- ML20154Q352 + (15:44:27, 24 May 2025)
- ML20154Q260 + (15:44:59, 24 May 2025)
- ML20154Q225 + (15:45:13, 24 May 2025)
- ML20154Q197 + (15:45:22, 24 May 2025)
- ML20154Q150 + (15:45:34, 24 May 2025)
- TAC:66258 + (15:46:11, 24 May 2025)
- ML20154P999 + (15:50:36, 24 May 2025)
- ML20154P980 + (15:50:44, 24 May 2025)
- ML20154P966 + (15:50:53, 24 May 2025)
- ML20154P962 + (15:50:54, 24 May 2025)
- ML20154P897 + (15:51:12, 24 May 2025)
- ML20154P813 + (15:51:45, 24 May 2025)
- ML20154P788 + (15:51:52, 24 May 2025)
- ML20154P720 + (15:52:11, 24 May 2025)
- ML20154P704 + (15:52:16, 24 May 2025)
- ML20154P605 + (15:52:44, 24 May 2025)
- ML20154P570 + (15:52:54, 24 May 2025)
- 05000298/LER-1988-022, :on 880827,while Surveillance Testing of HPCI, Sys Revealed That Rated Flow Conditions Could Not Be Achieved within Design Basis Time Limit of 25 Seconds.Caused by Malfunctioning EGM Control Box.Spare Box Installed + (15:52:59, 24 May 2025)
- IR 05000272/1998202 + (15:53:40, 24 May 2025)
- 05000254/LER-1998-019, :on 980917,high RP Permissive Switch to RHR Shutdown Cooling Sys Would Not Close & Would Not Calibrate. Caused by Switch Aging.Failed Switch Was Electrically Disarmed Per TS 3.2.A,Action 2 + (15:54:34, 24 May 2025)
- ML20154P257 + (15:54:39, 24 May 2025)
- ML20154P208 + (15:54:56, 24 May 2025)
- ML20154P192 + (15:55:02, 24 May 2025)
- 05000254/LER-1998-021, :on 980918,weekly Position Verification of RB to Suppression Chamber Cv Vacuum Breakers Was Misinterpreted & Not Perfromed.Caused by Inadequate Development of Specification.Implemented Procedure Changes + (15:56:08, 24 May 2025)
- IR 05000361/1988013 + (15:56:29, 24 May 2025)
- ML20154N895 + (15:56:36, 24 May 2025)
- ML20154N799 + (15:57:01, 24 May 2025)
- 05000498/LER-1998-006, :on 980928,failure to Fully Meet TS SR 4.0.5 for Containment Isolation Check Valves Was Noted.Caused by Inadequate Change Mgt.Entered Into TS 3.6.3 & Tested Four Valves in Unit 2 + (15:57:03, 24 May 2025)
- 05000498/LER-1998-008, :on 980909,TS 3.0.3 Was Entered Due to Inoperable Rod Control Demand Step Counters.Caused by Inadequate Communication Between CR Staff & Maint Personnel.Detailed Discussions of Lessons Learned Held + (15:57:11, 24 May 2025)
- TAC:63043 + (15:58:11, 24 May 2025)
- ML20154N512 + (15:58:20, 24 May 2025)
- ML20154N455 + (15:58:34, 24 May 2025)
- ML20154N453 + (15:58:35, 24 May 2025)
- ML20154N437 + (15:58:39, 24 May 2025)
- ML20154N420 + (15:58:43, 24 May 2025)
- TAC:62264 + (15:59:08, 24 May 2025)
- IR 05000029/1988099 + (15:59:21, 24 May 2025)
- ML20154N252 + (15:59:44, 24 May 2025)
- ML20154N180 + (16:00:11, 24 May 2025)
- ML20154N145 + (16:00:20, 24 May 2025)
- ML20154N025 + (16:00:57, 24 May 2025)
- ML20154M923 + (16:01:30, 24 May 2025)
- ML20154M880 + (16:01:42, 24 May 2025)
- TAC:00022 + (16:03:06, 24 May 2025)
- ML20154M564 + (16:03:17, 24 May 2025)
- ML20154M547 + (16:03:24, 24 May 2025)
- L-98-203, Application for Amend to License NPF-73,incorporating Temporary License Condition That Would Extend TS Surveillance Interval,Specified in Surveillance Requirement 4.8.1.1.1.b to First Entry Into Mode 4 After Cycle 7 RFO + (16:03:59, 24 May 2025)
- 05000413/LER-1998-015-01, Forwards LER 98-015-01, TS Required Shutdown & Operation Prohibited by TS Associated with Ice Condenser. Rev 0 to Ler,Dtd 980902,contained Abstract Since Event Investigation Had Not Been Completed.Rev 1 Contains All 10CFR50. + (16:04:10, 24 May 2025)
- ML20154M370 + (16:04:21, 24 May 2025)