328/97-07 on 970623-27. Violations Noted.Major Areas Inspected:Aspects of Licensee Plant Support ML20149L5671997-07-24024 July 1997 Notice of Violation from Insp on 970623-27.Violation Noted: on 960627,licensee Had Loss of Security Electronic Equipment & Failed to Post Officers in Position to Provide Surveillance of Entire Protected Area Perimeter ML20149G8681997-07-10010 July 1997 Notice of Violation from Insp on 970324-0522.Violation Noted:Licensee Failed to Esatblish Measures to Assure That Significant Condition Adverse to Quality Was Promptly Identified & Corrected & C/A Taken to Preclude Repetition ML20141G0361997-06-20020 June 1997 Notice of Violation from Insp on 970413-0524.Violation Noted:Each Intermediate & Power Range Channel Was Not Subj to Channel Function Test within 12 H Prior to Initiating Physics Test ML20141G0441997-06-20020 June 1997 Insp Repts 50-327/97-04 & 50-328/97-04 on 970413-0524. Violations Noted.Major Areas Inspected:Operations Re Physics Testing,Maint,Engineering & Plant Support 1999-09-27
[Table view] |
Text
..
-
.
[Am K8c,o,*
o UNITED STATES NUCLEAR REGULATORY COMMISSION
%' 's
REGION 11 r
.
h.I
,b.
I 101 MARIETTA STREET. N.W.
- g ATLANTA,GEORGl A 30323 s, m,.
....+
,
Report Nos.:
50-327/85-49 and 50-328/85-49 Licensee: Tennessee Valley Authority 6N11 B Missionary Ridge Place 1101 Market Street Chattanooga, TN 37402-2801 Docket Nos.:
50-327 and 50-328 License Nos.:
DPR-77 and DPR-79 Facility Name:
Sequoyah 1 and 2 Inspection C
.c mber 16-20, 1985
-
.
,
Inspect r.
_.
W.
Date Signed Approved by:
/
f Id J. J. FI Ke, Section Chief
'Date Signed
.ginfering Branch ivision of Reactor Safety
,
SUMMARY
!
Scope:
This routine, unannounced inspection involved 36 inspector-hours on site
!
in the areas of licensee actions on previous enforcement matters pertaining to safety-related cable tray support systems, and safety related pipe support and restraint systems.
Results: One violation was identified - Inspection and installation problems for seismically designed pipe supports, paragraph 5.b.
J
}
l 8603050558 060206
-
PDR ADOCK 05000327 O
,
PDR l
<
..
,
.
.
.
^
REPORT DETAILS 1.
Persons Contacted Licensee Employees
- P. Wallace, Plant Manager
- H. Rankin, Manager, Design Services
- J. Vineyard, Project Manager, Office of Engineering (0E)
- G. Kirk, Compliance Supervisor
- R. Olson, Modification Manager
'
- B. Patter (on, Mainten'ance Superintendent
'
- S. Cowart, Quality Surveillance Supervisor
- G. Boles, Mechanical Maintenance Supervisor
- C. Johnson, Civil Project Engineer, OE
- D. Craven, QA Staff Supervisor
- R. Birchell, Mechanical Engineer, Compliance L. Katcham, Civil Engineer, OE
'
Other licensee employees contacted included QC inspectors, craftsmen, engineers, technicians, security force members, and of fice personnel.
NRC Resident Inspector
- N. Jenison, Senior Resident Inspector
- Attended exit interview 2.
Exit Interview The inspection scope and findings were summarized on December 20, 1985, with those persons indicated in paragraph 1 above.
The inspector described the areas inspected and discussed in detail the inspection findings listed below.
No dissenting comments were received from the licensee.
(0 pen) Violation 327, 328/85-49-01, Inspection and installation problems for seismically designed pipe supports, paragraph 5.b.
(0 pen) Inspector Followup Item 327, 328/85-49-02, Determination of locking devices for support installations, paragraph 6.a.
The licensee did not identify as proprietary any of the materials provided to or reviewed by the inspector during this inspection.
3.
Licensee Action on Previous Enforcement Matters
'
a.
(Closed) Violation 327, 328/85-29-01, Inadequate design controls for i
seismically designed cable tray supports.
TVA's letter of response
,
dated November 25, 1985, has been reviewed and determined to be
'
,
'
-
-
-
-
- - -
- - -
- -
- -
- - - - - -. - -
-
- - - - - - - - - - - - - - - -
_
..
--
._ _ - - -
_._
_-.
~. - - _ - - _ -
--
-
..-
.
_
..
,
..,
.
<
.
acceptable by Region II.
'The inspector held discussions with
,
i licensee's representatives and examined the corrective actions as
)
stated in the letter of response.
'
i The inspector concluded that TVA had determined the full extent of the
subject violation, performed the necessary survey and followup actions to correct the present conditions and developed the necessary corrective actions to preclude recurrence of similar circumstances.
,
The corrective actions identified in the letter of response have been i
implemented, t
'
b.
(Closed) Violation 327, 328/85-29-02, Inadequate design control for safety-related cable tray support baseplate installations.
TVA's
,
letter of response dated November 25, 1985, has been reviewed and
'
determined to be acceptable by Region II.
The inspector held discussions with licensee's representatives and examined the corrective i
actions as stated in the letter of response.
The inspector concluded
that TVA had determined the full extent of the subject violation,
'
i performed the necessary survey and followup actions to correct the present conditions and developed the necessary corrective actions to
<
preclude recurrence of similar circumstances.
The corrective actions
'
j identified in the letter of response have been implemented.
4.
Unresolved Items
j Unresolved items were not identified during the inspection.
l j
5.
Safety-Related Pipe Support and Restraint Systems
>
a.
Review of Work Procedures and Design Documents The inspector reviewed portions of the following inspection procedures i
and design documents pertaining to safety-related pipe support and restraint systems to determine whether they comply with NRC
,
i requirements and the licensee's commitments.
SNP Instruction No. 66, Inspection of Supports, March 1, 1983
-
i Modifications and Additions Instruction M&AI-9, Inspection of
-
Bolted Connections, July 5, 1983
1 Pipe Support Design Manual, Volume 4,
Manufacturer's Catalog
-
Information, April 22, 1983
.
]
SQN-DC-V-13.3, Detailed Analysis of Category I Piping Systems,
-
August 13, 1984 l
.
I O
i
i..
,
..
.
~
.
b.
Field Inspection of Pipe Sup' ports and Baseplates The following pipe supports including baseplates were partially inspected to determine whether they were properly installed and inspected in accordance with established procedures.
Support Number Piping System
'
- 2-SIH-444A, Rev. 1 Safety Injection
-
1-ERCWH-515, Rev. 3 Essential Raw Cooling Water
- 1-FS-040, Rev. 4 Fire Suppression
- 1-FS-045, Rev. 7 Fire Suppression e
'
- 1-47A059-14 Rev. O Chilled Water Supply
- Indicate discrepancies identified during the inspection.
,
- Indicates dead-load supports attached to seismic Class I structures.
The above pipe supports, in general, were installed in accordance with design documents with the exception of the supports identified below:
(1) Support No. 1-AF0H-244 Rev. 7, pipe clamp bolt on the snubber side was loose.
(2) Support No. 1-AFDH-254, Rev. 6, jam nut on the structural attachment side of the sway strut was loose.
(3) Support No. 1-AFDH-411, Rev. 1, item 2 of the vertical rod was bent.
(4) Support No. 2-SIH-444A, Rev.1, one of the two vertical trapeze rods was disconnected.
(5) Support No. 1-47A059-14, one of the two vertical trapeze rods was broken.
(6) Support No. 1-FS-040, Rev. 4, jam nut was loose.
(7) Support No. 1-FS-045, Rev 7, jam nut was loose.
The above items (1), (2), (3) and (4) are seismically designed l
supports; (5), (6) and (7) ate dead-load supports that are attached to i
seismic Class I structures.
SNP Inspection Instruction No. 66,
'
inspection of supports, requires that installation conforms to
-
-
-
-
.
..
_
.-.
..
,
..
.
.
'
I applicable drawings and that all bolts are properly engaged and tightened.
10 CFR 50, Appendix B, Criterion V,
requires that activities affecting quality shall.be prescribed by documented
.
instructions, procedures and drawings, and shall be accomplished in
'
accordance with these instructions, procedures and drawings.
Results of the field inspections indicate that portions of the aforementioned pipe supports failed to satisfy the licensee's instructions and the NRC requirements.
As a result, these supports may not be able to perform their intended function as required by the design.
This matter is identified as Violation 327, 328/85-49-01, Inspection and installation
,
problems for seismically designated pipe supports.
'
Within the areas inspected, one violation was identified.
o
.
-
6.
Technical Discussions
-
l a.
Locking Device During the inspection, the inspector noted that many of the installed threaded fasteners that were utilized in the support installations showed no locking devices. Where pipe clamps were used for snubber or
'
sway strut connections, only a single nut was installed. The inspector
reviewed volume 4 of the Sequoyah Pipe Support Design Manual.
It was
'
found that a special instruction was noted on the manufacturer's I
drawing for standard pipe clamps.
This special instruction requires j
that all hex nuts be replaced with two jamnuts for nuclear use. The i
second jamnut serves only as a locking device.
The inspector held l
discussions with licensee's representatives regarding the above l
concerns. The inspector noted that the office of engineering had not I
informed the maintenance / modification group that a locking device l
should have been used in the support installations. Pending resolution with respect to the above concerns between the office of engineering I
l and the maintenance / modification group, this matter is identified as Inspector Fo.;owup Item 327, 328/85-49-02, Determination of locking devices for support installations.
)
b.
Bolted Connections for Supports The inspector reviewed Modifications and Additions Instruction M&Al-9,
,
inspection of bolted connections, paragraph 8.0 of the instruction
'
states that bolts with washers shall show no visible evidence of slack
,
l and the bolt shall be verified to be, as a minimum, handtight. There is no definition given as to what the HANOTIGHT physically means in terms of installation and inspection requirements. The inspector held
,
discussions with two QC inspectors and two maintenance / modification l
engineers regarding the physical meaning of HANDTIGHT.
None of the l
above personnel understood the meaning of HANDTIGHT requirements. This l
indicates that the procedure shows a lack of understanding by the personnel who are responsible for implementing quality work activities.
Within the areas inspected, no vi.olations or deviations were identified.
l
-
-
. - - _
_ _ _
_
_ _ _
_
__ __
_ _.. -
_ _. _
_
_
_
_
-
u
)
.
Tennessee Valley Authority i
ATTN: Mr. Steven A. White Manager of Power and
'
Engineering (Nuclear)
6N38 A Lookout Place
.
1101 Market Street
]
Chattanooga, TN 37402-2801 I
Gentlemen:
SUBJECT: REPORT NOS. 50-327/85-49 AND 50-328/85-49 On December 16-20, 1985, NRC inspected activities authorized by NRC Operating License Nos. DPR-77 and DPR-79 for your Sequoyah facility. At the conclusion of i
the inspection, the findings were discussed with those members of your staff
identified in the enclosed inspection report.
,
'
Areas examined during the inspection are identified in the report. Within these areas, the inspection consisted of selective examinations of procedures and representative records, interviews with personnel, and observation of activities
]
in progress.
The inspection findings indicate that certain activities violated NRC require-
ments.
The violations, references to pertinent requirements, and elements to be
'
included in your response are presented in the enclosed Notice of Violation.
The responses directed by this letter and the enclosures are not subject to the clearance proceduret of the Office of Management and Budget issued under the Paperwork Reduction Act of 1980, PL 96-511.
j
,
j Should you have any questions concerning this letter, please contact us.
)
Sincerely,
I John A. Olshinski Deputy Regional Administrator for TVA I
En:losures:
(See page 2)
I l
!
l
.
_
.-
_.
-
- _ _
_.
-
_.-
.
,_
i Tennessee Valley Authority
Enclosures:
'
i 1.
Notice of Violation
.
2.
Inspection Report Nos. 50-327/85-49 and 50-328/85-49 cc w/encls:
H. L. Abercrombie, Sequoyah Nuclear Plant Site Director P. R. Wallace, Plant Manager K. W. Whitt, Chief, Nuclear
,
Safety Review Staff t
i D. L. Williams, Jr., Supervisor
Licensing Section G. B. Kirk, Compliance Staff Supervisor r
'
J. E. Wills, Project Engineer
.
bec w/encis:
l Document Control Desk
'
State of Tennessee bec w/ enc 1:
i J. N. Grace H. R. Denton, NRR
H. L. Thompson, NRR l
J. M. Taylor, IE B. B. Hayes, 01
,
]
NRC Resident Inspector
'
1 l
!
!
l l
!
RII RI!
RII RII RII WLiu:bhg JBlake AHerdt AGibson DVerrelli 1/ /86 1/ /86 1/ /86 1/ /86 1/ /86
!
i
.
[4080o UNITED STATES
'o,'
NUCLE AR REGULATORY COMMISSION
%' '
RE GION ll E
O 101 MARIETTA STREET.N.W.
ATLANTA, GEORGI A 30323 gv**.../
Report Nos.:
50-327/85-49 and 50-328/85-49 Licensee:
Tennessee Valley Authority 6N11 B Missionary Ridge Place 1101 Market Street Chattanooga, TN 37402-2801 Docket Nos.:
50-327 and 50-328 License Nos.: DPR-77 and DPR-79 Facility Name:
Sequoyah 1 and 2 Inspection Conducted: December 16-20, 1985 Inspector:
__
Date Signed W. C. Liu Approved by:
J. J. Blake, Section Chief Date Signed Engineering Brarch Division of Reactor Safety SUMMARY Scope:
This routine, unannounced inspection involved 36 inspector-hours on site in the areas of licensee actions on previous enforcement matters pertaining to safety-related cable tray support systems, and safety-related pipe support and restraint systems.
Results: One violation was identified - Inspection and installation problems for seismically designed pipe supports, paragraph 5.b.
y
-
-
-- -
-
-
- -- -
-- -
-
_ -
_-.
.
.__-
-
--
_-.
-
--
_
. - -
.
.
.
i
'
REPORT DETAILS i
l 1.
Persons Contacted Licensee Employees
- P. Wallace, Plant Manager
- H. Rankin, Manager, Design Services
,
i
- J. Vineyard, Project Manager, Office of Engineering (OE)
- G. Kirk, Compliance Supervisor
'
- R. Olson, Modification Manager
- B. Patterson, Maintenance Superintendent
- S. Cowart, Quality Surveillance Supervisor
.
- G. Boles, Mechanical Maintenance Supervisor
,
- C. Johnson, Civil Project Engineer, OE i
j
- D. Craven, QA Staff Supervisor
- R. Birchell, Mechanical Engineer, Compliance
L. Katcham, Civil Engineer, OE
i
Other licensee employees contacted included QC inspectors, craf tsmen,
engineers, technicians, security force members, and office personnel.
!
l l
NRC Resident Inspector i
I j
- K. Jenison, Senior Resident Inspector
1
,
1 2.
Exit Interview
!
!
The inspection scope and findings were summarized on December 20, 1985, with
,
those persons indicated in paragraph 1 above.
The inspector described the i
areas inspected and discussed in detail the inspection findings listed
!
below. No dissenting comments were received from the licensee.
(0 pen) Violation 327,328/85-49-01, Inspection and installation problems for
!
seismically designed pipe supports, paragraph 5.b.
,
l (0 pen) Inspector Followup Item 327, 328/85-49-02, Determination of locking i
l devices for support installations, paragraph 6.a.
The licensee did not identify as proprietary any of the materials provided j
to or reviewed by the inspector during this inspection.
3.
Licensee Action on Previous Enforcement Matters a.
(Closed) Violation 327, 328/85-29-01, Inadequate design controls for seismically designed cable tray supports.
TVA's letter of response
,
dated November 25, 1985, has been reviewed and determined to be
,
,
d
.
.
.
-
. _ _ - -
-- __
. -. _ - - - -
. _ -
.
. _ -.
-_
.
-
.
.
.
acceptable by Region II.
The inspector held discussions with I
licensee's representatives and examined the corrective actions as stated in the letter of response, The inspector concluded that TVA had determined the full extent of the i
'
subject violation, performed the necessary survey and followup actions l
to correct the present conditions and developed the necessary corrective actions to preclude recurrence of similar circumstances.
The corrective actions identified in the letter of response have been I
implemented, b.
(Closed) Violation 327, 328/85-29-02, Inadequate design control for safety-related cable tray support baseplate installations.
TVA's letter of response dated November 25, 1985, has been reviewed and I
determined to be acceptable by Region II.
The inspector held I
discussions with licensee's representatives and examined the corrective actions as stated in the letter of rt:sponse.
The inspector concluded that TVA had determined the full extent of the subject violation.
l performed the necessary survey and followup actions to correct the
'
present conditions and developed the necessary corrective actions to preclude recurrence of similar circumstances.
The corrective actions identified in the letter of response have been implemented.
4.
Unresolved Items Unresolved items were not identified during the inspection.
5.
Safety-Related Pipe Support and Restraint Systems a.
Review of Work Procedures and Design Documents The inspector reviewed portions of the following inspection procedures and design documents pertaining to safety-related pipe support and
!
restraint systems to determine whether they comply with NRC
-
requirements and the licensee's conmitments.
{
SNP Instruction No. 66 Inspection of Supports, March 1, 1983
-
Modifications and Additions Instruction M&AI-9, Inspection of
-
Bolted Connections, July 5, 1983 Pipe Support Design Manual, Volume 4 Manufacturer's Catalog
-
Information, April 22, 1983
,
SQN-DC-V-13.3, Detailed Analysis of Category I Piping Systems, l
-
August 13, 1984 i
- - - -
-
..
- -
- - -
.-.
- -.
--
. -. _ _ _ _
.. _
.. _ _ -
.
. _ -.
.
!
l
l l
b.
Field Inspection of Pipe Supports and Baseplates The following pipe supports including baseplates were partially inspected to determine whether they were properly installed and inspected in accordance with established procedures, j
Support Number Piping System
'
- 2-S!H-444A, Rev. 1 Safety Injection 1-ERCWH-515, Rev. 3 Essential Raw Cooling Water
- 1-FS-Od9,Rev.4 Fire Suppression
- 1-FS-045, Rev. 7 Fire Suppression
- 1-47A059-14, Rev. O Chilled Water Supply
- Indicate discrepancies identified during the inspection.
,
- Indicates dead-load supports attached to seismic Class 1 structures.
The above pipe supports, in general, were installed in accordance with design documents with the exception of the supports identified below:
(1) Support No.1-AFDH-244, Rev. 7, pipe clamp bolt on the snubber side was loose.
(2) Support No. 1-AFDH-254, Rev. 6 Jam nut on the structural attachment side of the sway strut was loose.
(3)
Support No.1-AFDH-411, Rev.1, item 2 of the vertical rod was
,
bent.
l
!
(4) Support No. 2-SIH-444A, Rev.1, one of the two vertical trapeze
,
rods was disconnected.
j
!
(5) Support No. 1-47A059-14, one of the two vertical trapeze rods was
!
broken.
l (6) Support No. 1-FS-040, Rev. 4, Jam nut was loose.
(7) Support No. 1-FS-045, Rev. 7. jam nut was loose.
The above items (1), (2), (3) and (4) are seismically designed supports (5), (6) and (7) are dead-load supports that are attached to seismic Class 1 structures.
SNP Inspection Instruction No. 66, inspection of supports, requires that installation conforms to
I
-
-
applicable drawings and that all aolts are properly engaged and tightened.
10 CFR 50, Appendix B, Criterion V,
requires tha t activities affecting quality shall be prescribed by documented instructions, procedures and drawings, and shall be accomplished in accordance with these instructions, procedures and drawings.
Results of the field inspections indicate that portions of the aforementioned pipe supports failed to satisfy the licensee's instructions and the NRC requirements.
As a result, these supports may not be able to perform their intended function as required by the design.
This matter is identified as Violation 327, 328/85-49-01, Inspection and installation problems for seismically designated pipe supports.
Within the areas inspected, one violation was identified.
6.
Technical Discussions a.
Locking Device During the inspection, the inspector noted that many of the installed threaded fasteners that were utilized in the support installations showed no locking devices.
Where pipe clamps were used for snubber or sway strut connections, only a single nut was installed. The inspector reviewed volume 4 of the Sequoyah Pipe Support Design Manual.
It was found that a special instruction was noted on the manufacturer's drawing for standard pipe clamps.
This special instruction requires that all hex nuts be replaced with two jamnuts for nuclear use.
The second jamnut serves only as a locking device.
The inspector held discussions with licensee's representatives regarding the above concerns.
The inspector noted that the office of engineering had not informed the maintenance / modification group that a locking device should have been used in the support installations. Pending resolution with respect to the above concerns between the office of engineering and the maintenance / modification group, this matter is identified as Inspector Followup Item 327, 328/85-49-02, Determination of locking devices for support installations.
b.
Bolted Connections for Supports The inspector reviewed Fodifications and Additions Instruction M&AI-9, inspection of bolted co.,nections, paragraph 8.0 of the instruction states that bolts with washers shall show no visible evidence of slack dnd the bolt shall be verified to be, as a minimum, handtight.
There is no definition given as to what the HANDTIGHT physically means in terms of installation and inspection requirements. The inspector held discussions with two QC inspectors and two maintenance / modification engineers regarding the physical meaning of HANDTIGHT.
None of the above personnel understood the meaning of HANDTIGHT requirements.
This indicates that the procedure shows a lack of understanding by the personnel who are responsible for implementing quality work activities.
Within the areas inspected, no violations or deviations were identified.